Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100J642 + (Interim Deficiency Repts 84-07 & 84-19 Re Crush Strength of Energy Absorbing Matl Supplied by Hexcel Used in Pipe Whip Restraints.Initially Reported on 841030.Hexcel Requested to Evaluate Matl W/Reduced Crush Strength)
- TXX-7022, Interim Deficiency Repts CP-86-46 & CP-86-76 Re Deficiency Involving Configurations & Dimensions of Gould Battery Racks.Initially Reported on 860611.Next Rept Will Be Submitted by 871218 + (Interim Deficiency Repts CP-86-46 & CP-86-76 Re Deficiency Involving Configurations & Dimensions of Gould Battery Racks.Initially Reported on 860611.Next Rept Will Be Submitted by 871218)
- ML20084U563 + (Interim Deficiency Repts DDR-222,223 & 225 Re Demineralized Water Sys Piping,Steam Lines & Standby Liquid Control Pump Discharge Relief Valve Drawings.Initially Reported on 760112)
- ML20078N160 + (Interim Deficiency Repts DER 82-57,DER 82-64 & DER 83-32 Re Conditions & Circumstances Surrounding Design Processes Involved W/Dissimilar Metal Socket Welds)
- ML20202G519 + (Interim Deficiency Repts DER 86-06 & DER 86-07 Re Inadequate Power Conversion Products Wiring Lug Terminations.Initially Reported on 860221.Battery Chargers & Diesel Generator Control Panels Will Be Reworked.Final Rept by 860425)
- GO2-83-358, Interim Deficiency Repts Re IE Circular 81-05, Sway Strut/ Snubber End Bushings & Anaconda Flexible Conduit.Initially Reported on 821202 & 830321,respectively.Quarterly Updates Will Continue to Be Provided.Next Rept Expected by 830720 + (Interim Deficiency Repts Re IE Circular 81-05, Sway Strut/ Snubber End Bushings & Anaconda Flexible Conduit.Initially Reported on 821202 & 830321,respectively.Quarterly Updates Will Continue to Be Provided.Next Rept Expected by 830720)
- ML20080J922 + (Interim Deficiency Repts Re Unverified Computer Code for Main Feedwater Pipe Supports.Issue Expected to Be Resolved & Final Rept Submitted by 840309)
- ML20051V634 + (Interim Deficiency Repts SD 413/82-09 & SD 414/82-09 ,were Submitted in Response to IE Bulletin 81-02, Failure of Gate-Type Valves to Close Against Differential Pressure. Final Rept Expected 820617)
- B10939, Interim Deficiency Repts SD-43 Re Inadequate Welds on Seismic Anchors Used for 480-volt Load Ctrs & SD-44 Re Improper Mounting Hardware for Air Handling Unit Cooling Coils.Update Expected by 840201 + (Interim Deficiency Repts SD-43 Re Inadequate Welds on Seismic Anchors Used for 480-volt Load Ctrs & SD-44 Re Improper Mounting Hardware for Air Handling Unit Cooling Coils.Update Expected by 840201)
- GO2-83-389, Interim Deficiency Repts on Condition 221 Re Namco EA-180 & EA-740 Limit Switches & Condition 226 Re 125-volt Dc Motor Operator Connected to 250-volt Dc Power Source.Next Rept by 830726 + (Interim Deficiency Repts on Condition 221 Re Namco EA-180 & EA-740 Limit Switches & Condition 226 Re 125-volt Dc Motor Operator Connected to 250-volt Dc Power Source.Next Rept by 830726)
- AECM-80-171, Interim Deficiency Status Rept 2 Re Reactor Pressure Vessel Feedwater Nozzle.Two Areas of Indications Identified.One Area Unacceptable Per ASME Section Iii.Nsss Vendor Will Grind Indications Off by mid-Sept.Final Rept by 801112 + (Interim Deficiency Status Rept 2 Re Reactor Pressure Vessel Feedwater Nozzle.Two Areas of Indications Identified.One Area Unacceptable Per ASME Section Iii.Nsss Vendor Will Grind Indications Off by mid-Sept.Final Rept by 801112)
- ML18030A149 + (Interim Deficiency Status Update Rept Re Pacific Check Valves.Bechtel Investigation & Rept Re Defective Check Valves Will Not Be Available Until 801231.Will Submit Final Rept by 810131)
- RBG-12-702, Interim Deficiency rept/DR-45 Re Failure to Meet Spec Requirements for Limited Access Welding,Initially Reported 820421.Evaluation Continuing.Next Rept Will Be Submitted by 820723 + (Interim Deficiency rept/DR-45 Re Failure to Meet Spec Requirements for Limited Access Welding,Initially Reported 820421.Evaluation Continuing.Next Rept Will Be Submitted by 820723)
- ML19305C929 + (Interim Deficiency rept:3/8-inch Orifices Shown on Flow Diagram Failed to Appear on Fabrication Isometric.S&W Isometrics Also Found Deficient.Caused by Transfer of Info. Drawings Will Be Corrected & Orifices Added by Rework)
- RBG-19480, Interim Deficiency/Part 21 Rept Re Topaz Inverters Supplied by Ge.Initially Reported on 841019.Discussions W/Ge Currently Underway to Determine Appropriate Corrective Action.Next Rept Expected by 850122 + (Interim Deficiency/Part 21 Rept Re Topaz Inverters Supplied by Ge.Initially Reported on 841019.Discussions W/Ge Currently Underway to Determine Appropriate Corrective Action.Next Rept Expected by 850122)
- TXX-6181, Interim Deficincy Rept CP-86-60 Re Gaps Between Polar Crane Girder & Girder Support Brackets.Initially Reported on 860904.Preliminary Review Results Indicate Condition Not Reportable Under 10CFR50.55(e).Final Rept by 870215 + (Interim Deficincy Rept CP-86-60 Re Gaps Between Polar Crane Girder & Girder Support Brackets.Initially Reported on 860904.Preliminary Review Results Indicate Condition Not Reportable Under 10CFR50.55(e).Final Rept by 870215)
- ML20010J489 + (Interim Deficinecy Rept Re Water Leakage Into Pits Housing Five ECCS Pump Suction Barrels,Initially Reported 810826. Investigation Continuing.Final Rept Will Be Submitted by 820120)
- ML20079B859 + (Interim Deviation/Noncompliance Rept 067 Re dry-type Insulator Cracking in Transformer Supplied by Westinghouse.Initially Reported on 910513.Util Notified Vendor on 910430 That Problem Affects Class 1E Transformer)
- ML20073R540 + (Interim Dficiency Rept 82-11 Re Incorrect Identification of Base Matl & Weld Procedures on Piping Hanger Travelers. Initially Reported on 821020.Further Traveler Review Necessary.Investigation to Be Completed in 90 Days)
- ML16341A237 + (Interim Directors Decision DD-84-19 Denying T Devine 840727,29,30 & 31 10CFR2.206 Petitions Requesting Commission Defer Licensing Action on Facility)
- ML20237J527 + (Interim Directors Decision DD-87-14 Under 10CF2.206 Denying Wb Golden Petition to Show Cause Why Plant Should Not Remain Closed or Have OL Suspended Until Listed Deficiencies Resolved.Related Info Encl)
- ML20197E029 + (Interim Directors Decision DD-88-07 Under 10CFR2.206.* Defers Portions of Commonwealth of Ma 871015 Petition Re Mgt & Emergency Preparedness Issues.Actions Re PRA & Attendant Plant Mods Not Warranted.Supporting Documentation Encl)
- ML20031A056 + (Interim Div I Sys Design Description for Oyster Creek Nuclear Generating Station Emergency Response Facilities)
- ML20136H063 + (Interim Dr for Lucent Technologies Re Explosions of List 1S Round Cell at Two non-nuclear Customer Sites.Initially Reported on 970127.Reminded Customers to Follow Safety Guidelines.Proprietary Details Encl.Encl Withheld)
- ML18087A716 + (Interim Draft Salem Restart Rept)
- ML20042B477 + (Interim Ecological Monitoring,1976)
- ML19323E740 + (Interim Endorsement of NEI 17-04, Model SLR Subsequent or Second License Renewal New and Significant Assessment Approach for SAMA, Revision 1)
- ML19338G427 + (Interim Equipment & Procedures at Browns Ferry to Detect Water in Scram Discharge Vol)
- RS-14-171, Interim Evaluation in Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (Interim Evaluation in Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- L-MT-14-035, Interim Evaluation in Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the + (Interim Evaluation in Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the)
- BVY 14-044, Interim Evaluation in Response to the NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (Interim Evaluation in Response to the NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- ML20036A073 + (Interim Fatique Design Curves for Carbon, LOW-ALLOY, and Austenitic Stainless Steels in LWR Environments)
- ML19247A006 + (Interim Final Rule Re Physical Protection of Irradiated Reactor Fuel in transit.NUREG-0561 Will Be Issued as Guide to Assist Licensees in Implementation of Requirements. Comment Period Ends on 790817)
- ML16155A153 + (Interim Final Rule: Adjustment of Civil Penalties for Inflation (Rin 3150-AJ72; NRC-2016-0057))
- ML19316A454 + (Interim Financial Statements,Second Quarter 1972)
- ML20086L295 + (Interim Findings on Adequacy of Radiological Emergency Response Planning by State & Local Govts at Facility. No Formal Exercise of Emergency Response Preparedness Conducted.Certificate of Svc Encl)
- ML19310A149 + (Interim Followup to 800131 Rept Re Possible Pipe Support Design Deficiency.Pipe Support Review Will Take Longer than Three Months.Completion Expected by June 1980.Current Status of Corrective Actions Includes Review of 5,760 Supports)
- ML21318A002 + (Interim Guidance MRP 2-21-005 Regarding MRP-227-A and MRP-227, Revision 1-A)
- ML010100519 + (Interim Guidance for In-situ Pressure Testing Pertaining to Pressurization Rate)
- ML18158A220 + (Interim Guidance for No Disposition Severity Level IV Violations with No Associated Performance Deficiency)
- ML012990239 + (Interim Guidance for Performing Risk Impact Assessments in Support of One-Time Extensions for Containment ILRT Tsurveillance Intervals)
- ML17300B416 + (Interim Guidance on the Use of Social Media (Enclosure 2))
- ML18254A221 + (Interim Guidance to Clarify the Use of Inspection Manual Chapter 0609 in Dispositioning Findings Identified Under Temporary Instruction 2515/193)
- ML17252A036 + (Interim Guidance. Recommends That Any In-Place Testing of Target Rock Safety/Relief Valves Following Maintenance & Reinstallation & Periodic Surveillance Testing as Required by NRC Regulations Be Conducted at 150 PSIG)
- ML20097D052 + (Interim Guidelines for Containment Purge Operation Clinton Power Station - Unit 1)
- ML20129E467 + (Interim Hud/South Dakota Radiation Survey Protocol)
- ML19340A985 + (Interim Insp Rept SO-II-7 on 680916-20.No Noncompliance Noted.Major Areas Inspected:Written Matl Control & Accounting Procedures,Internal & External Fuel Movement Documentation & Inventory Records.Final Rept by 681220)
- ML19259B784 + (Interim Itt Grinnell Rept Indicates That Six Anchors Are within ASME Section III Code Requirements Re Allowable Stress.Addl Rept,Either Interim or Final,Will Be Sent on or Before 790501)
- 05000416/LER-1982-138, Interim LER 82-138/99X-0:on 821112,during Shutdown,Several Duct Covers Could Not Be Installed Due to Cables Extending Through Ducts.Caused by Faulty Design Document.Engineering Evaluation Underway + (Interim LER 82-138/99X-0:on 821112,during Shutdown,Several Duct Covers Could Not Be Installed Due to Cables Extending Through Ducts.Caused by Faulty Design Document.Engineering Evaluation Underway)
- ML19170A381 + (Interim Letter - Chapter 3, Section 3.9.2, and Chapters 14, 19 and 21 of the NRC Staffs Safety Evaluation Report with Open Items Related to the Design Certification Application Review of the Nuscale Small Modular Reactor)
- ML19204A278 + (Interim Letter - Chapters 3, 6, 15 and 20 of the NRC Staffs Safety Evaluation Report with Open Items Related to the Design Certification Application Review of the Nuscale Small Modular Reactor)