Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20259D067 + (HVAC-Air Flow Diagram. Sheet 1. Actual Drawing NUMBER:LOU-1564 G-853S01)
- ML20263J911 + (HVAC-Air Flow Diagram:Control Room)
- ML20263J914 + (HVAC-Air Flow Diagram:Electric & Battery Rooms)
- ML20263J916 + (HVAC-Air Flow Diagram:Fuel Handling Building)
- ML20263J940 + (HVAC-Air Flow Diagram:Rab Composite)
- ML20263J931 + (HVAC-Air Flow Diagram:Rab Elev 335 Ft)
- ML20263J928 + (HVAC-Air Flow Diagram:Rab Elev 362.50 Ft)
- ML20263J925 + (HVAC-Air Flow Diagram:Rab Elev 390 Ft,417.50 Ft,442 Ft)
- ML20263J919 + (HVAC-Air Flow Diagram:Reactor Building)
- ML20263J922 + (HVAC-Air Flow Diagram:Turbine Bldg & Diesel Gen Rm)
- ML20259D081 + (HVAC-Air Flow Diagrams. Sheet 2. Actual Drawing NUMBER:LOU-1564 G-853S02)
- ML17312A145 + (HVAC-CONTROL Diagrams.Sheet 1)
- ML17312A146 + (HVAC-CONTROL Diagrams.Sheet 2)
- ML20259D033 + (HVAC-Chilled Water Flow Diagram. Sheet 1. Actual Drawing NUMBER:LOU-1564 G-853S04)
- ML20259D042 + (HVAC-Chilled Water Flow Diagram. Sheet 2. Actual Drawing NUMBER:LOU-1564 G-853S04)
- ML20259D051 + (HVAC-Chilled Water Flow Diagram. Sheet 3. Actual Drawing NUMBER:LOU-1564 G-853S05)
- ML20259D061 + (HVAC-Chilled Water Flow Diagram. Sheet 4. Actual Drawing NUMBER:LOU-1564 G-853S06)
- ML20266F611 + (HVAC-Flow Diagram:Reactor Bldg)
- ML20070B220 + (HYDROGEN-AIR-DILUENT Detonation Study for Nuclear Reactor Safety Analyses)
- ML20101A880 + (HYDROGEN-BURN Survival Experiments at Fully Instrumented Test Site (Fits))
- ML20126M919 + (HYDROGEN-STEAM JET-FLAME Facility and Experiments)
- ENS 47819 + (Habitability Requirement Not Met Due to Maintenance on the Tsc)
- ML20096E921 + (Habitat Selection of Striped Bass in Lake Norman, Final Rept)
- ML073240729 + (Habitat Utilization and Biological Characteristics of Adult Atlantic Sturgeon in Two South Carolina Rivers)
- ML050590040 + (Hacth Units 1 & 2, Enclosure, Amendment No. 244- PAM Instrumentation 3.3.3.1 and Amendment No. 188 Appendix a TS Revised Pages (Tac No. MC3226, MC3227))
- CY-06-099, Hadam Neck - Groundwater Protection - Data Collection Questionnaire + (Hadam Neck - Groundwater Protection - Data Collection Questionnaire)
- CY-13-025, Hadam Neck, Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report + (Hadam Neck, Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report)
- CY-09-013, Haddam - 10 CFR 71 Quality Assurance Program for Radioactive Material Packages + (Haddam - 10 CFR 71 Quality Assurance Program for Radioactive Material Packages)
- PMNS20251147, Hadron Energy Inc. Public Meeting to on Microreactor Fuel Qualification. Meeting Canceled Due to Government Shutdown! + (Hadron Energy Inc. Public Meeting to on Microreactor Fuel Qualification. Meeting Canceled Due to Government Shutdown!)
- ML25182A305 + (Hadron Energy, Inc., First Amended Hadron Energy Microreactor Pre-Application Regulatory Engagement Plan)
- ML25287A168 + (Hadron Energy, Inc., Resubmittal of Quality Assurance Program Description (Topical Report), Revision 1)
- ML25129A055 + (Hadron Energy, Inc., Submittal of Microreactor Pre-Application Regulatory Engagement Plan for Standardized Microreactor Design)
- ML25262A219 + (Hadron Energy, Inc., Submittal of Quality Assurance Program Description (Topical Report), Revision 0)
- ML25098A192 + (Hadron Energy, Letter of Intent to Begin Pre-application Processes with the NRC)
- ML20236C229 + (Hafnium Rod Cluster Control Assembly Issues)
- ML22140A331 + (Hahna-hv-th27-r1)
- ML22145A343 + (Hahna-th27-bio)
- ML19007A261 + (Hai Hydrogeologic Investigation Report - January 2015)
- ML19007A034 + (Hai LACBWR Site Investigation Work Plan)
- ML053270498 + (Hairline Crack in IPEC Unit 2 Spent Fuel Pool South Wall)
- ML053270500 + (Hairline Crack in IPEC Unit 2 Spent Fuel Pool South Wall, Revision 1)
- ML090550415 + (Hairline Crack in IPEC Unit 2 Spent Fuel Pool South Wall, Revision 4)
- ML053270506 + (Hairline Crack in IPEC Unit 2 Spent Fuel Pool South Wall, Revision 4)
- ML20063N893 + (Haks Material Testing Group Notice of Expiration of License 06-31405-01)
- ML21048A253 + (Halco Lighting Technologies, LLC, NRC Form 591M Part 1, Inspection Report No. 03038350/2021001)
- ML24053A201 + (Halden - NRC Hf Remote Operations Workshop - 1-31-2024)
- ML18059A479 + (Half Bead Welding for Mods to TE-0101 & TE-0102)
- 05000254/FIN-2018001-03 + (Half Scram Due to Low Voltage on 24/48 Vdc System)
- ENS 42967 + (Half Scram Signal Due to Equipment Failure)
- ENS 41878 + (Half Scram on Voltage Regulator Failure)
- ML20263B808 + (Half Super Tiger - Exterior Shell. Sheet 1 of 2)