Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML003722065 + (Oconee,Emergency Plan Implementing Procedures Manual Volume C Revision 2000-05)
- ML050280352 + (Oconnor Ltr Request for Extension of Time to Reply to November 5, 2004 Order Imposing Requirements for Protecting Certain Safeguards Information)
- ML20034C249 + (Ocre Filing of Contention & Response to Licensee & NRC Staff Answers to Ocre Petition for Leave to Intervene.* Ocre Has Met Standing Requirements & Should Be Admitted as Party to Proceeding.Certificate of Svc Encl)
- ML20043D675 + (Ocre Response to Licensee & NRC Staff Answers to Ocre Contention.* Ocre Contention Should Be Granted Since NRC Has No Valid Argument to Preclude Admission of Contention & 10CFR2.714(b)(2) Requirements Met.W/Certificate of Svc)
- ML24285A150 + (Oct 10 2024 Letter to K Wendtland Re Wyoming Final Impep Report)
- ML17256A129 + (Oct 11, 2017, NEI 96-07, App D Meeting Agenda)
- ML24281A134 + (Oct 11, 2024 Letter to G Forsee Re Illinois Final Revisions to Rats Ids 2021-1, 2021-2, 2022-1, and 2022-2)
- ML22298A242 + (Oct 13 2022 Press Release TRISO-X Breaks Ground on North Americas First Commercial Advanced Nuclear Fuel Facility)
- ML24262A206 + (Oct 15 2024 Letter to I Schneider California Proposed Lbr I 37 and M 2 and M 7 and Glr 4 and Gld 3 and Sections 30100 30192 1 and 30275)
- ML24290A109 + (Oct 17 2024 Letter to J. Grice Re Colorado Periodic Meeting Scheduling Letter and Agenda)
- ML24284A278 + (Oct 17 2024 Memorandum to J. Bielecki T. Bloomer and J. Marshall Re Review of the Draft Wyoming Agreement Package)
- ML20147B024 + (Oct 1978 Monthly Highlights,Div of Reactor Safety Res-ORNL Progs. Interim Rept Provides Highlights of Tech Progress for 15 Prog Activities)
- ML20148P656 + (Oct 1978 Monthly Rept Ltr Appl of Crack Arrest Theory to a Thermal Shock Exper, Fast Fracture Toughness & Crack Arrest Toughness of Reactor Pressure Vessel Steel, & a Cooperative Prog for Eval Crack-Arrest Test Methods)
- ML20204C658 + (Oct 1978 Monthly Rept Ltr Pwr Steam Generator Tube Integrity Prog. Activities Weburst & Collapse Test, Fatigue Test,Chem Defects,Nondestructive Test)
- ML20062C727 + (Oct 1978 Progress Rept for Hlp.During Oct,Hlp Received Answers to Interrogs Submitted to DOJ & Served Interrogs & Requests for Production Upon NRC Staff.Cert of Svc Encl)
- ML20115A664 + (Oct 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project. Related Documentation Encl)
- ML20115A672 + (Oct 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project)
- ML20039G976 + (Oct 1981 Loft Progress Rept to Foreign Participants)
- ML20199G299 + (Oct 1997 Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1)
- IR 05000302/2007301 + (Oct 2007 Exam Summary Sheet Letter, IR 05000302-07-301)
- ML073460565 + (Oct 2007-301 Exam Approval Letter)
- ML24241A242 + (Oct 2015 Emails Re Pilgrim Drone Spotting)
- ML22278A183 + (Oct 2022 Program Code Descriptions and Inspection Priorities)
- ML24291A252 + (Oct 22 2024 Letter to B Goretzki Re Arizona Final Revisions to Rats Id 2013 2 2015 1 2015 3 2018 1 2018 3 and 2023 1)
- ML063460416 + (Oct 24, 2006 Regulatory Conference Draft Slides)
- ML19297F973 + (Oct 24, 2019 TR Transformation Workshop Attendees)
- ML19275G968 + (Oct 24, 2019 Topical Report Transformation Workshop)
- EPID:L-2019-TOP-0042 + (Oct 24, 2019 Topical Report Transformation Workshop)
- ML18298A172 + (Oct 25, 2018 NEI Operability Determination Meeting Attendees)
- ML18299A002 + (Oct 25, 2018 NEI Operability Determination Meeting Stakeholder Comment)
- ML18204A032 + (Oct 25, 2018 NRC Staff Feedback on Entry Criteria Meeting)
- ML24302A201 + (Oct 28 2024 Letter to B Goretzki Re Arizona Impep Scheduling Letter and Questionnaire)
- ML24068A250 + (Oct 29 2024 Letter to D Shearer Re Pennsylvania Final Regulations to Rats Ids 2018-1 Through 2023-1)
- ML050750457 + (Oct. 2004-301 Exam 50-413 & 50-414/2004-301 Final Revision 1 RO Written Exam)
- ML050750463 + (Oct. 2004-301 Exam 50-413 & 50-414/2004-301 Final Revision 1 SRO Written Exam)
- ML062930215 + (Oct. 2006 Exam - Draft - Outlines (Folder 2))
- ML062930254 + (Oct. 2006 Exam - Draft - RO & SRO Written Exam (Folder 2))
- ML062930280 + (Oct. 2006 Exam - Draft - Section B Operating Exam (Folder 2))
- ML062930297 + (Oct. 2006 Exam - Draft - Section C Operating Exam (Folder 2))
- ML062930268 + (Oct. 2006 Exam - Draft - Section a Operating Exam (Folder 2))
- ML063060323 + (Oct. 2006 Exam - Draft RO & SRO Written (Folder2))
- ML063070441 + (Oct. 2006 Exam - Final Section a Operating Exam (Folder 3))
- ML063070146 + (Oct. 2006 Exam - Handouts to Applicants (Folder 3))
- ML070300461 + (Oct. 2006 Exam Final Qa/Related Forms (Folder 1))
- ML063210194 + (Oct. 2006 Exam Results Letter W/O Enclosures (Folder 1))
- IR 05000325/2004301 + (Oct/Nov 2004-301 Exam 50-325, 324/2004-301 Draft Simulator JPMs)
- ML051120086 + (Oct/Nov 2004-301 Exam 50-325, 50-324/2004-301 Administrative Documents)
- ML051120018 + (Oct/Nov 2004-301 Exam 50-325, 50-324/2004-301 Draft Admin JPMs)
- ML051120017 + (Oct/Nov 2004-301 Exam 50-325, 50-324/2004-301 Draft In-Plant JPMs)
- ML051120019 + (Oct/Nov 2004-301 Exam 50-325, 50-324/2004-301 Draft Outlines)
- ML051120041 + (Oct/Nov 2004-301 Exam 50-325, 50-324/2004-301 Draft RO Written Exam)
- ML051120031 + (Oct/Nov 2004-301 Exam 50-325, 50-324/2004-301 Draft SRO Written Exam)