Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Interim Report Pursuant to 10 CFR Part 21 (SSH 2002-001)". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20077F096  + (Interim Reliability Evaluation Program:Analysis of the Millstone Point Unit 1 Nuclear Power Plant.Vol III Appendix B.5 Thru B.8.Docket No. 50-245.(Northeast Nuclear Energy))
  • ML20080C020  + (Interim Reliability Evaluation Program:Analysis of the Millstone Point Unit 1 Nuclear Power Plant.Vol II - Appendix a and B.1 Thru B.4.Docket No. 50-245.(Northeast Nuclear Energy Company))
  • ML20090H871  + (Interim Reliability Evaluation Program:Analysis of the Calvert Cliffs Unit 1 Nuclear Power Plant.Volume 1.Main Report)
  • ML20085E215  + (Interim Reliability Evaluation Program:Analysis of the Millstone Point Unit 1 Nuclear Power Plant.Vol IV Appendix B.9 Thru B.19 and C.Docket No.50-245.(Northeast Nuclear Energy))
  • ML18025B877  + (Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix B-System Descriptions and Fault Trees.Docket No. 50-259.(Tennessee Valley Authority))
  • ML18025B880  + (Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix C-Sequence Quantification.Docket No. 50-259.(Tennessee Valley Authority))
  • ML20064M278  + (Interim Reliability Evaluation Program:Analysis of the Arkansas Nuclear ONE-UNIT 1 Nuclear Power Plant.Docket No. 50-313.(Arkansas Power and Light Company))
  • ML18025B876  + (Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Docket No. 50-259. (Tennessee Valley Authority))
  • ML20063P327  + (Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility)
  • ML14090A432  + (Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62)
  • ML14090A431  + (Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Testing of PV-62)
  • ML14192A040  + (Interim Report - 10CFR Part 21 Evaluation Regarding Potential Deficiencies)
  • ML13358A306  + (Interim Report - Inability to Complete 10CFR Part 21 Evaluation Regarding Cracking in KCR-13 Standby Battery Jars)
  • ML14094A012  + (Interim Report - Inability to Complete 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries)
  • ENS 50681  + (Interim Report - Potential Part 21 Notification)
  • ML14129A436  + (Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing)
  • ML14252A309  + (Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in Ensuring Customer Wall Thickness Requirements Were Met)
  • ML14241A238  + (Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in Ensuring Customer Wall Thickness Requirements Were Met)
  • ENS 47735  + (Interim Report Concerning Battery Cells with Potentially Reduced Discharge Capacity)
  • ML12073A347  + (Interim Report Concerning Battery Cells with Potentially Reduced Discharge Capacity)
  • ML17142A323  + (Interim Report Concerning Supply of Stainless Steel Tubing)
  • ENS 52745  + (Interim Report Concerning Supply of Stainless Steel Tubing)
  • 1CAN012101, Interim Report Concerning an Evaluation of Deviation  + (Interim Report Concerning an Evaluation of Deviation)
  • ENS 45697  + (Interim Report Concerning an Issue in Sump Blockage Generic Tests)
  • ML13023A047  + (Interim Report Pursuant to 10 CFR 21 - Unexpected Degradation of Vital Batteries Lll and Lv)
  • ENS 49234  + (Interim Report Regarding Laboratory Test Data for Safety Class C Concrete and Grout)
  • ML13277A010  + (Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA))
  • ML070110561  + (Interim Report for Completed Analyses for Samples from Sets Fifteen and Sixteen, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001))
  • ML072840255  + (Interim Report for Completed Analysis for Samples from Set Twenty-One from the Indian Point Power Station, Buchanan, New York. Dtd. May 3, 2007)
  • ML17311A909  + (Interim Report for Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem)
  • ML070110548  + (Interim Report for Requested Analyses for Samples from Sets Eleven Through Fourteen, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001))
  • ML070110559  + (Interim Report for Requested Analyses for Samples from Sets Seven Through Nine and Sets Eleven Through Fourteen, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001))
  • ML073110519  + (Interim Report for a Failure to Comply Under the Provisions of 1OCFR21)
  • ML12121A513  + (Interim Report of Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2))
  • ML19120A106  + (Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors)
  • ML19080A059  + (Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors)
  • ML18025A479  + (Interim Report of Reportable Deficiency Defect in RPV Susquehanna Unit 2 Bottom Head Side Plate)
  • ML18150A689  + (Interim Report of a Deviation or Failure to Comply)
  • L-MT-18-012, Interim Report of a Deviation or Failure to Comply  + (Interim Report of a Deviation or Failure to Comply)
  • L-MT-17-005, Interim Report of a Deviation or Failure to Comply  + (Interim Report of a Deviation or Failure to Comply)
  • L-PI-16-089, Interim Report of a Deviation or Failure to Comply  + (Interim Report of a Deviation or Failure to Comply)
  • L-PI-16-036, Interim Report of a Deviation or Failure to Comply  + (Interim Report of a Deviation or Failure to Comply)
  • W3F1-2018-0040, Interim Report of a Deviation or Failure to Comply  + (Interim Report of a Deviation or Failure to Comply)
  • ML19302D983  + (Interim Report of a Deviation or Failure to Comply)
  • ML21082A116  + (Interim Report of a Deviation or Failure to Comply)
  • ML25199A064  + (Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 Diesel Generator Starting Air System)
  • ML23121A325  + (Interim Report of a Deviation or Failure to Comply Associated with a GE Hfa Relay)
  • L-MT-17-031, Interim Report of a Deviation or Failure to Comply Regarding New Relay Coil GE Part Number 6306774G1  + (Interim Report of a Deviation or Failure to Comply Regarding New Relay Coil GE Part Number 6306774G1)
  • ML24175A004  + (Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System)
  • ML23335A072  + (Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump)