Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101G516 + (Forwards Rev 29 to Modified Amended Security Plan.Rev Addresses Several Changes Made Possible by Rulemaking Effective 951010.Rev Withheld)
- ML20097H789 + (Forwards Rev 29 to North Anna Power Station,Units 1 & 2 Physical Security Plan Per 10CFR50.54(p)(2).Plan Withheld Per 10CFR73.21)
- ML15217A127 + (Forwards Rev 29 to Odcm,Oconee Nuclear Station, Rev 30 to Odcm,Catawba Nuclear Station & Rev 31 to Odcm,Mcguire Nuclear Station)
- ML20114C604 + (Forwards Rev 29 to Palisades Security Plan to Reflect Reorganization of Plant Staff & Change in Weapons in Use at Plant.Rev Withheld (Ref 10CFR73.21(c)))
- B16593, Forwards Rev 29 to Physical Security Plan Per 10CFR50.54(p). Plan Withheld + (Forwards Rev 29 to Physical Security Plan Per 10CFR50.54(p). Plan Withheld)
- ML20217Q053 + (Forwards Rev 29 to Physical Security Plan & Rev 11 of Safeguards Contingency Plan.Revs Withheld,Per 10CFR73.21)
- ML20209H247 + (Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21)
- ML20205K609 + (Forwards Rev 29 to Physical Security Plan.Summary of Changes,Encl.Plan Withheld from Public Disclosure Per 10CFR73.21)
- ML20072R916 + (Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Plan Withheld (Ref 10CFR2.790(a)(3)))
- GO2-96-003, Forwards Rev 29 to Physical Security Plan.Encl Withheld + (Forwards Rev 29 to Physical Security Plan.Encl Withheld)
- ML20044A067 + (Forwards Rev 29 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20099F342 + (Forwards Rev 29 to Physical Security/Contingency Plan & Instructions for Updating NRC Copies 6 Through 11.Encls Withheld (Ref 10CFR73.21))
- ML20005E177 + (Forwards Rev 29 to Plant Security Plan.Rev Reflects Administrative Changes in Plant Mgt Structure.Encl Withheld (Ref 10CFR73.21))
- ML20106J362 + (Forwards Rev 29 to Plant Security Plan.Rev Withheld,Per 10CFR73.21)
- ML20086D482 + (Forwards Rev 29 to Radiological Emergency Response Plan & Rev 8 to EPP 02-1.1)
- L-95-342, Forwards Rev 29 to Radiological Emergency Plan for St Lucie Plant. Attachment 1 Contains Listing of Pages W/Description of Changes Made to Plan + (Forwards Rev 29 to Radiological Emergency Plan for St Lucie Plant. Attachment 1 Contains Listing of Pages W/Description of Changes Made to Plan)
- ML20086L566 + (Forwards Rev 29 to SAR,MITNE-115.Rev Deletes Fabrication Tolerances on Fuel Dimensions to Indicate Dimensions Nominal)
- ML18151A393 + (Forwards Rev 29 to SPS Units 1 & 2 Updated Fsar.Rev Updates Chapter 17,which Contains Operational QA Program & All Changes to Chapter 17 Since Last Update.W/Instructions, Summary & List of Effective Pages)
- PLA-5010, Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 + (Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50)
- ML20127N206 + (Forwards Rev 29 to Safeguards Plan,Reflecting Changes to Util Organizational Structure & Corresponding Position Titles.Rev Withheld (Ref 10CFR73.21))
- ML20154H933 + (Forwards Rev 29 to Seabrook Station Radiological Emergency Plan & Rev 80 to Seabrook Station Emergency Response Manual. Changes Submitted Per Requirements of 10CFR50.47(b) & 10CFR50,App E)
- ML20214W326 + (Forwards Rev 29 to Security Plan,Addressing Recent Amends to 10CFR73.55,for Review & Approval.Rev Withheld (Ref 10CFR73.21))
- ML20058N185 + (Forwards Rev 29 to Security Plan,Incorporating New Nuclear Security Facility,Expanded Perimeter & Interim Perimeter to Support DG Project.Encl Withheld)
- ML20086R737 + (Forwards Rev 29 to Security Plan,Rev 12 to Safeguards Contingency Plan & Rev 15 to Training & Qualification Plan. Encls Withheld (Ref 10CFR73.21))
- ML20116M296 + (Forwards Rev 29 to Security Plan.Rev Deletes Obsolete & Redundant Commitments & Statements as Appropriate & Addresses NUREG-0908 Acceptance Criteria.Rev Withheld (Ref 10CFR73.21))
- ML20247H421 + (Forwards Rev 29 to Security Plan.Rev Withheld)
- ML20090H737 + (Forwards Rev 29 to Security Plan.Rev Withheld (Ref 10CFR73. 21))
- ML20005E175 + (Forwards Rev 29 to Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML19325F086 + (Forwards Rev 29 to Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20094H536 + (Forwards Rev 29 to Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20154Q994 + (Forwards Rev 29 to Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20012C766 + (Forwards Rev 29 to Security Program.Rev Withheld (Ref 10CFR73.21))
- HNP-97-003, Forwards Rev 29 to Shearon Harris Nuclear Power Plant Emergency Plan Including Changes to (PLP-201) + (Forwards Rev 29 to Shearon Harris Nuclear Power Plant Emergency Plan Including Changes to (PLP-201))
- AECM-84-0286, Forwards Rev 29 to Tech Spec Problem Sheets.Rev Transmitted Specifically as Update + (Forwards Rev 29 to Tech Spec Problem Sheets.Rev Transmitted Specifically as Update)
- ML20045C246 + (Forwards Rev 29 to Three Mile Island Nuclear Station,Units 1 & 2 Physical Security Plan,Per 10CFR50.54(p).Plan Withheld)
- ML17349A256 + (Forwards Rev 29 to Topical QA Rept, Including Summary of Changes Made to Topical Rept Since 910610 & Marked Up Version of Topical QA Rept Last & Current Submittal)
- L-92-165, Forwards Rev 29 to Topical QA Rept, Including Summary of Changes Made to Topical Rept Since 910610 & Marked Up Version of Topical QA Rept Last & Current Submittal + (Forwards Rev 29 to Topical QA Rept, Including Summary of Changes Made to Topical Rept Since 910610 & Marked Up Version of Topical QA Rept Last & Current Submittal)
- ML20096H037 + (Forwards Rev 29 to UFSAR for North Anna Power Station Units 1 & 2 Rev 29 to Updated Amend 5 to Topical Rept VEP-1-5A, Operational QA Program)
- ML20209C404 + (Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl)
- ML20114D633 + (Forwards Rev 29,Suppl 1 to Physical Security/Contingency Plan to Provide Clarifications & to Include Info on Complete Security Upgrade Project Rather than Just Phase I.Encl Withheld (Ref 10CFR73.21))
- ML20093G347 + (Forwards Rev 29A to Procedure FNP-0-EIP-8, Notification Roster. W/Jm Felton 840717 Memo)
- ML20035B438 + (Forwards Rev 29A to Security Plan.Due to Magnitude of Change & Creation of New Implementing Procedures,Implementation Will Not Take Place Until 60 Days After NRC Acceptance.Rev Withheld,Per 10CFR73.21)
- ML20056E181 + (Forwards Rev 29B to Security Plan,Per 10CFR50.54(p).Change Responds to Areas of NRC Comment of Rev 29A,as Well as Items Identified During Insp Repts 50-282/93-13 & 50-306/93-13. Only Revised Pages Submitted.Pages Withheld,Per 10CFR73.21)
- ML20203K105 + (Forwards Rev 2A to Remedial Action Insp Plan MK-F-UMTRA-28, Testing & Insp, for Ambrosia Lake,Nm,For Review & Concurrence)
- NOC-AE-0053, Forwards Rev 2A to Safeguards Contingency Plan.Rev Withheld, Per 10CFR50.54(p)(2) + (Forwards Rev 2A to Safeguards Contingency Plan.Rev Withheld, Per 10CFR50.54(p)(2))
- ML20011D854 + (Forwards Rev 2A to TN-24 Dry Storage Cask Topical Rept & Application for Withholding Proprietary Portions.Rept Describes Std Cask for Storage of Spent Fuel at Isfsi. Proprietary Portions of Rev 2A Withheld)
- ML20195C652 + (Forwards Rev 2A to Topical SAR for NAC Storage/Transport Cask for Use at ISFSI, Vols 1 & 2 & Proprietary Section to Rept)
- ML17279A623 + (Forwards Rev 2A to WNP 1,2 10-Mile EPZ Evacuation Time Assessment Study)
- ML17279A624 + (Forwards Rev 2A to Wnp 1,2 10-Mile EPZ Evacuation Time Assessment Study.)
- ML20077A485 + (Forwards Rev 2B & Rev 3 to Updated FSAR for Beaver Valley Power Station,Unit 2,consisting of Replacement Text,Tables & Figures)
- ML20072U040 + (Forwards Rev 3 Response to IE Bulletin 79-14,Rev 1,Suppl 2. Forty-eight safety-related Pipe Supports Remain to Be Inspected.Seventeen Pipe Supports Containing Expansion Anchor Bolts Remain to Be Inspected Per IE Bulletin 79-02)
- ML20133E646 + (Forwards Rev 3 for Figure a of Security Plan for Point Beach Dtd 970103.Plan Withheld)
- ET-NRC-93-3947, Forwards Rev 3 of AP600 Design & Design Certification Test Program Overview. Westinghouse Currently Plan to Provide Updates of Document on Monthly Basis.Bulk of Matl Previously Supplied to NRC & Has Been Discussed During Meetings + (Forwards Rev 3 of AP600 Design & Design Certification Test Program Overview. Westinghouse Currently Plan to Provide Updates of Document on Monthly Basis.Bulk of Matl Previously Supplied to NRC & Has Been Discussed During Meetings)
- ML20216J068 + (Forwards Rev 3 of AP600 Design Control Document, Incorporating Documentation Changes Resulting from Final Review Performed to Check Consistency of Implementation of Approved Design Change Proposals.With Summary of Changes)