Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-31695, Forwards Revs to River Bend Station Emergency Plan,Resulting from Corrective Actions from 890301 Emergency Perparedness Exercise & Routine Review + (Forwards Revs to River Bend Station Emergency Plan,Resulting from Corrective Actions from 890301 Emergency Perparedness Exercise & Routine Review)
- ML20198E038 + (Forwards Revs to SAR for AP-300 Shipping Container Submitted W/Application for Certificate of Compliance.Revs Resolve Questions Raised During Telcon W/R Odegarden)
- ML20133G360 + (Forwards Revs to SAR for AP-300 Shipping Container Submitted W/Application for Certificate of Compliance.Revs Include Calculations Showing That Shell of Cask Can Withstand Stresses Imposed by G Loads)
- ML20247C757 + (Forwards Revs to SNM Control Program for SEFOR Decladding Under License SNM-21,Suppl 4 to AI-74-44, SNM Control Program for SEFOR Fuel Decladding, for Info.Matl Control Not Decreased by Revs.Encl Withheld)
- ML20101G595 + (Forwards Revs to SSAR Addressing SECY-91-153 Outstanding Issues 4,8 & 9 Re Envelope of Advanced BWR Std Plant Site Design Parameters,Wind & Tornado Loadings & Structures,Sys & Components to Be Protected from External Missiles)
- ML20113C969 + (Forwards Revs to Safeguards Contingency Plan.Revs Withheld (Ref 10CFR2.790 & 73.21))
- ML20136C342 + (Forwards Revs to Safeguards Contingency Plan,Consisting of Nov 1985 Page Changes,Per NRC .Revs Withheld (Ref 10CFR73.21 & 2.790))
- ML20096F420 + (Forwards Revs to Safeguards Security Personnel Training & Qualification Plan,Per 10CFR50.54.Revs Withheld (Ref 10CFR2.790 & 73.21))
- ML20235T709 + (Forwards Revs to Safeteam Program Instructions,Including Rev 2 to ST-01, Interview Process (Appreciation Ctr), Rev 3 to ST-02, Classification of Concerns & Rev 2 to ST-03, Class 1 Concern Investigation Process)
- ML18092B297 + (Forwards Revs to Salem Generating Station Inservice Testing Program (Pumps & Valves), for Units 1 & 2.Revs Result of Extensive Review of Sys Components Required to Place & Maintain Reactors in Shutdown Condition)
- ML18092B298 + (Forwards Revs to Salem Generating Station Inservice Testing Program (Pumps & Valves), for Units 1 & 2.Revs Result of Extensive Review of Sys Components Required to Place & Maintain Reactors in Shutdown Condition)
- ML20096E689 + (Forwards Revs to Section 1.8 of FSAR QA Program. Section Last Submitted to NRC on 950407 & Subsequently Accepted in NRC Ltr)
- ML20217J509 + (Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs)
- ML20045G734 + (Forwards Revs to Section 5.0 of Ts,Previously Submitted,Per Discussions W/Nrc Re Main Control Room Staffing)
- ML20195C513 + (Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27)
- ML20046B924 + (Forwards Revs to Sections 7 & 8 of SAR for Model 3206B,3227B & 2118 Shipping Packages,Incorporating Info Requested in NRC)
- ML20069E352 + (Forwards Revs to Security & Safeguards Contingency Plans. Revs Withheld (Ref 10CFR73.21))
- ML20078B542 + (Forwards Revs to Security & Safeguards Contingency Plans. Revs Withheld (Ref 10CFR73.21))
- ML20155H980 + (Forwards Revs to Security & Training & Qualification Plans. Revs Withheld (Ref 10CFR73.21))
- ML20116B458 + (Forwards Revs to Security Personnel Training & Qualification Plan.Revs Reflect Changes Based on Discussion W/Nrc.Revs Withheld (Ref 10CFR73.21 & 2.790).Related Correspondence)
- ML20072M956 + (Forwards Revs to Security Plan & Safeguards Contingency Plan.Revs Withheld (Ref 10CFR73.21))
- ML20081B959 + (Forwards Revs to Security Plan & Training & Qualification Plan.Encls Withheld (Ref 10CFR73.21))
- ML20096B275 + (Forwards Revs to Security Plan Addressing Comments Included in .Revs Withheld (Ref 10CFR73.21))
- ML20203F730 + (Forwards Revs to Security Plan Sections 1.2,1.3,1.4,2.1,2.5, 2,6,2.8,6.1,6.4,6.5,B-3.0,B-4.0,B-5.0 & Figure R Dtd 990210. Evaluation & Description of Plan Revs Also Encl to Assist in NRC Review.Encls Withheld)
- L-93-020, Forwards Revs to Security Plan for Pbaps,Units 1 & 2,per 10CFR50.54(p).Plan Withheld + (Forwards Revs to Security Plan for Pbaps,Units 1 & 2,per 10CFR50.54(p).Plan Withheld)
- L-96-024, Forwards Revs to Security Plan for Pbnp.Encl Withheld + (Forwards Revs to Security Plan for Pbnp.Encl Withheld)
- ML20214H720 + (Forwards Revs to Security Plan,In Response to Miscellaneous Amends Concerning Physical Protection of Nuclear Power Plants. Revs Will Be Implemented within 180 Days of NRC Approval.Encls Withheld (Ref 10CFR73.21))
- ML20149H982 + (Forwards Revs to Security Plan,Including Corporate Organization Chart,Written Correspondence from State of Ny Police & Apps Index.Revs Withheld (10CFR73.21))
- L-95-023, Forwards Revs to Security Plan.Revs Withheld + (Forwards Revs to Security Plan.Revs Withheld)
- ML20081C927 + (Forwards Revs to Security Plan.Revs Withheld (Ref 10CFR73.21))
- ML20090J740 + (Forwards Revs to Security Plan.Revs Withheld (Ref 10CFR73.21))
- ML20204F479 + (Forwards Revs to Security Plan.Revs Withheld (Ref 10CFR73.21))
- ML20106H440 + (Forwards Revs to Security Program.Revs Withheld (Ref 10CFR73.21))
- ML20129D989 + (Forwards Revs to Security Program.Revs Withheld (Ref 10CFR73.21))
- ML20128K048 + (Forwards Revs to Security Program.Revs Withheld (Ref 10CFR73.21))
- ST-HL-AE-1213, Forwards Revs to Security,Safeguards Contingency & Security Personnel Training & Qualification Plans & Responses to NRC 850205 Comments on Security Plan.Revs & Comments Withheld (Ref 10CFR73.21) + (Forwards Revs to Security,Safeguards Contingency & Security Personnel Training & Qualification Plans & Responses to NRC 850205 Comments on Security Plan.Revs & Comments Withheld (Ref 10CFR73.21))
- ML20154J341 + (Forwards Revs to Security,Training & Qualification & Contingency Plans.Revs Withheld (Ref 10CFR2.790(d)))
- ML20127J514 + (Forwards Revs to Selected Licensee Commitments Manual.Slc Manual Is Chapter 16 to FSAR & Will Be Updated on as Needed Basis)
- ML20073H409 + (Forwards Revs to Selected Licensee Commitments Manual, Including List of Effective Pages)
- ML20094L054 + (Forwards Revs to Selected Licensee Commitments Manual, Consisting of Chapter 16.0 of Fsar.Manual Will Be Updated Monthly,As Needed)
- ML20070C239 + (Forwards Revs to Selected Licensee Commitments Manual)
- ML20059E768 + (Forwards Revs to Semiannual Effluent Rept for Jan-June 1990)
- ML20078N853 + (Forwards Revs to Semiannual Radioactive Release Repts, 1981 & 1982)
- 0CAN019006, Forwards Revs to Semiannual Radiological Effluent Release Repts for 1987-89 + (Forwards Revs to Semiannual Radiological Effluent Release Repts for 1987-89)
- ML20006D257 + (Forwards Revs to Semiannual Radiological Effluent Release Repts for 1987-89)
- ML17289A736 + (Forwards Revs to Sept 1991 & Apr 1992 Monthly Operating Repts for WNP-2)
- GO2-92-155, Forwards Revs to Sept 1991 & Apr 1992 Monthly Operating Repts for WNP-2 + (Forwards Revs to Sept 1991 & Apr 1992 Monthly Operating Repts for WNP-2)
- ML20213F293 + (Forwards Revs to Severe Accident Policy Statement,Per Request in 850405 Staff Requirements Memo Re SECY-84-370 on NUREG-1070 Concerning Policy on Future Designs)
- ML20217H483 + (Forwards Revs to Shiprock Remedial Action Insp Plan (Raip), Including Revs 0 to RAIP-1, Organization, Rev 0 to RAIP-2, Testing & Insp, Rev 0 to RAIP-3, Qualification & Certificate of Insp & Test Personnel & Rev 0 to RAIP-4)
- ML20101G427 + (Forwards Revs to Ssar,Addressing Outstanding Issues 4,8 & 9 in SECY-91-153.Reactor Bldg Superstructure & Roof Will Have to Be Thickened & Roof Purlins Strengthened)
- RBG-21-510, Forwards Revs to Station Operating Procedures,Including ADM-0022, Conduct of Operations, AOP-0001, Reactor Scram & GOP-0007, Scram Recovery, in Response to Re Generic Ltr 83-28 + (Forwards Revs to Station Operating Procedures,Including ADM-0022, Conduct of Operations, AOP-0001, Reactor Scram & GOP-0007, Scram Recovery, in Response to Re Generic Ltr 83-28)