Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SNRC-1057, Forwards Seismic Survivability Study for MP-45 Diesel Generators + (Forwards Seismic Survivability Study for MP-45 Diesel Generators)
- ML19276E057 + (Forwards Seismic Test Procedure for Diablo Canyon Fan Cooler Motor Controller)
- ML20062J349 + (Forwards Seismic Test of Diesel Generator Control Console: Xal 71696 - SD 3025, in Response to NRC 780522 Request for Addl Info Re Seismic Qualification of Fairbanks Morse Static Exciter Cabinets.Related Ltr Encl)
- ML20010C415 + (Forwards Seismic Update Info Per NRC Request.Info Will Be Incorporated Into FSAR in Next Revision)
- ML20234E898 + (Forwards Seismicity & Tsunami Rept,Per Request.Amends 8 & 9 Available in Pdr.W/O Encls)
- ML20235B318 + (Forwards Seismicity & Tsunami Repts on Bodega Head,Ca,Dtd Oct 1964 Prepared by Dept of Commerce,Coast & Geodetic Survey.Related Info Encl.W/O Repts)
- ML20118D327 + (Forwards Seismicity Evaluation for Malibu,Ca Area & Evaluation of Technical Info in Support of Application for Construction Permit & License for Malibu Power Plant)
- ML19323A118 + (Forwards Seismicity of Livermore Valley in Relation to GE Vallecitos Plant, & Responses to Questions & Comments Raised at ACRS 791114 Getr Subcommittee Meeting.Info Noncontroversial & Does Not Alter GE Position)
- ML20215E353 + (Forwards Seismicity of Northern California & Western Nevada & Seismic History of San Francisco Region)
- ML19329C477 + (Forwards Seismological & Geological Review of Vols 1,2 & 3 of Psar.Partial List of Comments Submitted w/691028 Ltr.Addl Questions May Be Generated in Future)
- ML19329C478 + (Forwards Seismological & Geological Review of Vols 1,2 & 3 of Psar.Partial List of Comments Submitted w/691028 Ltr.Addl Questions May Be Generated in Future)
- ML20199A125 + (Forwards Select General Licensee Info to Be Made Available to Public,Per 10CFR31.5 or 10CFR31.7.W/o Encl)
- ML17342B185 + (Forwards Select Sys Assessment Progress Summary & Performance Enhancement Program Schedule Change for Jan 1988.Completion Date of Performance Enhancement Program Which Involves Relocation of Equipment Extended to 880229)
- L-88-409, Forwards Select Sys Assessment Progress Summary for Aug 1988,per 860812 Order + (Forwards Select Sys Assessment Progress Summary for Aug 1988,per 860812 Order)
- ML17347B595 + (Forwards Select Sys Assessment Progress Summary for Jan 1990.RHR Valve 887 Replacement Scheduled for Completion During Next Unit 4 Refueling Outage.Breaker List Scheduled to Be Completed by 910122)
- L-90-137, Forwards Select Sys Assessment Progress Summary for Mar 1990,per 860812 Order + (Forwards Select Sys Assessment Progress Summary for Mar 1990,per 860812 Order)
- L-88-308, Forwards Select Sys Assessment Progress Summary for June 1988,per NRC 860812 Order + (Forwards Select Sys Assessment Progress Summary for June 1988,per NRC 860812 Order)
- ML17347B006 + (Forwards Select Sys Assessment Progress Summary for Feb 1988,per NRC 860812 Order)
- L-89-419, Forwards Select Sys Assessment Progress Summary for Oct 1989,per 860812 Order + (Forwards Select Sys Assessment Progress Summary for Oct 1989,per 860812 Order)
- L-88-442, Forwards Select Sys Assessment Progress Summary for Sept 1988,per NRC 860812 Order,Covering Design Basis Recommendation & Walkdowns + (Forwards Select Sys Assessment Progress Summary for Sept 1988,per NRC 860812 Order,Covering Design Basis Recommendation & Walkdowns)
- L-88-230, Forwards Select Sys Assessment Progress Summary Rept for Apr 1988 + (Forwards Select Sys Assessment Progress Summary Rept for Apr 1988)
- L-87-387, Forwards Select Sys Assessment Progress Summary for Aug 1987 + (Forwards Select Sys Assessment Progress Summary for Aug 1987)
- ML17347B528 + (Forwards Select Sys Assessment Progress Summary for Dec 1989 for Plant)
- L-88-178, Forwards Select Sys Assessment Progress Summary for Mar 1988 + (Forwards Select Sys Assessment Progress Summary for Mar 1988)
- L-87-460, Forwards Select Sys Assessment Progress Summary for Oct 1987 + (Forwards Select Sys Assessment Progress Summary for Oct 1987)
- L-88-502, Forwards Select Sys Assessment Progress Summary for Oct 1988 + (Forwards Select Sys Assessment Progress Summary for Oct 1988)
- ML20053D533 + (Forwards Selected Comments Received as of 610725 on Commission Proposed Site Criteria.W/O Encl)
- W3P81-1757, Forwards Selected Comments of Federal & State Agencies on Des,In Response to NRC + (Forwards Selected Comments of Federal & State Agencies on Des,In Response to NRC)
- ML20236K254 + (Forwards Selected Documents,Per Recent Telcon,Re Commercial Low Level Waste Burial Facility at Maxey Flats,Ky.Selected Documents Needed by NRC Review Group.W/O Encls)
- ML19344A694 + (Forwards Selected Drawings & Documents Originally Sent in Util Re Independent Confirmatory Piping Analysis, in Response to Requesting More Legible Drawings. Revised Index of Drawings Encl)
- ML20248A797 + (Forwards Selected Environ Monitoring Repts Submitted to Various NRC Regional Ofcs,Per Request.Level of Detail & Individual Approaches of Repts Differ,But Each Rept Satisfies Commission Basic Reporting Requirements.W/O Repts)
- ML20024H117 + (Forwards Selected Licensee Commitments Manual,Per 10CFR50.4 & 50.71)
- ML19316B606 + (Forwards Selected NRC Products - High Level Waste Program, Dtd Nov 1987.Necessary Matls Should Be Ordered.Comments on Preliminary Draft Operations Plan for Geologic Setting for Yrs 1 & 2 Transmitted Under Separate Cover)
- ML19316B608 + (Forwards Selected NRC Products - High Level Waste Program, Dtd Nov 1987)
- ML20206Q663 + (Forwards Selected NRC Products High Level Waste Program)
- ML20214N739 + (Forwards Selected NRC Products,High Level Waste Program)
- ML20214J431 + (Forwards Selected NRC Products--High Level Waste Program, for Info)
- ML20039H186 + (Forwards Selected Pages from Safety Evaluation Rept Indicating Westinghouse Resolution of Cold Shutdown Issue at Pda Stage)
- ML20092N682 + (Forwards Selected Pages of GE Rept 22A2615 Re Recirculation & RHR Weld Joint Insp Program for 1984 Refueling Outage,Per ,In Response to NRC Telcon Request)
- ML20132A361 + (Forwards Selected Papers in Hydrologic Sciences,1985, Dealing W/Usgs Studies Performed at Unc Recovery Sys Site)
- ML18057A756 + (Forwards Selected Performance Indicator Trend Graphs for Jan 1989 - Dec 1990,per 890725 Telcon)
- ML20127B889 + (Forwards Selected Section of Chapter 6, ESF of SSAR for Advanced Bwr,Consisting of Nonproprietary 11x17 Foldout Drawings of Standby Gas Treatment Sys)
- ML20127B931 + (Forwards Selected Sections of Chapter 1,introduction & General Description of Plant,Chapter 3,design of Structures, Components & Sys,Consisting of Amend 24 to GE Advanced BWR SSAR)
- ML20091H406 + (Forwards Selected Sections of Chapter 9, Auxiliary Sys & Chapter 18, Human Factors Engineering of SSAR for Advanced Bwr,Amend 19,including Update of Control Bldg Fire Protection Drawings.Encl Withheld)
- ML20211J452 + (Forwards Selected design-related 10CFR50.55(e) Items.Related Deficiency Repts Also Encl.Related Correspondence)
- LD-92-051, Forwards Selection of Control Motion for ABB-C-E Sys 80+ Std Design. Rept Identifies & Discusses Hypothetical Rock Outcrop Spectrum & Control Motions + (Forwards Selection of Control Motion for ABB-C-E Sys 80+ Std Design. Rept Identifies & Discusses Hypothetical Rock Outcrop Spectrum & Control Motions)
- ML20008G332 + (Forwards Selection of Permanent Hydrogen Mitigation Sys for Sequoyah Nuclear Plant)
- ML20008G333 + (Forwards Selection of Permanent Hydrogen Mitigation Sys for Sequoyah Nuclear Plant.)
- ML18038A277 + (Forwards Self Appraisal Team Final Rept. Per Commitment in 870604 Ltr.Rept Indicates That Operating & Support Personnel Conscientious & Knowledgeable & Capable of Operating Facility in Safe & Reliable Manner)
- ML18038A276 + (Forwards Self Appraisal Team Final Rept. Per Commitment in .Rept Indicates That Operating & Support Personnel Conscientious & Knowledgeable & Capable of Operating Facility in Safe & Reliable Manner)
- ML20134M413 + (Forwards Self Assessment Guide Program Guidelines, Providing Guidance to Allow NRC to Evaluate Licensee self- Assessment Effort as Alternative to NRC Full Scope Engineering Insp)