Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235S942 + (Informs That Util Unable to Provide Requested Implementation Dates for plant-specific Licensing Actions by 870930.Marked- Up List Containing Substantial Amount of Info Will Be Provided by 871030)
- 0CAN128607, Informs That Util Unable to Respond within Requested Timeframe to Re Insp Repts 50-313/86-26, 50-368/86-34,50-313/85-26 & 50-368/85-27.Responses Will Be Provided by 870131 + (Informs That Util Unable to Respond within Requested Timeframe to Re Insp Repts 50-313/86-26, 50-368/86-34,50-313/85-26 & 50-368/85-27.Responses Will Be Provided by 870131)
- ML20113H485 + (Informs That Util Unable to Supply Supporting Documentation, Justifying Changes to UFSAR Relative to Ref IEEE 6.5,per NRC Re Insp Repts 50-317/92-05 & 50-318/92-05 on 920210-14)
- ML20036A364 + (Informs That Util Understands That Prior Schedule for Summary Disposition Motions Suspended & That Revised Schedule Will Be Discussed at Prehearing Conference)
- ML20117F595 + (Informs That Util Updated Contract W/Landowner of Saginaw Spur Laydown Area Used for Storage of Equipment.Cash Settlement Re Termination of Lease Based on Cost of Returning Land to Pasture)
- ML17264A777 + (Informs That Util Used Ratio Procedure as Described in Position 2.1 of RG 1.99,rev 2 & Specified Margin Terms)
- ML20078G141 + (Informs That Util Verified That Issue Re Westinghouse Alloy 600 Thermally Treated (Tt) Mechanical Plugs Does Not Impact BVPS Units 1 & 2,in Response to W Dec 1994 Notification. Repairs Implemented at BVPS Address Concerns in in 94-087)
- ML19323A940 + (Informs That Util Was Unable to Meet 800428 Deadline Re Calculations That Provide Backup Support for Ter.Current Target Date for Submittal Is 800523)
- ML20154A644 + (Informs That Util Will Accept Listed Documented Training Until NRC-wide Training Program for Unescorted Access Becomes Established)
- ML19260D820 + (Informs That Util Will Accept NRC Equivalent of Radiation Safety Training Course Presented by Util.Requests Review of RP-101, Radiation Protection Manual, During NRC Visit)
- B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant + (Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant)
- L-96-236, Informs That Util Will Aggressively Pursue Implementation of Fire Barrier Mods During 1997 Outages & Will Complete Remaining Items During Subsequent Refueling Outages Scheduled for Sept 1988 on Unit 3 & March 1999 on Unit 4 + (Informs That Util Will Aggressively Pursue Implementation of Fire Barrier Mods During 1997 Outages & Will Complete Remaining Items During Subsequent Refueling Outages Scheduled for Sept 1988 on Unit 3 & March 1999 on Unit 4)
- ML20211K856 + (Informs That Util Will Allow CPPR-155 to Expire Due to Cancellation of Plant.Environ Concerns Re Const Will Continue to Be Addressed Due to Site Shared W/Unit 3)
- ML20137L808 + (Informs That Util Will Allow CPPR-174 to Expire Per 10CFR50.55(b),as Const Terminated in Jan 1982.Site Presents No Nuisance or Hazard to Public Due to Remoteness & Controlled Access)
- ML20198L429 + (Informs That Util Will Allow Degreed STAs with SRO Certifications to Perform STA Duties in Order to Facilitate Conversion of STA Staff from Engineering to Operations Personnel)
- ML20214M147 + (Informs That Util Will Amend FSAR Section 14.2.12.66.2, Containment Air Recirculation Sys Test, to State That Containment Air Temp Will Be Recorded at 5%,50% & 100% Reactor Power Levels Using Installed Sensor Sys)
- ML19260A451 + (Informs That Util Will Apply Accepted QA Program to Radioactive Matl Packages)
- ML20211H571 + (Informs That Util Will Arrange for Sampling at Least One Wk After Last Addition to Lagoon & Will Transmit Copy of Results to Ofc)
- ML20204F140 + (Informs That Util Will Attempt to Complete Valve Testing & Submit Final Rept Per IE Bulletin 85-003 Schedule.Outage Schedule Constraints May Impose Delay.Justirication Will Be Provided in 861001 Response to Item (E))
- B12376, Informs That Util Will Attempt to Isolate Fire Water Sys from Penetration P-80 by Installing Blank Flange,If Necessary,During Next Integrated Leak Rate Test,Per Request at 860814 Meeting Re Util 10CFR50,App J Exemption Requests + (Informs That Util Will Attempt to Isolate Fire Water Sys from Penetration P-80 by Installing Blank Flange,If Necessary,During Next Integrated Leak Rate Test,Per Request at 860814 Meeting Re Util 10CFR50,App J Exemption Requests)
- ML20118B859 + (Informs That Util Will Attempt to Pull Tubes Under Listed Priorities & Guidelines,In Support of Interim/Alternate Plugging Criteria During Upcoming Unit 1 Eleventh Refueling Outage)
- ML20204A147 + (Informs That Util Will Be Billed for Review of 850208 SER Re Reactor Bldg Decontamination & Dose Reduction Activities in Next Invoice.Review Required to Ensure Decontamination & Dose Reduction Accomplished in Safe Manner)
- ML20062D355 + (Informs That Util Will Be Billed for Review of Revision 11 to Topical Rept YOQAP-1-A, Operational QA, Per 10CFR170.21,Category F)
- ML20196J796 + (Informs That Util Will Be Converting Equipment Qualification Audit Binders from Purchase Order Basis to Equipment Type Basis,In Response to Unresolved Item 50-354/88-03)
- ST-HL-AE-5199, Informs That Util Will Be Developing Formal Calculations for Determining Optimal Instantaneous Trip Settings for Molded Case Circuit Breakers Based on Parameters Established in in 92-051 Suppl 1 & Current IEEE Stds + (Informs That Util Will Be Developing Formal Calculations for Determining Optimal Instantaneous Trip Settings for Molded Case Circuit Breakers Based on Parameters Established in in 92-051 Suppl 1 & Current IEEE Stds)
- 3F0397-12, Informs That Util Will Be Extending Second Isi/Ist Interval for Plant + (Informs That Util Will Be Extending Second Isi/Ist Interval for Plant)
- LR-N970250, Informs That Util Will Be Prepared to Commence Mode Ascension for Plant Unit 2 About 970508 Based on Work Completed to Date.Restart Assessment Team Insp Requested + (Informs That Util Will Be Prepared to Commence Mode Ascension for Plant Unit 2 About 970508 Based on Work Completed to Date.Restart Assessment Team Insp Requested)
- LR-N980004, Informs That Util Will Be Prepared to Enter Mode 4 During First Week in Feb 1998 Based on Activities to Be Performed. Info Is Provided So That Appropriate Arrangements Can Be Made for NRC Restart Assessment Team Insp + (Informs That Util Will Be Prepared to Enter Mode 4 During First Week in Feb 1998 Based on Activities to Be Performed. Info Is Provided So That Appropriate Arrangements Can Be Made for NRC Restart Assessment Team Insp)
- B16975, Informs That Util Will Be Ready for Insp on 980209 Re Effective of Licensee Controls in Identifying,Resolving & Preventing Problems + (Informs That Util Will Be Ready for Insp on 980209 Re Effective of Licensee Controls in Identifying,Resolving & Preventing Problems)
- ML20215E115 + (Informs That Util Will Be Refueling Unit 2 by Jan 1987. Evaluations of Static O-Ring Switch experience,long-term Program & Justification for Continued Operation Will Be Provided by util.Short-term Operation of Unit 1 Justified)
- ML13326A186 + (Informs That Util Will Be Relocating Business Ofc from 23 Parker Street,Irvine,Ca to San Onofre Nuclear Generating Station,San Clemente,Ca on 950501)
- B14658, Informs That Util Will Be Relying,In Part,On Digital Components to Provide Portion of Improvements to Be Implemented During Cycle 18 Refueling Outage to Address Postulated Isloca,W/Regard to Isap Topic 1.02 + (Informs That Util Will Be Relying,In Part,On Digital Components to Provide Portion of Improvements to Be Implemented During Cycle 18 Refueling Outage to Address Postulated Isloca,W/Regard to Isap Topic 1.02)
- ML17335A221 + (Informs That Util Will Be Revising Implementation Date for Expanded Instrument Uncertainty Program.Final Calculations & Procedure Revs Will Not Be Complete by End of 1998 Due to Scope Changes Created by Internal Review of TS)
- ML20117M897 + (Informs That Util Will Be Revising Two Commitments Discussed in 950428 & s Re Testing of Control Room Emergency Filter Sys at Station)
- ML20082N733 + (Informs That Util Will Be Submitting TS Amend Request to Renew Current 1 Volt IPC for Cycle 6,in Event That Request for 3 Volt IPC Not Approved Prior to Plant Fall Refueling Outage)
- ML20086D336 + (Informs That Util Will Be Unable to Complete Exam of Witness in 2 1/2 Days of Hearing Scheduled for 940706-08 in Rockville)
- 3F0587-14, Informs That Util Will Be Unable to Respond to Violation Re Failure to Meet Requirements of Tech Spec 4.3.3.6 Noted in Insp Rept 50-302/87-10 on Time Due to Continuing Evaluations.Response Expected by 870612 + (Informs That Util Will Be Unable to Respond to Violation Re Failure to Meet Requirements of Tech Spec 4.3.3.6 Noted in Insp Rept 50-302/87-10 on Time Due to Continuing Evaluations.Response Expected by 870612)
- ML20206P219 + (Informs That Util Will Be Using Revised Design Basis Info Re W Laser Welded Sleeves Inside SG Tubes at Tube Support Plate & Tubesheet Regions,For Byron & Braidwood Stations)
- ML20054G693 + (Informs That Util Will Be in Technical Violation of Section 15.6.12 of Tech Spec,Requiring Environ Qualification of Electrical Equipment Per NUREG-0588 by 820630.NRC Should Remove or Modify Tech Spec)
- ST-HL-AE-1976, Informs That Util Will Call on NRC to Exercise Available Options to Force Gap to Make Safety Concerns Known to NRC or Safeteam.Util So Far Unsuccessful in Developing Acceptable Basis for Gap to Supply Info + (Informs That Util Will Call on NRC to Exercise Available Options to Force Gap to Make Safety Concerns Known to NRC or Safeteam.Util So Far Unsuccessful in Developing Acceptable Basis for Gap to Supply Info)
- ML20217A108 + (Informs That Util Will Change Encl TS Bases 3.10.B to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Supply Battery Be Considered Inoperable If Any One Cell Is Below Specification Voltage)
- ML17265A189 + (Informs That Util Will Change Insp Frequency of Thimble Tube Performance Based on Results of 1997 Refueling Outage Insp. Licensee Stated in to Test Once Every Two Years, in Response to NRC Bulletin 88-009)
- ST-HL-AE-2155, Informs That Util Will Clean Diesel Generator Oil Storage Tanks Using Sodium Hypochlorite Solution Prior to End of 10 Yr Interval,Per Tech Spec Surveillance Requirement 4.8.1.1.2.g.1.Beginning of 10 Yr Interval Is May 1986 + (Informs That Util Will Clean Diesel Generator Oil Storage Tanks Using Sodium Hypochlorite Solution Prior to End of 10 Yr Interval,Per Tech Spec Surveillance Requirement 4.8.1.1.2.g.1.Beginning of 10 Yr Interval Is May 1986)
- ML20073C430 + (Informs That Util Will Complete Activities Required to Address GL 89-10 Through Suppl 6 by Completion of Refueling Outage 4 Currently Scheduled to Begin 960107)
- ML20077A830 + (Informs That Util Will Complete Documented Assessment by 941231 Too Determine Whether Emergency Procedures & Operator Training Need to Be Enhanced to Provide Addl Protection for Prevention of SG Overfill,W/Respect to GL 89-19)
- ML18064A676 + (Informs That Util Will Complete Exams & Testing Required by Second Interval ISI Program During 1995 Refueling Outage Scheduled to Begin in Late May of 1995)
- ST-HL-AE-2278, Informs That Util Will Complete Power Ascension Testing at 50% Plateau During Last Wk of Oct 1987.Requests Performance Review Prior to Power Ascension Above 50% Power to Provide for NRC Input to Assessment + (Informs That Util Will Complete Power Ascension Testing at 50% Plateau During Last Wk of Oct 1987.Requests Performance Review Prior to Power Ascension Above 50% Power to Provide for NRC Input to Assessment)
- ML20214N453 + (Informs That Util Will Complete Reinsp of All Nonconforming Piping in Accordance W/Generic Ltr 84-11 Guidelines at Next Scheduled Refueling Outage)
- ML20129A364 + (Informs That Util Will Complete Repair of Fire Penetration Seal Located in Cable Vault Following Startup.Appropriate Compensatory Measures Will Be Maintained Until Repair Has Been Completed)
- ML18153A788 + (Informs That Util Will Comply W/Actions & Responses within 180 Days of Date of GL 95-07)
- RBG-22603, Informs That Util Will Comply W/Nrc Sept 1985 Policy Statement Re Shift Technical Advisors on Shift Prior to Startup After First Refueling Outage.When Shift Technical Advisor Utilized,Fifth Operator Will Be Assigned to Shift + (Informs That Util Will Comply W/Nrc Sept 1985 Policy Statement Re Shift Technical Advisors on Shift Prior to Startup After First Refueling Outage.When Shift Technical Advisor Utilized,Fifth Operator Will Be Assigned to Shift)