Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212G509 + (Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6))
- ML18152B338 + (Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls)
- ML20198A825 + (Forwards in Univ of Pa,Docket 7100889,QA Program for Shipment of 239 Plutonium-Beryllium Neutron Sources in Model DOT 6M Packaging)
- ML18031A189 + (Forwards in-depth Archaeological Survey of Transmission Corrider)
- ML17138A670 + (Forwards in-depth Archaeological Survey of Transmission Corrider)
- ML20198C463 + (Forwards in-ofc Insp Rept 50-344/91-16 on 910506-16.No Deviations or Violations Identified.Several Proposed Changes That Were Not Consistent W/Industry Stds Identified)
- ML18017A474 + (Forwards in-place Test Fill Program & Requests Approval by 790201 So Const of Separating Dike Will Not Be Adversely Impacted)
- ML18003A387 + (Forwards in-place Test Fill Program & Requests Approval by 790201 So Const of Separating Dike Will Not Be Adversely Impacted)
- ML20024A322 + (Forwards in-process OL Amend Requests Currently Being Evaluated by Nrc,In Response to Final Rules,Effective 830506,specifying That When Licensees Request Amend to OL, Licensee Must Notify Appropriate State Designee)
- ML20137T729 + (Forwards in-progress Audit of Dcrdr for Facilities, Presenting Results of NRC Review.Staff Evaluation So Far Indicates Util Conducting Comprehensive Human Factors Review to Satisfy Requirements of NUREG-0737)
- ML19326A023 + (Forwards ins Rept 44-2-288 Re Investigation of Irregularities in Fabrication of Steam Generators.W/O Encl. QA Insp Rept 999-42/72-01 Documentation Encl)
- ML20024H933 + (Forwards inter-agency Agreement Between Aid & NRC Re $5 Million Dollars to Implement 1993 Nis Nuclear Safety Initiative)
- ML20099L353 + (Forwards intervenor-appellant Petition for Leave to File Reply to NRC Response to Petition for Review Re Util Application for OL on Appeal from ALAB-785.W/o Encls. Related Correspondence)
- ML20004B699 + (Forwards intervenors,Christa-Maria,Mills & Bier Request for Continuance of Proceeding Until After 810722 & Intervenors 810518 Response to Licensee Application for Issuance of Deposition Subpoena)
- ML19261B974 + (Forwards item-by-item Assessment of Resolvability of Open Items in NRC Staff Review.Requests Resumption of NRC-DOE Safety Review & Technical Interchange Activities)
- ML20214W681 + (Forwards item-by-item Comments on NRC Comments at 840828-29 Idcor/Nrc Meeting 3B Re Integrated Analysis of Plant Response)
- ML20083N298 + (Forwards item-by-item Description of Responses to NRC 821028 Conference Call Request for Info Re Compliance w/NUREG-0612, Section 3.1, General Provisions for Load Handling, Requirements)
- ML20023B285 + (Forwards item-by-item Description of Responses Discussed During 821027 Telcon W/F Clemenson Re Technical Evaluation Rept, Control of Heavy Loads - NUREG-0654, for Facility)
- ML20137N767 + (Forwards item-by-item Response to Comments in Procedures Generation Package Draft SER & Rev 2 to Administrative Order AO-4-7, Procedure Generation Package for Emergency Operating Procedures.)
- ML20137N762 + (Forwards item-by-item Response to Comments in Procedures Generation Package Draft SER & Rev 2 to Administrative Order AO-4-7, Procedure Generation Package for Emergency Operating Procedures)
- ML20114D511 + (Forwards k-infinity Vs Temp Discrepancy Callaway Region 2 Critility Analysis,In Response to NRC RAI Re Rev to TS 3/4.9.12,per 920804 Telcon)
- ML20035F008 + (Forwards line-by-line Description of Changes in Amend 88 to Fsar,Submitted on 930416)
- TXX-9328, Forwards line-by-line Description of Changes in Amend 89 to FSAR + (Forwards line-by-line Description of Changes in Amend 89 to FSAR)
- ML20210J607 + (Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2)
- ML20199K133 + (Forwards line-by-line Descriptions of Changes in Amend 95 to Updated Fsar,Submitted on 980202.Amend 95 Included Revs to Plant Process Flow Diagrams Which Replace Certain FSAR Figures as Described in Amend 94,dtd 960801)
- TXX-9223, Forwards line-by-line Descriptions of Changes in Amend 85 to FSAR + (Forwards line-by-line Descriptions of Changes in Amend 85 to FSAR)
- ML20065L072 + (Forwards line-by-line Descriptions of Changes to Amend 80 to FSAR)
- ML20066L470 + (Forwards location-specific Radiation Dose Calculation for GE Series 200 Electric Penetrations Requested at 821105 Meeting.Calculations Submitted Per Ser,Item 9, Environ Qualification)
- ML20140D640 + (Forwards long-range CRGR Agenda for Dec 1984 - Dec 1985 for Comment.Agenda Will Be Updated Every 6 Months.Input Will Be Solicited in May 1985)
- ML20195G326 + (Forwards long-range CRGR Agenda for Period Through Dec 1988. Review of Agenda Items Scheduled for CRGR Consideration by End of CY88 Requested by 870821.Criteria for Review Listed)
- ML20036A878 + (Forwards long-range Planning Program Semiannual Update of Integrated Schedule ABC Project Listing,Consisting of Changes Made Since Last Submittal Forwarded by)
- ML20078G993 + (Forwards long-range Planning Program semi-annual Update of Integrated Schedule ABC Project Listing)
- ML20246J159 + (Forwards long-range Planning Program, Integrated Schedule Update for ABC Project Listing)
- ML20207K534 + (Forwards long-term Action Plan & Evaluation of Performance of Static O-Ring Differential Pressure Switches,Per Jg Keppler to C Reed Authorizing Unit 1 Restart)
- ML20003A041 + (Forwards long-term Evaluation Criteria for Scram Discharge Vol Sys,Per Util 801027 Commitment & IE Bulletin 80-17. Clarifications of Applicability & Results of Evaluation Encl.Corrective Actions to Be Implemented by 810501)
- ML19260A579 + (Forwards long-term Sys Info,In Response to Bulletins & Orders Task Force Requests for Addl Info for NRC Generic Rept on Bwrs.Response Will Be Incorporated Into Later Revision to NEDO-24708)
- ML20209H965 + (Forwards long-term Test Data from Static O-Ring (Sor) Differential Pressure Switches Held at Pressure on Test Rig at Sor Inc as of 870414)
- ML20238A280 + (Forwards long-term Test Data from Static O-Ring Differential Pressure Switches Held at Pressure on Test Rig at Sor,Inc. Next Setpoint Readings Scheduled to Be Taken in Approx 1 Month.Data Current as of 870803)
- ML19308C337 + (Forwards man-machine Behavioral Flow Pattern Diagram)
- ML19308C358 + (Forwards man-machine Issues Input from Mhb Technical Associates & Lockheed Missiles & Space Co,Including EPRI ,Mhb ,Jl Seminara 790827 Outline, & EPRI & Lockheed Rept Re Communications Needs of Operator)
- ML18039A379 + (Forwards mark-up Comments on Draft SE & Proposed License Conditions for Relocated TS & SR Implementation,In Response to NRC .Comments Are Primarily Recommended Changes for Clarification of SE)
- ML20248F588 + (Forwards mark-up Copy of Final Rule That Would Amend 10CFR35,by Adding palladium-103 as Sealed Source in Seeds to List of Brachytherapy Sources Permitted for Use in Treatment of Cancer)
- LD-95-006, Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc + (Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc)
- ML20198H238 + (Forwards mark-up Reflecting OGC Comments on Draft Ltr to Congressman Taylor.Without Encl)
- ML19329A575 + (Forwards mark-up of Accident Assessment Section for Fes. W/O Encl)
- ML20102B435 + (Forwards mark-up of Advanced BWR Ssar,Addressing 920323-27 Piping Audit Concerns & Microfiche for Three Analyses of Srvdl Wetwell Portion for Adqj Load Using Time Steps 0.0035, 0.001 & 0.0005 S.W/O Microfiche)
- ML19332G634 + (Forwards mark-up of Draft Lessons Learned Memo Per Request)
- ML20217P458 + (Forwards mark-up of Latest Emergency Plan Illustrating Desired Changes,Justification for Each Change,Clean Copy of Table 5-1 & Description of Actual Implementation Plans If Proposed)
- ML20101G640 + (Forwards mark-up of Nbs P&ID,mark-up of Table 3.2-1,pages 3.2-12.4 & 3.2-9 & Section 3 of Nn Newmark Paper Re Earthquake-Resistant Design G Ehlert Discussed.W/One Oversize Drawing)
- ML20082E691 + (Forwards mark-up of Page 6-7 of Ts,Replacing Page in Encl 3 of Ltr LCV-0549)
- ML20034B681 + (Forwards mark-up of Proposed Mod 2 to Doe/Nrc Mou,Per & 900409 Telefax)