Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards States Regulatory Checklist for Uravan RAP & Consent Decree". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20204C900  + (Forwards Statement to Congress on NRC Actions Being Taken Re Gao Recommendation on Floating Nuc Pwr Plants)
  • ML20235M908  + (Forwards Statement to Go w/690328 Meeting Rept Re Role of Probabilistic Analysis in Reactor Safety Evaluation)
  • ML20234C807  + (Forwards Statements & Articles Re Proposed Nuclear Power Reactors in State of California)
  • ML20133C050  + (Forwards Statements Justifying Sole Source Change to Binder, Elster,Mendelson & Wheeler,Inc Contract for Review.Method to Extend Contract for 1 Yr Preferred)
  • ML20234E401  + (Forwards Statements Prepared by PG&E for 640504 News Conference on Results of Trip to State of Ak to Compare Earthquake Effects W/Those Expected at Bodega Head.W/O News Clips)
  • ML20234F051  + (Forwards Statements Prepared for PG&E 640506 News Conference Re Results of Util Trip to Alaska to Compare Earthquake Effects W/Those Which Might Be Expected at Bodega Head)
  • ML19256F448  + (Forwards Statements Presented to Philippine Commission on Nuclear Reactor Plants)
  • ML20091P025  + (Forwards Statements by Former Zack Employees Re Past & Present Const Activities,For Use in Special Insp.W/O Encl)
  • ML19206A943  + (Forwards Statements by Security Personnel Re Security Problems at Nuclear Plants.Requests Investigation of Problem)
  • ML20039E154  + (Forwards Statements from Principal Facility Design & QA Project Managers Verifying Design Control Practices utilized.Twenty-eight Audits Have Been Performed on Ae & NSSS Vendor.No Open Items Remain)
  • ML20155B894  + (Forwards Statements of Issues Contained in 880323 Memo, Followed by Resolution or Required Action Agreed Upon at 880429 Meeting Re Implementation of Revised 10CFR35)
  • ML19331B278  + (Forwards Statements of Lj Finnegan,Dj Seeburger & L Gysel,& Disputes Accuracy of L Holcomb Cost Total.Certificate of Svc Encl)
  • ML19331B279  + (Forwards Statements of Lj Finnegan,Dj Seeburger & L Gysel,& Disputes Accuracy of L Holcomb Cost Total.Certificate of Svc Encl)
  • ML20027E705  + (Forwards Statements of Matl Fact as to Which There Is No Dispute Re Univ 820901 Motion for Summary Disposition,Per ASLB 821022 Order)
  • ML19327A776  + (Forwards Statements of Personal Qualifications of Listed Individuals in Support of Application for Renewal of Operator License.W/O Encl)
  • ML20062K670  + (Forwards Statements of Qualifications for Applicant Intended Witnesses as Identified in Supplemental Discovery Response. Certificate of Svc Encl)
  • ML19276G310  + (Forwards Statements of Qualifications of Dh Sterrett,Sb Hager,Ht Snead & RW Bostian as Experts Intending to Testify for Applicant in Answer to NRDC Interrogatories)
  • ML20056B612  + (Forwards Statements of Receipt of Amends 1,2,3,4 & 5 to Monticello Nuclear Generating Plant Application for Const Permit & License)
  • ML20058L452  + (Forwards Statements of Receipt of Amends 6 & 7 to Util Application for Const Permit & License)
  • ML20138B997  + (Forwards Statements of Work for FINs A-6819 (Project 2), A-6821 (Project 2) & A-0802 Re Evaluation of Selected Open NRC Items at Plant for Review & Comment)
  • ML19332E500  + (Forwards Statements of Work,Monthly Business Ltrs & Supporting Documentation for Invoice 1246,per 890706 Request.W/O Encls)
  • ML20039F808  + (Forwards Staten Island Chamber of Commerce Statement Re Facility Shutdown,To Be Included in Official Record)
  • ML20148R460  + (Forwards States Closing Statement to the Comm in the Matter of Amend to 10CFR51)
  • ML20148R465  + (Forwards States Closing Statement to the Comm in the Matter of Amend to 10CFR51)
  • NUREG-0455, Forwards States Final Site Environ Statement(NUREG-0455). W/Out Encl  + (Forwards States Final Site Environ Statement(NUREG-0455). W/Out Encl)
  • ML20199M046  + (Forwards States Regulatory Checklist for Uravan RAP & Consent Decree)
  • ML20126L808  + (Forwards States of Il & Wi Proposed Corrective Actions for Deficiencies Noted in Final Rept on Plant 850306 Offsite Radiological Emergency Preparedness Exercise.Corrective Actions Appropriate Subj to Listed Conditions)
  • ML20083F123  + (Forwards States of La & Ms Radiological Emergency Response Plans.Plans Have Been Submitted to FEMA for Review.W/O Encl)
  • ML20094D947  + (Forwards States of Nc & Sc Responses to Regional Assistance Committee Findings on Offsite Radiological Emergency Response Preparedness & Exercise on 840215-16.State & Local Emergency Plans Adequate)
  • ML20095B014  + (Forwards States of Nh & Ma Portions of 1992 Exercise Scenario.Encl Withheld Until Completion of Exercise)
  • ML20210P502  + (Forwards States of Wa & Sc Rejections of NRC Recommendation to Accept Bitumen Waste Forms to Meet Stability Requirements.Nrc Analysis to Determine Backfill Efficiency Required to Avoid Large Scale Movement Initiated)
  • ML20210P483  + (Forwards States of Wa & Sc Responses Questioning NRC Rationale for Recommending Acceptance of Associated Technologies,Inc Bitumen Solidified Waste While Topical Rept Under Review,Per 851204 Request)
  • ML20127F492  + (Forwards States/Tribes Monthly Status Rept for Apr 1985. Remedial Action Const Progressing Well at Both Canonsburg & Salt Lake City & Will Be in Full Swing at Shiprock in June 1985)
  • ML20155E921  + (Forwards States/Tribes Monthly Status Rept for Feb 1986. Work Continued at Burrell Vicinity Property.Shiprock Site Ahead of Schedule.Salt Lake City Const Shut Down for Winter. Coordination Meeting Should Be Scheduled for mid-summer)
  • ML20154Q193  + (Forwards States/Tribes Rept for Oct 1987 to May 1988 & Final Agenda for 880606-08 Meetings.Agenda Developed to Include Many Important Topics of Current Pertinence to Umtra Project Site)
  • ML20215F457  + (Forwards States/Tribes Status Rept for Oct 1986 - Apr 1987, Tentative Agenda for Doe/States/Tribes 870729-31 Project Coordination Meeting in Sparks,Nv & Umtra Brochure on Present Condition of Lakeview,Or Site)
  • ML19322B963  + (Forwards Statesville,Nc City Resolution to Withdraw from Proceedings)
  • ML20155B503  + (Forwards Statewide Exclusionary Screening Rept:Executive Summary. Info on Rept Will Be Available at Series of Public Meetings That Commission Has Scheduled in October at Listed Locations)
  • ML20207Q037  + (Forwards Static O-Ring long-term Test Data for Model 103AS- B212 Switches as Followup to .Model 212 Switches Held at 1,000 Psig & Cycled at Different Intervals to Monitor Variances in Trip Actuations from Calibr Settings)
  • ML20073K344  + (Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program)
  • ML19270G057  + (Forwards Stating Specs for Monitor Well,In Response to Request for Info Re Sealing of Wolf Park Mine Shaft & Monitor Well.Also Forwards Re Seepage Reduction from Impoundment,Resulting from Tailings Removal)
  • ML20050B593  + (Forwards Station & Corporate Emergency Organization Exercise Objectives)
  • AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid  + (Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid)
  • ML20134L879  + (Forwards Station Blackout Evaluation Rept & Program for Compliance W/Tmi Action Plan Item I.G.1,`Training During Low Power Testing,' Per Generic Ltr 83-24,TMI Action Plan Item I.G.1,NUREG-0737 & SER (NUREG-0853))
  • ML20134L876  + (Forwards Station Blackout Evaluation Rept & Program for Compliance W/Tmi Action Plan Item I.G.1,`Training During Low Power Testing, Per Generic Ltr 83-24,TMI Action Plan Item I.G.1,NUREG-0737 & SER (NUREG-0853))
  • ML20245A601  + (Forwards Station Blackout Evaluation Results,Per 10CFR50.63. New Section Added Requiring LWRs to Be Able to Withstand & Recover from Blackout of Specific Duration)
  • ML19350E212  + (Forwards Station Blackout Rept, in Response to 810225 Generic Ltr 81-04 Re Emergency Procedures & Training for Station Blackout Events.Extension of Implementation Schedule Per NUREG-0737 Emergency Procedures Requested)
  • ML19350E213  + (Forwards Station Blackout Rept, in Response to 810225 Generic Ltr 81-04 Re Emergency Procedures & Training for Station Blackout Events.Extension of Implementation Schedule Per NUREG-0737 Emergency Procedures Requested)
  • ML20080B266  + (Forwards Station Blackout Test:Objectives & Outline, in Response to Generic Ltr 83-24 on Testing Associated W/ Unresolved Safety Issue A-44, Station Blackout)
  • ML19250B955  + (Forwards Station Electric Distribution Sys Voltage Analysis, in Response to 790808 Request Re IE Info Notice 79-04.Addl Info Re Offsite Power Supply Failures to Be Submitted in Response to 790925 Request)
  • ML19250B956  + (Forwards Station Electric Distribution Sys Voltage Analysis, in Response to 790808 Request Re IE Info Notice 79-04.Addl Info Re Offsite Power Supply Failures to Be Submitted in Response to 790925 Request)