Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNP 2013-074, Notification of Commitment Changes + (Notification of Commitment Changes)
- ML16127A607 + (Notification of Commitment Completion - NTTF Recommendation 9.3)
- NL-16-0026, Notification of Commitment Completion - NTTF Recommendation 9.3 + (Notification of Commitment Completion - NTTF Recommendation 9.3)
- ML20042A268 + (Notification of Committee to Review Generic Requirements 820324 Meeting to Discuss Proposed Reg Guide Sc 708-4 Re safety-related Snubber Qualification & Acceptable Tests & TMI Item II.F.2 Re Inadequate Core Cooling Detection)
- ML20040C166 + (Notification of Committee to Review Generic Requirements 820127 Meeting in Bethesda,Md to Discuss & Develop Recommendations.Agenda Listed)
- ML20040D991 + (Notification of Committee to Review Generic Requirements Meeting 7 on 820203.Agenda Detailed)
- ML20140D605 + (Notification of Committee to Review Generic Requirements Meeting Number 306 on 970612.Agenda Submitted)
- ML20051P044 + (Notification of Committee to Review Generic Requirements 820520 Meeting in Bethesda,Md Re Burden of NRC Reporting & Recordkeeping Requirements & Proposed Revision to Reg Guide 1.145)
- SBK-L-08103, Notification of Completed Actions and Commitments Addressed in Confirmatory Action Letter in Regard to Alloy 82/182 Butt Welds in the Pressurizer + (Notification of Completed Actions and Commitments Addressed in Confirmatory Action Letter in Regard to Alloy 82/182 Butt Welds in the Pressurizer)
- ML081490582 + (Notification of Completion Regarding Actions and Commitments for Nuclear Regulatory Commission (NRC) Confirmatory Action Letter)
- ML042540393 + (Notification of Completion of Actions General Atomics Plan for Complying with Compensatory Measures for Confirmatory Action Letter Process)
- ML042660060 + (Notification of Completion of Actions General Atomics Plan for Complying with Compensatory Measures for Confirmatory Action Letter Process)
- L-PI-13-078, Notification of Completion of Activities to Support Entry Into the Period of Extended Operation + (Notification of Completion of Activities to Support Entry Into the Period of Extended Operation)
- ND-22-0493, Notification of Completion of All ITAAC + (Notification of Completion of All ITAAC)
- ND-23-0609, Notification of Completion of All ITAAC + (Notification of Completion of All ITAAC)
- ML090720894 + (Notification of Completion of Commitments Required Prior to Entry Into Period of Extended Operation (Peo), Associated with License Renewal)
- ML103570042 + (Notification of Completion of Commitments Required Prior to Entry Into Period of Extended Operation, Associated with License Renewal)
- SVPLTR 09-0064, Notification of Completion of Commitments Required Prior to Entry Into Period of Extended Operation, Associated with License Renewal + (Notification of Completion of Commitments Required Prior to Entry Into Period of Extended Operation, Associated with License Renewal)
- SVP-12-091, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation + (Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation)
- NG-14-0063, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation + (Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation)
- GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation + (Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation)
- PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067) + (Notification of Completion of Emergence from Bankruptcy (PLA-8067))
- ML13312A921 + (Notification of Completion of Firearms Background Checks in Accordance with NRC Order EA-13-092)
- ML13280A271 + (Notification of Completion of Firearms Background Checks in Accordance with NRC Order EA-13-092)
- ML13260A257 + (Notification of Completion of Firearms Background Checks in Accordance with NRC Order EA- 13-092)
- ML19206B316 + (Notification of Completion of First Round Review of Fsar. Forwards Request for Addl Info)
- ND-22-0225, Notification of Completion of ITAAC 2.2.03.08c.x (Index Number 195) + (Notification of Completion of ITAAC 2.2.03.08c.x (Index Number 195))
- ND-23-0418, Notification of Completion of ITAAC 2.2.03.08c.x (Index Number 195) + (Notification of Completion of ITAAC 2.2.03.08c.x (Index Number 195))
- TXX-2957, Notification of Completion of Investigation on Installation of Pipe Elbows Connecting Steam Generators to cross-over Leg Piping.Concludes Matter Not Reportable Under 10CFR50.55(e). Supporting Records Available at Site for Inspector Review + (Notification of Completion of Investigation on Installation of Pipe Elbows Connecting Steam Generators to cross-over Leg Piping.Concludes Matter Not Reportable Under 10CFR50.55(e). Supporting Records Available at Site for Inspector Review)
- TXX-2952, Notification of Completion of Investigation on Expansion Joint in Decontamination Room.Concludes Matter Is Not Reportable Under 10CFR50.55(e).Supporting Records Available on Site for Inspector Review + (Notification of Completion of Investigation on Expansion Joint in Decontamination Room.Concludes Matter Is Not Reportable Under 10CFR50.55(e).Supporting Records Available on Site for Inspector Review)
- L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55 + (Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55)
- L-16-330, Notification of Completion of License Renewal Commitments + (Notification of Completion of License Renewal Commitments)
- RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC + (Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC)
- ML032170049 + (Notification of Completion of Procedures for Implementing ASME Code Case OMN-1)
- ML19221A121 + (Notification of Completion of RELAP-4 TMI Simulations)
- ST-HL-AE-4827, Notification of Completion of Requirements of GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance + (Notification of Completion of Requirements of GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance)
- ML19282B554 + (Notification of Completion of Review of Tech Specs Surveillance Requirements & Preoperational Testing Associated W/Reactor Startup.Advises That Certain Surveillance Stds Will Be Due Before Refueling Date)
- ML19220B340 + (Notification of Completion of Review of Sections 3.6,3.9, 3.1.,4.2 & 5.5 of FSAR Through Amend 32)
- ML12276A375 + (Notification of Completion of Review of Updated Hydrologic Analysis Results for Impact on Watts Bar Nuclear Plant (WBN) Units 1 and 2 Final Environmental Statements)
- ML13080A076 + (Notification of Completion of Revision to the Emergency Response Data System)
- L-02-090, Notification of Completion of Security Compensatory Measures for Beaver Valley Power Station, Unit No. 1 & No. 2 + (Notification of Completion of Security Compensatory Measures for Beaver Valley Power Station, Unit No. 1 & No. 2)
- ML14092A090 + (Notification of Completion of Transfer of Nuclear Units to Exelon Generation Company, LLC)
- L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45) + (Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45))
- AEP-NRC-2012-18, Notification of Compliance to NRC Security Order EA-11-039 + (Notification of Compliance to NRC Security Order EA-11-039)
- RC-15-0195, Notification of Compliance to NRC Security Order EA-13-228 + (Notification of Compliance to NRC Security Order EA-13-228)
- ML16014A754 + (Notification of Compliance with NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- ML17031A431 + (Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and FLEX Final Integrated Plan)
- ONS-2016-063, Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events + (Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
- ML16028A194 + (Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
- ONS-2016-003, Notification of Compliance with Order EA-12-051, Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation + (Notification of Compliance with Order EA-12-051, Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
- ML040650455 + (Notification of Compliance with Order for Compensatory Measures Related to Access Authorization (EA-02-261))
- ML040370765 + (Notification of Compliance with Order for Compensatory Measures Related to Access Authorization (EA-02-261))