Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24075A286 + (Of Standard Review Plan Branch Technical Position 7-19, Guidance for Evaluation of Defense in Depth and Diversity to Address Common-Cause Failure Due to Latent Defects in Digital Safety Systems)
- ML060960555 + (Of Table 11a (Continued) Teen Inhalation Dose Factors)
- ML040780213 + (Of Technical Requirements Manual)
- ML21357A013 + (Of Teusa Imsr Postulated Initiating Events (Pie) White Paper and Terrestrial Energy Responses to the Second Round of Cnsc/Nrc Feedback)
- NL-05-2061, Of Unit 1 Cycle 13 Core Operating Limits Report + (Of Unit 1 Cycle 13 Core Operating Limits Report)
- NL-07-0012, Of Unit 1 Cycle 14 Core Operating Limits Report + (Of Unit 1 Cycle 14 Core Operating Limits Report)
- ML061450146 + (Of Vibration Acceptance Criteria for ERV Valve Actuators)
- ML20040G689 + (Of WPPSS-QA-004, Operational QA Program Description)
- ML20039C729 + (Of civil-structural Design Criteria for Recovery Facilities)
- ML19333B972 + (Of the Action Plan to Prepare the U.S. Nuclear Regulatory Commission for Review of Applicant Use of Advanced Manufacturing Technology)
- ML17355A532 + (Of the Charter for the Committee to Review Generic Requirements)
- ML17279A078 + (Of the Cycle 1 Core Operating Limits Report (COLR))
- ML12296A253 + (Of the Cycle 12 Core Operating Limits Report (COLR))
- ML14141A084 + (Of the Cycle 13 Core Operating Limits Report (COLR))
- ML18145A196 + (Of the Cycle 14 and 15 Core Operating Limits Report (COLR))
- ML18270A352 + (Of the Cycle 16 Core Operating Limits Report (COLR))
- ML091520361 + (Of the Digital Instrumentation and Control Project Plan)
- ML063390404 + (Of the Haddam Neck Plant License Termination Plan(Ltp), Dated November 2006)
- CY-13-047, Of the Haddam Neck Plant Post-Shutdown Decommissioning Activities Report + (Of the Haddam Neck Plant Post-Shutdown Decommissioning Activities Report)
- ML13357A205 + (Of the Maine Yankee Atomic Power Station Post-Shutdown Decommissioning Activities Report)
- WBL-20-058, Of the Unit 1 Cycle 17 Core Operating Limits Report (COLR) and Revision 0 of the Unit 2 Cycle 4 Core Operating Limits Report (COLR) + (Of the Unit 1 Cycle 17 Core Operating Limits Report (COLR) and Revision 0 of the Unit 2 Cycle 4 Core Operating Limits Report (COLR))
- WBL-21-052, Of the Unit 1 Cycle 18 Core Operating Limits Report (COLR) + (Of the Unit 1 Cycle 18 Core Operating Limits Report (COLR))
- WBL-25-027, Of the Unit 1 Cycle 20 Core Operating Limits Report (COLR) and Revision 0 of the Unit 2 Cycle 7 COLR + (Of the Unit 1 Cycle 20 Core Operating Limits Report (COLR) and Revision 0 of the Unit 2 Cycle 7 COLR)
- WBL-22-028, Of the Unit 2 Cycle 5 Core Operating Limits Report (COLR) + (Of the Unit 2 Cycle 5 Core Operating Limits Report (COLR))
- WBL-23-055, Of the Unit 2 Cycle 6 Core Operating Limits Report + (Of the Unit 2 Cycle 6 Core Operating Limits Report)
- WBL-25-030, Of the Unit 2 Cycle 7 Core Operating Limits Report (COLR) + (Of the Unit 2 Cycle 7 Core Operating Limits Report (COLR))
- ML17324B383 + (Of the Unit 2 Cycle Core Operating Limits Report (COLR))
- WBL-20-036, Of the Unit Cycle 2 Cycle 3 Core Operating Limits Report (COLR) + (Of the Unit Cycle 2 Cycle 3 Core Operating Limits Report (COLR))
- ML19343B202 + (Of, Farley Unit 2 Special Low-Power Tests Safety Evaluation)
- ML20154A441 + (Ofc Ltr 1003,establishing Policies & Procedures for Mgt of Allegations in NRR & Establishing NRR Allegation Review Board Responsible for Direction & Oversight of Allegation Mgt Process in NRR)
- ML19322C651 + (Ofc Ltr 2 Re SRPs for Safety Evaluations of Nuclear Plants.Implementation of SRP Should Add Stability to Licensing Process & Increase Confidence That NRC Requirements Are Commensurate W/Safety Values)
- ML19340D897 + (Ofc for Analysis & Evaluation of Operational Data Actions Re Crystal River 3 Loss of Nonnuclear Instrumentation & Integrated Control Sys Power on 800226)
- ML20041G508 + (Ofc for Analysis & Evaluation of Operational Data (AEOD) Program Plan for FY82 & 83)
- ML19340E677 + (Ofc of Analysis & Evaluation of Operational Data Observations & Recommendations Re Problem of Steam Generator Overfill & Combined Primary & Secondary Side Blowdown)
- ML20246F261 + (Ofc of Atty General Memo of Investigation Re Seabrook Low Power Testing Transient Event of June 1989)
- ML20138A608 + (Ofc of Civilian Radwaste Mgt Calender,Nov 1985)
- ML20132D093 + (Ofc of Enforcement Annual Rept,FY96)
- ML19296C993 + (Ofc of Executive Legal Director Legal Analysis of Authority to Permit Export of SNM Other than Under Terms of Agreement for Cooperation)
- ML19305A158 + (Ofc of Executive Legal Director,On Behalf of All Parties, Requests That ASLB Issue Agenda for Continuation of pre- Hearing Conference as Far in Advance as Possible)
- ML20149H910 + (Ofc of Ig,Nrc,Review of NRC Implementation of Federal Manager Finincial Integrity Act for 1994)
- ML20117E305 + (Ofc of Inspector & Auditor Case Summary Re Allegation That NRC Inspectors & Investigators Committed Possible Improprieties & Illegal Acts)
- ML20126M049 + (Ofc of Inspector & Auditor Review of OL Review Process for Power Reactors)
- ML20046A111 + (Ofc of Inspector General Insp Rept,Response to Whistleblower Retaliation Complaints,Case 92-01N)
- ML20056A105 + (Ofc of Inspector General Rept of Insp NRC Review of Pilgrim Offsite Emergency Preparedness)
- ML19354D798 + (Ofc of Inspector General Review of NRC SALP Program)
- ML20207J830 + (Ofc of Inspector General Semiannual Rept to Congress for 980401-980930. with Two Oversize Encl)
- ML20248D657 + (Ofc of Inverstigations Subpoena to Jj Macktal,Nrc Investigation 4-89-008.* Requests Leave of 5 Days to Respond to Request Filed for Enforcement of Subpoena & to Brief Commission on Issues Re Subpoena)
- ML20153G829 + (Ofc of Investigation Rept of Inquiry, Comanche Peak Steam Electric Station Alleged Falsification of Coatings QC Training Records, on 851125-26.No Falsification Noted But QC Supervisor Erred in Documenting Evaluation)
- ML20198B040 + (Ofc of Investigations FY97 Annual Rept)
- ML20028F196 + (Ofc of Investigations Rept 50-272/1-82-070 on 820809-0914. Area Investigated:Circumstances Surrounding Loss of 115-volt Control Power to Steam Generator 11 Feed Pump.Investigation Closed)
- ML20028F200 + (Ofc of Investigations Rept 50-272/1-82-079 on 820501-05.Area Investigated:Circumstances Surrounding 820501 Discovery of Inoperable Control Room wide-range Level Recorder for Steam Generator 13.Investigation Closed)