Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203F630 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted: Radiography on 990213 & 15-17 at Petersen Efm)
- ML20203H031 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted:Leak Testing or Calibrations)
- ML20205H008 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted:Portable Gauges on 990323-0923)
- ML20205H003 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted:Portable Gauges,Scheduled for 990329-0601)
- ML20216D566 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted:Use of C-14 Labeled NaHCO3 in Primary Productivity Studies in Four Lakes of Sawtooth Mountains,Scheduled for 990726-31)
- ML20205M699 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted: Radiography,Scheduled for 990407)
- ML20203F570 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted:Prepare Source Holder for Shipment on 990130-0201 at Tuscaloosa Steel Corp)
- ML20196K755 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted: Radiography,Scheduled for 990614)
- ML20212C823 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted:Well Logging on 990918-21 for Obrien Energy)
- ML20210F233 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted: Portable Gauges.Work Scheduled for 990719-1130)
- ML20206T922 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted:Portable Gauges on 990511-1101 for Colorado Interstate Gas Co)
- ML20196K764 + (Initial NRC Form 241, Rept of Proposed Activities in Non-Agreement States. Activities to Be Conducted: Radiography.Work Scheduled for 990705-1231)
- ML25136A373 + (Initial NRC Staff Comments on NEI 24-11 Fire Brigade Staffing Analysis for Advanced Reactor Technology for Public Meeting on May 22, 2025)
- ML20198A254 + (Initial NSHC Determination & Noticing Action Re Util 850906 Application to Amend Licenses DPR-80 & DPR-82,implementing Relaxed Axial Offset Control for Unit 1 After 8,000 Mwd/ Module Test Unit Burnup.Amend Involves NSHC)
- ML20105B894 + (Initial NSHC Determination & Noticing Action Re Util 830801 & 1027 Applications for Amend to License DPR-6,revising Tech Specs to Delete Reload Fuel Enrichment.Amend Request Involves Nshc.Draft Ltr to Util Encl)
- ML20151H984 + (Initial NSHC Determination & Noticing Action Re Util 830812 Request to Limit Overtime of Workers Performing safety-related Functions & Requirement for Reporting PORV Challenges on Annual Basis)
- ML20151H829 + (Initial NSHC Determination & Noticing Action Re Util 830415 Application to Limit Overtime Worked by Personnel Performing safety-related Functions & Include PORV Reporting Requirement.Amend Request Involves NSHC)
- ML19310G648 + (Initial NSHC Determination & Noticing Action Re Util 841203 Application to Amend License NPF-3 Re Auxiliary Feedwater Operability)
- ML20210Q090 + (Initial NSHC Determination & Noticing Action Re Util 860424 Application for Amend to License DPR-72 Re Plant Operation W/Redesigned Reactor Coolant Pump Supports.Amend Involves NSHC)
- ML20198A262 + (Initial NSHC Determination & Noticing Action Re Util 850827 Application for Amends to Licenses DPR-80 & DPR-82 Re Electrical Power Sys Battery Sets & Associated Chargers)
- ML20198A249 + (Initial NSHC Determination & Noticing Action Re Util 850920 Application to Amend Licenses DPR-80 & DPR-82,allowing Performance of First Inservice Snubber Visual Insp for Unit 2 Following Power Ascension Program.Amend Involves NSHC)
- ML20090G651 + (Initial NSHC Determination & Noticing Action Re Util 830603 Application to Change Tech Specs to Incorporate Revised Safety & Operating Limits W/One Recirculation Loop Out of Svc)
- ML20091K766 + (Initial NSHC Determination & Noticing Action Re Util 820304 Application,Modified 820903 & 830106,for Amend to Licenses DPR-33,DPR-52 & DPR-68,permitting Single Loop Operation Up to 50% Power)
- ML20209D218 + (Initial NSHC Determination & Noticing Action Re Util 840608 Request for Amend to License DPR-76,revising Tech Specs Re Emergency/Security Plan Audit Frequency,Staff Work Hours & Notification of Failure of PORVs & Safety Valves)
- ML20151H817 + (Initial No Significant Hazards Consideration Determination & Noticing Action Re 820831 Application to Approve Tech Spec Changes Reflecting Use of GE Supplied Reload Fuel & Core Design Features for Cycle 10 Operation)
- L-PI-17-037, Initial Notification of Failure to Comply or Existence of a Defect + (Initial Notification of Failure to Comply or Existence of a Defect)
- ML20027A553 + (Initial Notification of Noncompliance by Anchor Darling Valve Co in Delivery of Valve Actuators to Subj Facils. Valves Did Not Meet Purchaser Specs)
- ML20204D388 + (Initial Notification of Reportable Occurrence 50-298-78-35 on 781124.Recirculation MG Set B Was Tripped,Then a Fuse Was Pulled for Exam,Allowing MG Set B to Ramp Up in Speed, Causing Fast Pwr Increase.Due to Personnel Error)
- ML20215H180 + (Initial OL Readiness Assessment for Braidwood Station, Unit 1)
- ML20215A238 + (Initial OL Readiness Assessment for Clinton Power Station)
- IR 05000423/1985067 + (Initial OL Review Insp Rept 50-423/85-67.Major Areas Inspected:Const,Preoperational Testing,Preparations for Operation,Allegations & SALP)
- IR 05000354/1986025 + (Initial OL Review Rept 50-354/86-25)
- IR 05000410/1986062 + (Initial OL Review Rept 50-410/86-62.Facility Constructed Per CPPR-112,FSAR & NRC Regulations & Util Ready to Safely Operate Facility)
- IR 05000412/1987044 + (Initial OL Review Rept for Facility (Insp Rept 50-412/87-44))
- ML20239A657 + (Initial OL Review Rept for Nine Mile Point Unit 2)
- ML20214R485 + (Initial OL Review Rept for Seabrook Station Unit 1)
- ML20246C967 + (Initial OL Review Rept,Suppl 1 for Seabrook Station Unit 1)
- ML20214T221 + (Initial OL Review Rept:Millstone Point Unit 3)
- ML003753777 + (Initial Observations on Proposed RISK-INFORMED Part 50 Option 2 Categorization Guideline)
- ML111990115 + (Initial On-Site Finding of the Independent Reactor Decommissioning Trust Fund Oversight Analysis)
- ML111990230 + (Initial On-Site Findings of the Independent Reactor Decommissioning Trust Fund Oversight Analysis)
- ML111990205 + (Initial On-Site Findings of the Independent Reactor Decommissioning Trust Fund Oversight Analysis)
- ML111990187 + (Initial On-Site Findings of the Independent Reactor Decommissioning Trust Fund Oversight Analysis)
- ML111990127 + (Initial On-Site Findings of the Independent Reactor Decommissioning Trust Fund Oversight Analysis)
- ML111990141 + (Initial On-Site Findings of the Independent Reactor Decommissioning Trust Fund Oversight Analysis)
- ML14043A526 + (Initial Operating Licensing Written Examination Approval Letter for Indian Point Station, Unit 2)
- ML052570455 + (Initial Operating Test Outline Submittal for the Clinton Initial Examination - July 2005)
- IR 05000277/1996010 + (Initial Operator Exam Repts 50-277/96-10OL & 50-278/96-10OL on 960913-20.Exam Results:Eleven of Twelve Applicants Passed Exam & Were Subsequently Issued Licenses & One SRO Applicant Did Not Pass Operating Portion of Exam)
- ML040960531 + (Initial Operator Examiantion - February 2004 - Final Sro/Ro Written Examination)
- ML052220544 + (Initial Operator Examination Submittal)
- ML020670374 + (Initial Operator License Examination)