Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Informs of Changes to Plant Operating Organization,Effective 940701". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML17312B281  + (Informs of Changes in Reporting Structure for PVNGS)
  • ML20202H672  + (Informs of Changes in Schedule Affecting Four Commitments in ,By Greater than One Month & Notifies of Plans to Issue Rev 3 to Strategy for Achieving Engineering Excellence)
  • ML19340E307  + (Informs of Changes in Shift Technical Advisor Program. Weaknesses in Training Program Made Evident by Qualification Exam Results Will Be Supplemented by Requalification Program Beginning Jan 1981)
  • ML18101A474  + (Informs of Changes of Greater than 50 F to Calculated PCT for Units 1 & 2 LOCA Analyses)
  • ML20043H516  + (Informs of Changes of Responsibility for Plant Emergency Plan,Effective 900605)
  • IR 05000263/1986008  + (Informs of Changes on Page 11,Item 4 Re Automatic Fire Detection in Insp Rept 50-263/86-08.Listed Phrase Should Be Removed)
  • B14660, Informs of Changes to & Errors in ECCS Evaluation Model or Application of Model for Mnps Unit 3 Per 10CFR50.46(a)(3)(ii)  + (Informs of Changes to & Errors in ECCS Evaluation Model or Application of Model for Mnps Unit 3 Per 10CFR50.46(a)(3)(ii))
  • W3P83-2695, Informs of Changes to 830902 Commitment on IE Bulletin 83-05 Re Control of Hayward Tyler Pump Co Supplied Spare Parts. Only Parts Ordered on Purchase Orders A84407-D,A84244-D or A84406-D Affected  + (Informs of Changes to 830902 Commitment on IE Bulletin 83-05 Re Control of Hayward Tyler Pump Co Supplied Spare Parts. Only Parts Ordered on Purchase Orders A84407-D,A84244-D or A84406-D Affected)
  • ML17298C000  + (Informs of Changes to 830926 Salt Deposition & Impact Monitoring Plan,Including Monitoring Location,Soil Sampling Analysis & Vegetation Sampling/Analysis Changes.Program Objectives Unaffected)
  • ML20215A260  + (Informs of Changes to Action Limits,Reject Limits & Setpoint for Two Main Steam Line High Flow Switches,Per Util 870310 Commitment.New Limits Achieved by Improving Population of Static O-Ring Differential Pressure Switches)
  • ML20126L783  + (Informs of Changes to Administrative Controls & Documents All Spent Fuel Pool Cooling Related Administrative Controls, Including References)
  • ML20003E840  + (Informs of Changes to Be Made to Small Break Model LOCTA-IV Computer Program.Changes Will Allow Code Internal Calculation of Clad Heat Up Rate Dependent Burst Curve to Extend to 2 F/Sec & Capability to Handle 30 Axial Nodes)
  • ML20217G411  + (Informs of Changes to Big Rock Point Defueled Emergency Plan, That Meet Requirements of 10CFR50.54(q) & Can Be Made Without NRC Approval.Changes to Plan Are Listed)
  • ML20034A687  + (Informs of Changes to CENPD-210-A,Rev 5, Description of Nuclear Power Businesses QA Program. Effective 900406, Ae Scherer Succeeded Wd Mawhinney as vice-president in Charge of QA Functions)
  • ML20214J062  + (Informs of Changes to Code TOODEE2 to Correct Implementation of Approved Exem/Pwr Evaluation Model Used to Calculate Fuel Rod Heatup.Corrected Code Will Be Used in Future Loca/Eccs Analyses)
  • GO2-95-158, Informs of Changes to Commitments Made in Re Visual Insp & Replacement of Containment Penetration Modules  + (Informs of Changes to Commitments Made in Re Visual Insp & Replacement of Containment Penetration Modules)
  • ML17312A717  + (Informs of Changes to Distribution List)
  • ML20056H081  + (Informs of Changes to ECCS EM Required by 10CFR50.46(a)(3)(ii))
  • ML20153C243  + (Informs of Changes to Emergency Planning Program.Personnel Accessing Site Receive Ltr Describing Expected Action. Accountability Guidelines Provided to Station Dept Heads & Contractor Supervisory Personnel for Review)
  • ML20154G855  + (Informs of Changes to FSAR Initial Test Program,Per 10CFR50.59(b) & License Condition 2.C(6).Test STP-25.3, MSIV Full Closure Testing, Changed to Test Plant Response During Closure of MSIVs at 90-100% Power)
  • ML20035A703  + (Informs of Changes to Facility Drywell Thickness Measurement Insp Program)
  • ML20196E639  + (Informs of Changes to Fixed Site & Transportation Plan for Protection of SNM of Moderate & Low Strategic Significance, Deleting Refs to Special Products)
  • ML20151E461  + (Informs of Changes to Listed Telephone Prefixes at Corporate Headquarters Due to Improvements in Telecommunications Sys to Become Effective 880411)
  • ML20198A865  + (Informs of Changes to Local & Commercial Telephone Number Prefixes for Region II Ofc.Changes Effective 851112)
  • ML20198A727  + (Informs of Changes to Local & Commercial Telephone Number Prefixes at Region II Ofc.Changes Effective 851112)
  • ML20127K235  + (Informs of Changes to Radiological Emergency Exercise (Fosavex) 1985 Scenario.Exercise Must Be Held During Normal Working Hours.Predetermined Meteorological Data Will Be Used for Dose Calculations.Exercise Will Begin 850618)
  • ML19327B932  + (Informs of Changes to Staffing of Fire Brigade at Plant. Composition of Brigade Now Includes Leader & Two full-time Members from Fire Operations Unit)
  • ML20237F728  + (Informs of Changes to Startup Test Program Per License Condition C(3).Changes Involve Test Results Obtained Up Through 30% Test Plateau & Deletion of Test at 5% Power Plateau)
  • ML20086G798  + (Informs of Changes to Svc List,Per Request of Jn Fox)
  • ML20083C962  + (Informs of Changes to TS Bases,Revising Bases Sections 2.1.B & 3.2 to Clarify Design Function of Arpm Rod Block Sys & 3.5.M to Reflect Current Info on Core thermal-hydraulic Instabilities)
  • ML20113G586  + (Informs of Changes to Ventilation Sys & Plan for Interim Operation of Equipment During Completion of Unit 2 Const & Testing.Summary of Test Results of Control Room HVAC Recirculation Filter & Air Intake Dampers Encl)
  • ML19261C637  + (Informs of Changing Preferred Date from Apr 1 to Jul 1 of Each Year for Transmittals Re Annual Certified Financial Statements & Cash Flow Projections)
  • ML20081B212  + (Informs of Citizen Concern Re Const Defects & QA Breakdowns & Urges Initiation of Further Action Assuring Total Safety of Plant)
  • ML20077C258  + (Informs of Clarification of Listed Items from Insp Rept 50-219/91-02 Re Emergency Preparedness)
  • ML13330A410  + (Informs of Clarifications for Implementation of Amend 58 to License DPR-13.W/power Operated Relief Valve Inoperable, Tech Spec 3.1.5.B Should Read That Block Valves Should Be Maintained.Requests Suppl to Amend 58 Reflecting Changes)
  • ML19331D867  + (Informs of Class 3 Fee Requirement for Review of Fish Impingement Study)
  • ML20023C096  + (Informs of Class I & III Fee Classification for 830324 Application for Tech Spec Changes Re Auxiliary Feedwater Sys Operability.Overpayment for 790926 Application for Administrative Changes Will Be Applied Toward Current Fees)
  • ML20033B782  + (Informs of Class I Fee Requirement for 810816 Application for Review of Guard Training & Qualification Plan)
  • ML20053A676  + (Informs of Class II Fee Requirement for 810209 Application to Extend Completion Dates for Approved Fire Protection Mods)
  • ML20032A253  + (Informs of Class II Fee Requirement for 810831 Application to Extend CPPR-137,due to Administrative Nature of Request)
  • ML20054K347  + (Informs of Class III Fee Requirement for 820430 Application to Amend Tech Specs to Clarify & Reflect Actual Plant Configuration.Mod to Refueling Interlocks Requires Class III Fee)
  • ML17341B183  + (Informs of Class III Fee Requirements for 820405 Application for License Amend 85 to Make Changes in Boric Acid Transfer Pumps)
  • ML19283B804  + (Informs of Classified Document Containing Info Potentially Relevant to Issue of Sabotage of Spent Nuclear Fuel & of NRC Assessment of Info to Be Made Available)
  • ML20136B502  + (Informs of Clerical Error in Bill of Matl Which Resulted in Viton Seat Matl Being Used Instead of Ethylene Propylene on Catalog Np 206-381-6RU Solenoid Valve.Customers W/Valves Contacted)
  • PY-CEI-NRR-1709, Informs of Cleveland Electric Illuminating Co Adoption of Early Implementation of 10CFR20.1001-20.2401 on 931004  + (Informs of Cleveland Electric Illuminating Co Adoption of Early Implementation of 10CFR20.1001-20.2401 on 931004)
  • ML20093B095  + (Informs of Close Out of GL 89-10, SR MOV Testing & Surveillances Activities)
  • ML20155J252  + (Informs of Close Out of Issue Raised by NRC in Re Issuance of Amend for SONGS)
  • ML20236X965  + (Informs of Closeout Action for Contract NRC-04-96-040. Contract Expired 970616.Expiration/completion Invoice Requested to Be Submitted for Final Billing Period Under Contract for Provisional Reimbursement)
  • ML17156B012  + (Informs of Closeout of 850131 Tech Spec Change Request & 850503 Rev Re Automatic Depressurization Sys)
  • IR 05000410/1986056  + (Informs of Closeout of Allegation RI-86-A-0125.Region Findings Documented in Insp Rept 50-410/86-56 Dtd 861217. Allegation Unsubstantiated.B.Cook Feb 10 Memo Encl)