Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212D283 + (Predecisional Enforcement Conference Rept 70-7001/97-13 on 971009.Major Areas Discussed:Uncontrolled Classified Matter in Areas Outside Paducah Plant Control Access Area or Available Individuals W/O Q or L Access Authorization)
- ML20149J439 + (Predecisional Enforcement Conference Rept 97-7001/97-05 on 970716.Major Areas Discussed:Five Apparent Violations Noted in Insp Rept.W/Viewgraphs)
- IR 05000440/1996016 + (Predecisional Enforcement Conference Rept on 970418.Areas Discussed:Violations Noted in Insp Repts 50-440/96-16, 50-440/96-17 & 50-440/96-18 & Corrective Actions)
- IR 015000019/1997002 + (Predecisional Enforcement Conference Rept 15000019/97-02 Conducted on 970516.Areas Discussed:Apparent Violations Identified During 970417-18 Insp)
- IR 05000295/1997031 + (Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements)
- IR 05000373/1996015 + (Predecisional Enforcement Conference Repts 50-373/96-15 & 50-374/96-15 on 960717-0820.Purpose of Conference Was to Discuss Apparent Violations,Root Causes,Contributing Factors & Licensees C/As)
- ML20212A372 + (Predecisional Enforcement Conference Rept on 971007.Areas Discussed:Apparent Violations Identified During Insp & CA Taken or Planned by Licensee.Apparent Violations Involved SE That Failed to Identify Unreviewed Safety Question)
- ML20149H996 + (Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions)
- IR 05000317/1997061 + (Predecisional Enforcement Conference Repts 50-317/97-61 & 50-318/97-61 on 970612.Major Areas Discussed:Apparent Violations Identified During Insps Conducted on 970302-0424 Re Series of Problems Occurring During Fuel Handling)
- ML113470640 + (Predecisional Enforcement Conference Summary NRC Investigation Report 4-2010-064)
- ML24065A471 + (Predecisional Enforcement Conference Summary - Empire Wireline LLC (February 20, 2024))
- ML18051A599 + (Predecisional Enforcement Conference Summary)
- ML21069A106 + (Predecisional Enforcement Conference Transcript for TVA (EA-20-006 & EA-20-007))
- IA-20-008, Predecisional Enforcement Conference Transcript for Joe Shea (IA-20-008) + (Predecisional Enforcement Conference Transcript for Joe Shea (IA-20-008))
- ML19057A256 + (Predecisional Enforcement Conference Transcript from January 24, 2019)
- ML021990148 + (Predecisional Enforcement Conference on 08/02/2002)
- PMNS20181058, Predecisional Enforcement Conference with Source Production & Equipment Company, Inc + (Predecisional Enforcement Conference with Source Production & Equipment Company, Inc)
- PMNS20190029, Predecisional Enforcement Conference with Southern California Edison Company + (Predecisional Enforcement Conference with Southern California Edison Company)
- PMNS20210105, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station + (Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station)
- PMNS20210096, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station + (Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station)
- ML24029A163 + (Predecisional Enforcement Conference with Empire Wireline, LLC)
- PMNS20240059, Predecisional Enforcement Conference with International Isotopes, Inc + (Predecisional Enforcement Conference with International Isotopes, Inc)
- ML19035A301 + (Predecisional Enforcement Conference, January 24, 2019, Webinar Public Questions Transcript)
- ML20135B685 + (Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee)
- ML18019A559 + (Predicted Behavior of Containment Bldg During Structural Integrity Test)
- Information Notice 1998-29, Predicted Increase in Fuel Rod Cladding Oxidation + (Predicted Increase in Fuel Rod Cladding Oxidation)
- 05000387/FIN-2010003-06 + (Predicted Plant Response to Large transient With ICS)
- ML20070J246 + (Predicted Rates of Formation of Iodine Hydrolysis Species at Ph Levels,Concentrations,And Temperatures Anticipated in LWR Accidents)
- ML19305A780 + (Predicted Steady State Thermal-Hydraulic Performance of Fuel & Blanket Assemblies in Plant Heterogeneous Core, Revision 1)
- ML19319D132 + (Predicted Thermal Plume Resulting from Operation of Units 1,2 & 3)
- TSTF-406 + (Predicting END-OF-CYCLE Mtc and Deleting Need for END-OF-CYCLE Mtc Verifiation (NPSD-911-A))
- ML18215A309 + (Predicting Leakage Trough Composite Landfill Liners)
- ML18215A308 + (Predicting Leakage Trough Composite Landfill Liners)
- ML19338C735 + (Predicting Life Expectancy & Simulating Age of Complex Equipment Using Accelerated Aging Techniques)
- ML18215A277 + (Predicting Long-Term Percolation from the Sdf Closure Cap)
- ML22166A350 + (Predicting Pipe Rupture Frequencies Using Xlpr)
- ML24326A231 + (Predicting Rupture Pressure and Leak Rate of Alloy 600 Tubes with ODSCC and Comparing with Test Results)
- ML20149H493 + (Predicting the Pressure Driven Flow of Gases Through MICRO- Capillaries and MICRO-ORIFICES)
- ML20088A118 + (Prediction and Experiment Comparisons for German Standard Problem 4A:PIPING Response to Blowdown)
- ML20235L741 + (Prediction and Mitigation of EROSIVE-CORROSIVE Wear in Secondary Piping Systems of Nuclear Power Plants)
- ML18215A297 + (Prediction in Geoenvironmental Engineering: Recommendations for Reliable Predictive Modeling)
- ML20195D829 + (Prediction of Check Valve Performance and Degradation in Nuclear Power Plant Systems)
- ML20059D343 + (Prediction of Check Valve Performance and Degradation in Nuclear Power Plant Systems - Wear and Impact Tests.Final Report,September 1988 - April 1990)
- ML20134K597 + (Prediction of Environmentally Assisted Cracking in Bwrs: Part I:Unirradiated Stainless Steel Components)
- ML20087P060 + (Prediction of FAR-FIELD Subsurface Radionuclide Dispersion Coefficients from Hydraulic Conductivity Measurements.A Multidimensional Stochastic Theory with Application to Fractured Rocks)
- ML19345B783 + (Prediction of Fftf Natural Circulation Test Results Using Clinch River Breeder Reactor Plant Project Methodology)
- ML19257B780 + (Prediction of Net Radon Emission from Model Open Pit U Mine)
- ML20097D342 + (Prediction of Nonlinear Structural Response in LMFBR ELEVATED-TEMPERATURE Piping)
- ML20141A132 + (Prediction of Onset of Fission Gas Release from Fuel in Generic Bwr)
- ML20209E979 + (Prediction of Pool Void Fraction by New Drift Flux Correlation)
- ML20210L745 + (Predictions of J-R Curves with Large Crack Growth from Small Specimen Data)