Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151K677 + (Ninth Final Response to FOIA Request for Documents.Documents Listed in App O Being Withheld in Entirety (Ref FOIA Exemption 5))
- ML20081D959 + (Ninth Interim Deficiency Rept Re B&W Nonconservative Analysis of Neutron Flux.Initially Reported on 801105.B&W Evaluation Awaited.Next Rept Will Be Submitted by 840110)
- ML20081D580 + (Ninth Interim Deficiency Rept Re Corrosion of Carbon Steel Piping in Raw Water Sys.Initially Reported on 801230.All design-related Activities Re Cement Mortar Lining of Yard Piping Completed.Next Rept Will Be Submitted by 840613)
- ML20072N031 + (Ninth Interim Deficiency Rept Re Failure of Main Steam Lines Because of Main Feedwater Overfill.Initially Reported on 800319.Final Analyses of Main Steam Line Integrity Continuing.Also Reported Per 10CFR21.Next Rept Due 830715)
- ML20023C376 + (Ninth Interim Deficiency Rept Re Improper Thrust Forces Used in High Energy Line Break Analysis Pipe Whip Restraint Design.Initially Reported on 800919.Design Drawings for 83 Restraints Revised.Next Rept Will Be Submitted by 840220)
- ML20086G573 + (Ninth Interim Deficiency Rept Re Inconsistencies in Pipe Break LOCA Analysis.Initially Reported on 801121.Review of B&W Alternate Approaches to Resolve Problem in Progress.Also Reported Per Part 21.Next Rept by 840630)
- ML20084H698 + (Ninth Interim Deficiency Rept Re Potential Design Deficiency in Valve Yoke to Motor Mount Weld.Initially Reported on 740514.Util Is Replacing 12-inch Globe Valve in Test Return Line W/Larger Globe Valve & Orifice Plate Combination)
- ML20053B814 + (Ninth Interim Deficiency Rept Re QA Breakdown - Deficient Fillet Welds,Originally Reported on 800507.Nonconformance Repts 1188,1203 & 1563 Weld Evaluations Continuing.Next Rept Due by 821116)
- ML20076K754 + (Ninth Interim Deficiency Rept Re Seismic Qualification of B&W Equipment in Free Standing,Open & Local Instrument Panels.Initially Reported on 801124.Util Awaiting Proposal from B&W for Upgrading Equipment)
- ML20052G314 + (Ninth Interim Deficiency Rept Re Welding of Structural Steel Annulus Floor Framing,Initially Reported on 800415.All Welds Reinspected.Results Are Being Reviewed.Next Rept by 820609)
- ML20030C256 + (Ninth Interim Rept Re Expansion Anchors Not Passing Qualification Tests,Initially Reported on 780710.Field Survey Is Scheduled to Gather Data to Evaluate as-built Strength of Base Plates.Next Rept Expected by 810318)
- ML20080A993 + (Ninth Interim Significant Const Deficiency Rept 37, Temp Detector (RTD) Failures. Interim or Final Status Rept Will Be Provided by 840330)
- ML20084H850 + (Ninth Interim Significant Const Deficiency Rept 78 Re American Bridge Structural Steel.Initially Reported on 840409.Engineering Analysis Scheduled to Be Completed on 840504.Final Rept Will Be Submitted on 840515)
- ML20094A556 + (Ninth Interim Significant Const Deficiency 60 Rept Re Turnover Documentation & Inadequate Hanger Weld Problems Addl Walkdowns,Engineering Evaluations & Minor Rework Scheduled for Completion by Aug 1984.Next Rept by 840810)
- ML042030269 + (Ninth Interim and Final Application of FTI Consulting Inc. for Allowance and Payment of Compensation and Reimbursement of Expenses (April 11, 2001 Through April 12, 2004); Declaration of Thomas E. Lumsden in Support Thereof)
- ML20064N371 + (Ninth Motion for Summary Disposition of New England Coalition on Nuclear Pollution Contention I.B.1.Facility RHR Relies on Sys Which Are safety-grade & Environmentally Qualified.Certificate of Svc Encl.Related Correspondence)
- ML20205P059 + (Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely)
- ML20134M940 + (Ninth Partial Response to FOIA Request for Documents.Records in App Q Being Withheld in Entirety (Ref FOIA Exemption 5))
- ML20148H235 + (Ninth Partial Response to FOIA Request for Documents Re Sser 26,NUREG-0675.Forwards App R Documents.App U & App R Documents Available in Pdr.App & T Documents Partially & Totally Withheld (Ref FOIA Exemptions 6 & 7))
- ML20236L676 + (Ninth Partial Response to FOIA Request for Records,Including Notes of Interview of K Mcmahon.Forwards App K Documents. App K & L Documents Partially & Completely Withheld (Ref FOIA Exemptions 6 & 7,respectively))
- ML20196B022 + (Ninth Partial Response to FOIA Request for Documents. Documents Listed in App P & Q Being Released in Their Entirety.App Q Documents Copyrighted in Nature)
- ML20134Q098 + (Ninth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App P.App Q Documents Partially Withheld (Ref FOIA Exemption 6).Documents Also Available in PDR)
- ML20134B794 + (Ninth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App P.App Q Documents Partially Withheld (Ref FOIA Exemption 6).Documents Also Available in PDR)
- ML20148H240 + (Ninth Partial Response to FOIA Request for Documents Re Sser 26,NUREG-0675.Forwards App R Documents.App U & App R Documents Available in Pdr.App s & T Documents Partially & Totally Withheld (Ref FOIA Exemptions 6 & 7))
- ML20132C532 + (Ninth Partial Response to Rorem 850702 First Set of QA Interrogatories & Requests to Produce.Certificate of Svc Encl.Related Correspondence)
- CNL-15-116, Ninth Progress Update on Improved Flood Mitigation System Project + (Ninth Progress Update on Improved Flood Mitigation System Project)
- ML20045C711 + (Ninth Quarterly Plant Operation Rept May 1,1971 Thru July 31,1971 Southwest Experimental Fast Oxide Reactor. Related Info Encl)
- ML20235U875 + (Ninth Quarterly Rept of Seismic Monitoring Network Oct-Dec 1988)
- BW020044, Ninth Refuel Outage Steam Generator Inservice Inspection Report + (Ninth Refuel Outage Steam Generator Inservice Inspection Report)
- ML20078P307 + (Ninth Refueling Outage ISI Summary Rept)
- L-02-062, Ninth Refueling Outage Inservice Inspection Report + (Ninth Refueling Outage Inservice Inspection Report)
- ML032200254 + (Ninth Refueling Outage Steam Generation Tube Inspection Report, Additional Information Pertaining to Steam Generator Secondary Side Inspections)
- BW030030, Ninth Refueling Outage Steam Generator Tube Inspection Report + (Ninth Refueling Outage Steam Generator Tube Inspection Report)
- ML20202H566 + (Ninth Semiannual Staff Evaluation of Status of Nprds)
- ML20073B808 + (Ninth Set of Interrogatories)
- ML20084A170 + (Ninth Set of Interrogatories to Case & Request to Produce on Reopened Issues in Proceeding.Certificate of Svc Encl)
- ML20083M217 + (Ninth Set of Interrogatories to Case & Requests to Produce. Certificate of Svc Encl.Related Correspondence)
- ML20070T171 + (Ninth Set of Interrogatories.Certificate of Svc Encl.Related Correspondence)
- ML20070T259 + (Ninth Set of Interrogatories.Certificate of Svc Encl. Related Correspondence)
- ML17237A055 + (Ninth Six-Month Status Report in Response to March 12, 2012 Commission Oder Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- CNL-17-107, Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049) + (Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049))
- L-MT-18-079, Ninth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions . + (Ninth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions .)
- RS-17-094, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) + (Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049))
- RS-17-096, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) + (Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049))
- RS-17-097, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) + (Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049))
- RS-17-095, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-029) + (Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-029))
- ND-18-0154, Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) + (Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049))
- ML19305B426 + (Ninth Status Rept Per Aslab 790607 Grant for Indefinite Extension of Time,For NRC to Respond to Suffolk County Motion to File Supplemental Brief.Nrc Task Action Plan Being Prepared.Certificate of Svc Encl)
- ML12237A332 + (Ninth Update to Mandatory Disclosures Pursuant to 10 C.F.R. Section 2.3.36 for License Renewal for Davis-Besse Nuclear Power Station)
- ML20071J187 + (Ninth Water Reactor Safety Research Information Meeting)
- ML20052A022 + (Ninth Water Reactor Safety Research Information Meeting)