Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NLS2015027, Post Accident Monitoring Instrumentation 14-Day Report, Per Technical Specification Section 5.6.6 + (Post Accident Monitoring Instrumentation 14-Day Report, Per Technical Specification Section 5.6.6)
- ML20266E425 + (Post Accident Monitoring Panel AI-66A Annunciator Arrangement and Elementary Diagram. Sheet 5 of 5.No Rev Date)
- ML20266E405 + (Post Accident Monitoring Panel AI-66A Arrangement. Sheet 1 of 5)
- ML20266E401 + (Post Accident Monitoring Panel AI-66A Wiring Diagram. Sheet 3 of 5.Rev Date Illegible)
- ML20266E422 + (Post Accident Monitoring Panel AI-66A Wiring Diagram. Sheet 2 of 5.No Rev Date)
- ML20266E417 + (Post Accident Monitoring Panel AI-66B Annunciator Arrangement and Elementary Diagram. Sheet 5 of 5)
- ML20266E413 + (Post Accident Monitoring Panel AI-66B Arrangement. Sheet 1 of 5.No Rev Date)
- ML20266E410 + (Post Accident Monitoring Panel AI-66B Wiring Diagram. Sheet 3 of 5.Rev Date Illegible)
- ML20266E396 + (Post Accident Monitoring Panel AI-66B Wiring Diagram. Sheet 2)
- ML14038A121 + (Post Accident Monitoring Report)
- ML12334A380 + (Post Accident Monitoring Report)
- ML12181A200 + (Post Accident Monitoring Report)
- ML103630359 + (Post Accident Monitoring Report)
- RA18-084, Post Accident Monitoring Report + (Post Accident Monitoring Report)
- RA17-072, Post Accident Monitoring Report + (Post Accident Monitoring Report)
- RA17-069, Post Accident Monitoring Report + (Post Accident Monitoring Report)
- RA17-031, Post Accident Monitoring Report + (Post Accident Monitoring Report)
- L-16-149, Post Accident Monitoring Report + (Post Accident Monitoring Report)
- NL-13-0849, Post Accident Monitoring Report + (Post Accident Monitoring Report)
- NRC-12-0065, Post Accident Monitoring Report + (Post Accident Monitoring Report)
- L-22-149, Post Accident Monitoring Report + (Post Accident Monitoring Report)
- RA23-025, Post Accident Monitoring Report + (Post Accident Monitoring Report)
- ML23212A944 + (Post Accident Monitoring Report)
- RA-20-0363, Post Accident Monitoring Report 369-2020-01 + (Post Accident Monitoring Report 369-2020-01)
- L-15-386, Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time + (Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time)
- NRC-14-0061, Post Accident Monitoring Report Regarding Inoperable Instrumentation + (Post Accident Monitoring Report Regarding Inoperable Instrumentation)
- NL-17-1401, Post Accident Monitoring Report for 8 Train RVLIS + (Post Accident Monitoring Report for 8 Train RVLIS)
- NL-15-051, Post Accident Monitoring Report on Inoperable Condensate Storage Tank Level Transmitters + (Post Accident Monitoring Report on Inoperable Condensate Storage Tank Level Transmitters)
- NL-14-078, Post Accident Monitoring Report on Inoperable Condensate Storage Tank Level Transmitters + (Post Accident Monitoring Report on Inoperable Condensate Storage Tank Level Transmitters)
- ML20263Q610 + (Post Accident Sample Station Flow Diagram)
- ML20263Q607 + (Post Accident Sample Station Flow Diagram. Sheet 1 of 2)
- ML20265B201 + (Post Accident Sampling System)
- ML20265B196 + (Post Accident Sampling System)
- ML20266C472 + (Post Accident Sampling System Ap.Sheet A01)
- ML20260D196 + (Post Accident Sampling System Contmt Isol Valves Logic Diagram System:Ap. Actual Drawing NUMBER:5Z-54-9-Z-41925 1)
- ML20260D080 + (Post Accident Sampling System Contmt Isol Valves Logic Diagram System:Ap. Actual Drawing NUMBER:5Z-54-9-Z-41896 1)
- ML20260D072 + (Post Accident Sampling System Contmt Isol Valves Logic Diagram System:Ap. Actual Drawing NUMBER:5Z-54-9-Z-41894 1)
- ML20265D075 + (Post Accident Sampling System Contmt Isol Valves Logic Diagram System:Ap)
- ML20261L435 + (Post Accident Sampling System Contmt Isol Valves Logic Diagram System:Ap)
- ML20261L464 + (Post Accident Sampling System Contmt Isol Valves Logic Diagram System:Ap)
- ML20261L424 + (Post Accident Sampling System Contmt Isol Valves Logic Diagram System:Ap)
- ML17255A679 + (Post Accident Sampling System Piping & Instrumentation Diagram Liquid & Air Sampling System, as-built.Sheet 1 of 1)
- ML17255A680 + (Post Accident Sampling System:General Arrangement El 253 Ft 6 Inches, as-built.Sheet 1 of 1)
- ML20262K253 + (Post Accident Sampling and Analysis System (Pasas). Sheet 6)
- ENS 40165 + (Post Alert Emergency Declaration Based on Calculated Rcs Inventory Loss)
- IR 05000455/2025011 + (Post Approval License Renewal Phase 1 Inspection Report 05000455/2025011)
- ML18262A129 + (Post CoC Approval Containment)
- ML18262A130 + (Post CoC Approval Criticality)
- ML18262A131 + (Post CoC Approval Shielding)
- ML18262A132 + (Post CoC Approval Thermal)
- ML23283A112 + (Post Comment Resolution Draft - DANU-ISG-2022-09, Advanced Reactor Content of Application Project, Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications - Roadmap for Advisory Committee on Reactor Safeguards Review)