Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NG-14-0063, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation + (Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation)
- GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation + (Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation)
- PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067) + (Notification of Completion of Emergence from Bankruptcy (PLA-8067))
- ML13312A921 + (Notification of Completion of Firearms Background Checks in Accordance with NRC Order EA-13-092)
- ML13280A271 + (Notification of Completion of Firearms Background Checks in Accordance with NRC Order EA-13-092)
- ML13260A257 + (Notification of Completion of Firearms Background Checks in Accordance with NRC Order EA- 13-092)
- ML19206B316 + (Notification of Completion of First Round Review of Fsar. Forwards Request for Addl Info)
- ND-22-0225, Notification of Completion of ITAAC 2.2.03.08c.x (Index Number 195) + (Notification of Completion of ITAAC 2.2.03.08c.x (Index Number 195))
- ND-23-0418, Notification of Completion of ITAAC 2.2.03.08c.x (Index Number 195) + (Notification of Completion of ITAAC 2.2.03.08c.x (Index Number 195))
- TXX-2957, Notification of Completion of Investigation on Installation of Pipe Elbows Connecting Steam Generators to cross-over Leg Piping.Concludes Matter Not Reportable Under 10CFR50.55(e). Supporting Records Available at Site for Inspector Review + (Notification of Completion of Investigation on Installation of Pipe Elbows Connecting Steam Generators to cross-over Leg Piping.Concludes Matter Not Reportable Under 10CFR50.55(e). Supporting Records Available at Site for Inspector Review)
- TXX-2952, Notification of Completion of Investigation on Expansion Joint in Decontamination Room.Concludes Matter Is Not Reportable Under 10CFR50.55(e).Supporting Records Available on Site for Inspector Review + (Notification of Completion of Investigation on Expansion Joint in Decontamination Room.Concludes Matter Is Not Reportable Under 10CFR50.55(e).Supporting Records Available on Site for Inspector Review)
- L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55 + (Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55)
- L-16-330, Notification of Completion of License Renewal Commitments + (Notification of Completion of License Renewal Commitments)
- RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC + (Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC)
- ML032170049 + (Notification of Completion of Procedures for Implementing ASME Code Case OMN-1)
- ML19221A121 + (Notification of Completion of RELAP-4 TMI Simulations)
- ST-HL-AE-4827, Notification of Completion of Requirements of GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance + (Notification of Completion of Requirements of GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance)
- ML19282B554 + (Notification of Completion of Review of Tech Specs Surveillance Requirements & Preoperational Testing Associated W/Reactor Startup.Advises That Certain Surveillance Stds Will Be Due Before Refueling Date)
- ML19220B340 + (Notification of Completion of Review of Sections 3.6,3.9, 3.1.,4.2 & 5.5 of FSAR Through Amend 32)
- ML12276A375 + (Notification of Completion of Review of Updated Hydrologic Analysis Results for Impact on Watts Bar Nuclear Plant (WBN) Units 1 and 2 Final Environmental Statements)
- ML13080A076 + (Notification of Completion of Revision to the Emergency Response Data System)
- L-02-090, Notification of Completion of Security Compensatory Measures for Beaver Valley Power Station, Unit No. 1 & No. 2 + (Notification of Completion of Security Compensatory Measures for Beaver Valley Power Station, Unit No. 1 & No. 2)
- ML14092A090 + (Notification of Completion of Transfer of Nuclear Units to Exelon Generation Company, LLC)
- L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45) + (Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45))
- AEP-NRC-2012-18, Notification of Compliance to NRC Security Order EA-11-039 + (Notification of Compliance to NRC Security Order EA-11-039)
- RC-15-0195, Notification of Compliance to NRC Security Order EA-13-228 + (Notification of Compliance to NRC Security Order EA-13-228)
- ML16014A754 + (Notification of Compliance with NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- ML17031A431 + (Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and FLEX Final Integrated Plan)
- ONS-2016-063, Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events + (Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
- ML16028A194 + (Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
- ONS-2016-003, Notification of Compliance with Order EA-12-051, Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation + (Notification of Compliance with Order EA-12-051, Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
- ML040650455 + (Notification of Compliance with Order for Compensatory Measures Related to Access Authorization (EA-02-261))
- ML040370765 + (Notification of Compliance with Order for Compensatory Measures Related to Access Authorization (EA-02-261))
- ML033290551 + (Notification of Compliance with Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel (EA-03-038))
- NOC-AE-15003257, Notification of Compliance with Orders EA-12-049 for Mitigation Strategies for Beyond-Design-Basis External Events and EA-12-051 for Reliable Spent Fuel Pool Instrumentation + (Notification of Compliance with Orders EA-12-049 for Mitigation Strategies for Beyond-Design-Basis External Events and EA-12-051 for Reliable Spent Fuel Pool Instrumentation)
- ML15196A031 + (Notification of Compliance with Orders EA-12-049 for Mitigation Strategies for Beyond-Design-Basis External Events and EA-12-051 for Reliable Spent Fuel Pool Instrumentation)
- ML040210323 + (Notification of Compliance with the Order for Compensatory Measures Related to Access Authorization)
- ML23300A073 + (Notification of Comprehensive Engineering Team Inspection (05000298 2024010) and Request for Information)
- ML23019A080 + (Notification of Comprehensive Engineering Team Inspection (05000483/2023011) and Request for Information)
- ML25246C403 + (Notification of Comprehensive Engineering Team Inspection 05000528/2026011, 05000529/2026011, 05000530/2026011 - Request for Information)
- ML25024A026 + (Notification of Comprehensive Engineering Team Inspection (05000416/2025010) and Request for Information)
- ML23191A456 + (Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information)
- ML24107A028 + (Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information)
- ML19242A668 + (Notification of Condensate Storage Tank Leak.Caused by Weld Failures & Plate Buckling Due to Upward Movement of Drain Pipe.Rept Will Be Submitted by 790818)
- ML15084A343 + (Notification of Conduct Triennial Fire Protection Baseline Inspection)
- ML25213A032 + (Notification of Conduct of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. Inspection)
- ML19347A810 + (Notification of Conduct of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, Inspection)
- ML22304A048 + (Notification of Conduct of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, Inspection)
- ML22314A087 + (Notification of Conduct of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, Inspection)
- ML101060442 + (Notification of Conduct of Triennial Fire Protection Baseline Inspection While Transition to 10 CFR Part 50.48(c) Is in Progress (IR 05000395-10-008))
- ML12314A200 + (Notification of Conduct of Triennial Fire Protection Baseline Inspection (NRC Inspection Report No. 05000369 and 370/2013007))