Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML031360587 + (Project Director Reassignment. Informs That Effective May 19, 2003, Mr. Cornelius Holden Has Been Assigned Director, Project Directorate I, Division of Licensing Project Management)
- ML020980284 + (Project Director and Section Chief Reassignment)
- ML021000115 + (Project Director and Section Chief Reassignment Letter)
- ML021000091 + (Project Director and Section Chief Reassignment Letter)
- ML021000064 + (Project Director and Section Chief Reassignment Letter)
- ML020950673 + (Project Director and Section Chief Reassignment Letter)
- ML020950620 + (Project Director and Section Chief Reassignment Letter)
- ML020950567 + (Project Director and Section Chief Reassignment Letter)
- ML021000017 + (Project Director and Section Chief Reassignment Letters)
- IR 05000498/2024050 + (Project Electric Generating Station, Units 1 and 2 - NRC Special Inspection Report 05000498/2024050 and 05000499/2024050 and Preliminary White Finding)
- ML18010A911 + (Project Emergency Preparedness Exercise)
- ML17272A907 + (Project Engineering Directive Re Preparation of Partial Penetration Weld Joint to Be Used on Sacrificial Wall)
- ML17272A908 + (Project Engineering Directive Re Preparation for Welding by Dual Shield Fcaw Process)
- ML17272A906 + (Project Engineering Directive Re Replacement of Slot Welds W/Partial Penetration Welds)
- ML17272A905 + (Project Engineering Directive Re Replacement of Slot Welds W/Partial Penetration Welds)
- ML20216E289 + (Project Health & Safety Plan)
- ML19263D952 + (Project IV Suppl to Physical Security Plan for GEs Morris Il Operation)
- ML20151T502 + (Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2)
- ML13330A632 + (Project Instruction 1, Structural Steel Member Evaluation)
- ML20263Q492 + (Project Layout:Stabilization of Hartsville Plant B Area)
- ML24012A103 + (Project Long Mott (X-energy-Dow) Public Outreach Meeting - 2/15/2024)
- ML25239B547 + (Project Long Mott Docs - (External_Sender) Re U.S. NRC Request to Initiate NHPA Section 106 Consultation for the Proposed Long Mott Generating Station in Calhoun County, Tx)
- ML25281A305 + (Project Long Mott Docs - Draft Request for Confirmatory Information (RCI) Revision 1)
- ML25132A212 + (Project Long Mott Docs - ESA Section 7 Questions and the Use of Information for Planning and Consultation (Ipac))
- ML25160A180 + (Project Long Mott Docs - FW FW Consult Response from Comanche Nation Historic Preservation Office)
- ML25160A175 + (Project Long Mott Docs - FW FW Consult Response)
- ML25177A124 + (Project Long Mott Docs - FW Information Needs Revision 1 - Land Use (Lu) - 3)
- ML25239B549 + (Project Long Mott Docs - FW Re U.S. NRC Request to Initiate NHPA Section 106 Consultation for the Proposed Long Mott Generating Station in Calhoun County, Tx)
- ML25239B548 + (Project Long Mott Docs - FW Re U.S. NRC Request to Initiate NHPA Section 106 Consultation for the Proposed Long Mott Generating Station in Calhoun County, Tx)
- ML25247A249 + (Project Long Mott Docs - FW Re U.S. NRC Request to Initiate NHPA Section 106 Consultation for the Proposed Long Mott Generating Station in Calhoun County, Tx)
- ML25177A122 + (Project Long Mott Docs - Information Needs Revision 1 - Land Use (Lu) - 3)
- ML25223A222 + (Project Long Mott Docs - Lmgs Information Needs Resolvednot Yet Received Status)
- ML25269A047 + (Project Long Mott Docs - Long Mott Generating Station - Request for Confirmatory Information (RCI) - Draft)
- ML25281A311 + (Project Long Mott Docs - Long Mott Generating Station Environmental Review - Draft Request for Additional Information (RAI))
- ML25259A216 + (Project Long Mott Docs - Long Mott Generating Station Environmental Information Needs Revision 5)
- ML25241A176 + (Project Long Mott Docs - Long Mott Station Site Audit Plan (ML25240B607) for September 8 - 10, 2025)
- ML25261A326 + (Project Long Mott Docs - Potential Typographical Errorsincorrect Units in the Environmental Report for Your Consideration)
- ML25127A442 + (Project Long Mott Docs - Process Questions After Acceptance)
- ML25247A199 + (Project Long Mott Docs - Re Re Project Long Mott Environmental Audit Check-in and Food Options)
- ML25238A198 + (Project Long Mott Docs - Re Re U.S. NRC Request to Initiate NHPA Section 106 Consultation for the Proposed Long Mott Generating Station in Calhoun County, Tx)
- ML25238A061 + (Project Long Mott Docs - Request for Endangered Species Act (ESA) and Essential Fish Habitat (EFH) Consultations with Fish and Wildlife Service on Site)
- ML25174A248 + (Project Long Mott Docs - Request for Information Needs for Long Mott Generating Station)
- ML25268A056 + (Project Long Mott Docs - WRN-1 Possible Approach for Consideration)
- ML24250A185 + (Project Long Mott Draft PSAR Readiness Assessment)
- ML24250A186 + (Project Long Mott Draft PSAR Readiness Assessment Plan - August 2024)
- ML24298A222 + (Project Long Mott PSAR Readiness Assessment LIC-116 Scope Updates)
- ML103160538 + (Project Manage Reassignment)
- ML20189A193 + (Project Management Assignment)
- ML20073F687 + (Project Management Assignment to Robert F. Kuntz Effective March 16, 2020)
- ML20073F642 + (Project Management Assignment to Scott P. Wall Effective March 16, 2020)
- ML20073F668 + (Project Management Assignment to Surinder S. Arora Effective March 16, 2020)