Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Kairos Power LLC, Submittal of Safeguards Information Protection Plan". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML24155A062  + (Kairos Power LLC, Presentation Slides for the June 5, 2024 Kairos Power Meeting to Discuss Hermes Foundation Design)
  • ML24046A145  + (Kairos Power LLC, Presentation Slides on Hermes Criticality Safety Analysis Methodology (Non-Proprietary))
  • ML24046A146  + (Kairos Power LLC, Presentation Slides on the KP-FHR Core Design Methodology Topical Report (Non-Proprietary))
  • ML21350A349  + (Kairos Power LLC, Quality Assurance Program for the Fluoride Salt-Cooled High Temperature Reactor Topical Report, KP-TR-007-NP-A)
  • ML21105A518  + (Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2))
  • ML21105A519  + (Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2)
  • ML21117A047  + (Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3))
  • ML22152A268  + (Kairos Power LLC, Question Related to ASME Code Section III for the General Audit for Hermes CP Application)
  • ML22018A160  + (Kairos Power LLC, Regulatory Analysis for the Fluoride Salt-Cooled High Temperature Reactor Topical Report, Revision 4)
  • ML20345A356  + (Kairos Power LLC, Regulatory Engagement Plan, Revision 1)
  • ML22231B230  + (Kairos Power LLC, Reponses to NRC Requests for Confirmation of Information Hermes Preliminary Safety Analysis Report, Section 9.1)
  • ML23304A311  + (Kairos Power LLC, Request for Additional Security Guidance References)
  • ML23300A143  + (Kairos Power LLC, Response to Hermes 2 General Audit Question 1.5-1)
  • ML22040A338  + (Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application)
  • ML22040A141  + (Kairos Power LLC, Response to NRC Questions 2.4-1, 2.4-2, and 2.4-3 for PSAR Section 2.4 on Hermes Construction Permit Application)
  • ML23271A184  + (Kairos Power LLC, Responses to Commissions Pre-Hearing Questions)
  • ML24156A163  + (Kairos Power LLC, Safety Analysis Methodology for the Kairos Power Fluoride Salt-Cooled High-Temperature Test Reactor - Topical Report)
  • ML24156A165  + (Kairos Power LLC, Safety Analysis Methodology for the Kairos Power Fluoride Salt-Cooled High-Temperature Test Reactor, Rev. 0)
  • ML20328A230  + (Kairos Power LLC, Submittal of Approved KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology Topical Report)
  • ML21162A350  + (Kairos Power LLC, Submittal of KP-FHR Fuel Performance Methodology Topical Report (Revision 3))
  • ML22088A229  + (Kairos Power LLC, Submittal of KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3)
  • ML22040A337  + (Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application)
  • ML22040A336  + (Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application)
  • ML23118A323  + (Kairos Power LLC, Submittal of Safeguards Information Protection Plan)
  • EPID:L-2023-LRM-0032  + (Kairos Power LLC, Submittal of Safeguards Information Protection Plan)
  • ML21013A430  + (Kairos Power LLC, Submittal of Topical Report KP-TR-006-NP-A, Revision 1, Scaling Methodology for the Kairos Power Testing Program)
  • ML19352G704  + (Kairos Power LLC, Submittal of Topical Report KP-FHR Fuel Performance Methodology)
  • ML23089A387  + (Kairos Power LLC, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1)
  • ML23089A386  + (Kairos Power LLC, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1)
  • ML23055A673  + (Kairos Power LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 2)
  • ML23055A672  + (Kairos Power LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 2)
  • ML24008A080  + (Kairos Power LLC, Summary of 11/2/2023, Public Meeting to Discuss Material Control and Accounting)
  • ML22110A018  + (Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping Comments)
  • ML22117A217  + (Kairos Power LLC, Supplemental Information for HCUL-10 for the Hermes Environmental Review)
  • ML23291A461  + (Kairos Power LLC, Supplemental Information for Environmental Report)
  • ML25274A111  + (Kairos Power LLC, Support and Endorsement of NEI 22-04)
  • ML21350A348  + (Kairos Power LLC, Topical Report Submittal of Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, KP-TR-007-NP-A)
  • ML22047A326  + (Kairos Power LLC, Topical Report, Submittal of KP8-FHR Mechanistic Source Term Methodology Topical Report, Revision 2)
  • ML23088A068  + (Kairos Power LLC, Transmitatl of Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Subcommittee on Hermes Preliminary Safety Analysis Report Chapters 5, 7, 8, and 11)
  • ML22049B556  + (Kairos Power LLC, Transmittal of CPA Changes)
  • ML22049B555  + (Kairos Power LLC, Transmittal of CPA Changes)
  • ML22263A032  + (Kairos Power LLC, Transmittal of Changes to Construction Permit Application - Financial Information Enclosure and PSAR Chapter 15)
  • ML22263A031  + (Kairos Power LLC, Transmittal of Changes to Construction Permit Application - Financial Information Enclosure and PSAR Chapter 15)
  • ML22284A152  + (Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 13)
  • ML22284A151  + (Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 13)
  • ML22242A166  + (Kairos Power LLC, Transmittal of Changes to Construction Permit Application – PSAR Chapters 3, 4, 8, and 13)
  • ML22181B158  + (Kairos Power LLC, Transmittal of Changes to Construction Permit Application)
  • ML22252A258  + (Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Table 4.2-5)
  • ML22252A257  + (Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Table 4.2-5)