Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "NRR E-mail Capture - RAI Alternative RV-09, MSSVs". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19207A003  + (NRR E-mail Capture - R. E. Ginna Nuclear Power Plant: Acceptance Review: Relief Request Associated with Inservice Program for the Sixth Ten-Year Interval - I6R-02)
  • ML19207A004  + (NRR E-mail Capture - R. E. Ginna Nuclear Power Plant: Acceptance Review: Relief Request Associated with Inservice Program for the Sixth Ten-Year Interval - I6R-01)
  • ML14086A685  + (NRR E-mail Capture - R.E. Ginna N.P.P. / LAR on Containment Air Avg. Temperature)
  • ML14210A161  + (NRR E-mail Capture - RAI - Defueld Technical Specification Amendment)
  • ML19220A036  + (NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Adoption of NFPA 805, Request for Additional Information, EPID L-2018-LLA-0107)
  • ML19224C055  + (NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Degraded Voltage (L-2019-LLA-0108))
  • ML14210A159  + (NRR E-mail Capture - RAI - Eliminate Certain ESF Eequirements During Fuel Movement)
  • ML21111A303  + (NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068))
  • ML21110A684  + (NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068))
  • ML22208A133  + (NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR)
  • ML22157A354  + (NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR)
  • ML22355A208  + (NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR)
  • ML23075A023  + (NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162)
  • ML18068A659  + (NRR E-mail Capture - RAI - Oyster Creek Exemption Request - 10 CFR 50.47 and 10 CFR Part 50, Appendix E (EPID No.: L-2017-LLE0020))
  • ML18310A021  + (NRR E-mail Capture - RAI - Pilgrim EP Exemption)
  • ML19036A651  + (NRR E-mail Capture - RAI - Pilgrim EP Exemption)
  • ML18124A139  + (NRR E-mail Capture - RAI - Pilgrim ERO Staffing License Amendment Request)
  • ML19154A524  + (NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR))
  • ML15061A158  + (NRR E-mail Capture - RAI - Point Beach, Units 1 and 2 - LAR for TS Change Regarding risk-informed Justifications for the Relocation of Specific Surveillance Frequency Reguirements to a Licensee Controlled Program - MF4379/80)
  • ML13280A058  + (NRR E-mail Capture - RAI - Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) for Surry Power Station Units 1 and 2)
  • ML20063L456  + (NRR E-mail Capture - RAI - Robinson Relief Req Rx Vessel Cold Leg Nozzle Dissimilar Meter Butt Weld Inspection Interval EPID L-2019-LLR-0072)
  • ML19015A419  + (NRR E-mail Capture - RAI - Sequoyah Nuclear Plant, Units 1 and 2, LAR to Adopt 10 CFR50.69 Risk-informed SSC)
  • ML19263A643  + (NRR E-mail Capture - RAI - Vogtle End State License Amendment Request (LAR) to Revise the Technical Specifications (Tss) for Vogtle, Units 1 and 2 (L-2019-LLA-0148))
  • ML21033B107  + (NRR E-mail Capture - RAI - Vogtle Unit 1 - SG Report (L-2020-LRO-0059))
  • ML14168A613  + (NRR E-mail Capture - RAI 1 for CSST LAR)
  • ML22164A858  + (NRR E-mail Capture - RAI Alternative RV-09, MSSVs)
  • ML22182A199  + (NRR E-mail Capture - RAI Alternative RV-11, Code Case OMN-28)
  • ML17286A575  + (NRR E-mail Capture - RAI Associated with Columbia Generating Stations Amendment Request Revise Tech Specs 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies (CAC MF9469) EPID: L-2017-LLA-0197, ILRT, LLRT LAR)
  • ML17341B027  + (NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da)
  • ML15218A632  + (NRR E-mail Capture - RAI Clarification Call SG Weld RR MF6474)
  • ML17038A229  + (NRR E-mail Capture - RAI Formal Release for Callaway SG Tube Inspection Report, MF8474)
  • ML20034E608  + (NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020)
  • ML16189A268  + (NRR E-mail Capture - RAI Issuance for MF7358 Relief Request Reactor Pressure Vessel Flange Leak-off Code Case N-805)
  • ML23153A156  + (NRR E-mail Capture - RAI LaSalle pressure-temperature Limits Report (PTLR) Amendment Request)
  • ML22175A160  + (NRR E-mail Capture - RAI Monticello Fuel Oil Storage Tank Inspection)
  • ML12194A175  + (NRR E-mail Capture - RAI North Anna Power Station Units 1 and 2 -License Amendment Request to Eliminate the Steam Generator Water)
  • ML12292A043  + (NRR E-mail Capture - RAI North Anna Units 1 and 2 - 30-Day Report Regarding Thermal Conductivity Degradation in the Westinghouse Furnished Realistic Emergency Core Cooling Evaluation)
  • ML22164A856  + (NRR E-mail Capture - RAI Quad Cities Alternative RV-08, Safety Relief Valves)
  • ML22164A785  + (NRR E-mail Capture - RAI Quad Cities Amendment for Spent Fuel Pool Storage Analysis)
  • ML22193A041  + (NRR E-mail Capture - RAI Quad Cities License Amendment to Expand the Use of Prime Methods)
  • ML12128A078  + (NRR E-mail Capture - RAI Question as Updated.Docx)
  • ML23150A248  + (NRR E-mail Capture - RAI Re LaSalle Downcomer Analysis Amendment Request)
  • ML15030A005  + (NRR E-mail Capture - RAI Regarding Pressure and Temperature Limits Reports (Ptlrs), Byron Station, Units 1 and 2)
  • ML15030A007  + (NRR E-mail Capture - RAI Regarding Pressure and Temperature Limits Reports (Ptlrs), Braidwood Station, Units 1 and 2)
  • ML14084A138  + (NRR E-mail Capture - RAI Regarding Recommendation 2.1 Flood Hazard Reevaluation Extension Request)
  • ML14083A683  + (NRR E-mail Capture - RAI Regarding Recommendation 2.1 Flood Hazard Reevaluation Extension Request)
  • ML11276A188  + (NRR E-mail Capture - RAI Regarding TAC No. ME5409 (Harris-M5 Cladding))
  • ML11250A182  + (NRR E-mail Capture - RAI Regarding TAC No. ME5409 (Harris-M5 Cladding))
  • ML13333A532  + (NRR E-mail Capture - RAI Regarding W 3 Relief Request W3-ISI-022)
  • ML14114A475  + (NRR E-mail Capture - RAI Regarding the Proposed Changes to TS 3.4.9 for Browns Ferry Unit 1 (MF3260))
  • ML18277A237  + (NRR E-mail Capture - RAI Related to Perry Request for Alternative PR-2)