Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133K475 + (Forwards Response to Final Draft SER Confirmatory Issue 34 Re Assurance That Control Sys Failure Would Not Result in Event More Severe than Design Basis Event Described in Fsar. Confirmatory Issue Should Be Closed)
- ML18017B931 + (Forwards Response to Final Environ Rept Review Questions. Hydrologic Engineering Branch Questions 240.1 Through 240.10 Will Be Addressed in Conjunction W/Questions Resulting from 820406-07 Hydrologic Site Visit)
- ML18017B932 + (Forwards Response to Final Environ Rept Review Questions. Hydrologic Engineering Branch Questions 240.1 Through 240.10 Will Be Addressed in Conjunction W/Questions Resulting from 820406-07 Hydrologic Site Visit)
- ML20155G804 + (Forwards Response to Final Rept of Regulatory Effectiveness Review,Per Transmitted by Varga .Finding 2.2.6 Will Be Addressed by Separate Correspondence.Encl Withheld (Ref 10CFR73.21))
- ML20245A534 + (Forwards Response to Final Rulemaking Re Station Blackout)
- AECM-89-0074, Forwards Response to Final Station Blackout Rule, 10CFR50.63.Util Will Implement Procedure Mods Identified within 180 Days of Notification by Director of Nrr.Fee Paid + (Forwards Response to Final Station Blackout Rule, 10CFR50.63.Util Will Implement Procedure Mods Identified within 180 Days of Notification by Director of Nrr.Fee Paid)
- ML20045H253 + (Forwards Response to Findings & Recommendations Presented in Official Trtr Peer Review Rept on Univ of Virgina 930428 Console Event.External Organization of Reactor Facility Not Well Suited to Univ of Virginia)
- L-82-415, Forwards Response to Findings Identified in 820831-0901 Audit of Electrical Area + (Forwards Response to Findings Identified in 820831-0901 Audit of Electrical Area)
- ML17256A903 + (Forwards Response to Findings Listed in Section 1.4 of NUREG-0909, NRC Task Force Rept on 820125 Steam Generator Tube Rupture at Ginna Nuclear Power Plant, Per NRC)
- TXX-4232, Forwards Response to Findings in Section IV of BNL Interim Rept on Protective Coatings,Per NRC .No Safety Concerns W/Protective Coatings at Facility.Backfit Program Properly Conceived & Implemented + (Forwards Response to Findings in Section IV of BNL Interim Rept on Protective Coatings,Per NRC .No Safety Concerns W/Protective Coatings at Facility.Backfit Program Properly Conceived & Implemented)
- ML20117K395 + (Forwards Response to Fire Protection Draft SER Open Items FP-4 & FP-5 Re Safe Shutdown & Alternate Shutdown Capabilities,Respectively.Requests Meeting W/Auxiliary Sys Branch During Wk of 850520 to Discuss Responses)
- ML20236D092 + (Forwards Response to Fire Protection Open Items,Per Request During 870730 Meeting W/Nrc Re Fire Protection Program, Including Safety Evaluations for Mods 2085 & 2079)
- ML20037C334 + (Forwards Response to Fire Protection Program Open Item Re Procedures to Flush Sprinkler Sys Dead Legs Following Partial Actuation)
- L-81-433, Forwards Response to Fire Protection Questions,Revision to Various 440 Series Questions & Revised FSAR Chapter 15, in Response to NRC Request for Addl Info.Responses Will Be Incorporated in Future FSAR Amend + (Forwards Response to Fire Protection Questions,Revision to Various 440 Series Questions & Revised FSAR Chapter 15, in Response to NRC Request for Addl Info.Responses Will Be Incorporated in Future FSAR Amend)
- ML19326C506 + (Forwards Response to Fire Protection Questions 3C & 39, Completing Response to All NRC Questions Received So Far)
- L-88-295, Forwards Response to First Concern Noted in NRC Bulletin 88-004, Potential Safety-Related Pump Loss Re Potential for dead-heading of Pumps Under Stated Conditions.Schedule for Completion of Second Concern Expected by 881101 + (Forwards Response to First Concern Noted in NRC Bulletin 88-004, Potential Safety-Related Pump Loss Re Potential for dead-heading of Pumps Under Stated Conditions.Schedule for Completion of Second Concern Expected by 881101)
- ML18089A528 + (Forwards Response to First Quarterly Rept of Nuclear Oversight Committee Transmitted to NRC on 840126.Set of Performance Indicators Using INPO Recommendations & Info from Other Utils Developed)
- ML19262A103 + (Forwards Response to First Round Questions Re NEDO-20566-2, Revision 1, GE Analytic Model for LOCA Analysis in Accordance W/10CFR50 App K,Amend 2 - One Recirculation Loop Out of Svc)
- ML19276G545 + (Forwards Response to First Round of Interrogatories Submitted by Tx Pirg)
- L-91-145, Forwards Response to Fitness for Duty Concerns Conducted by Util Nuclear Security Dept.Encl Withheld + (Forwards Response to Fitness for Duty Concerns Conducted by Util Nuclear Security Dept.Encl Withheld)
- ML18017C023 + (Forwards Response to Five Environ Rept Review Questions Re Blowdown Discharge Structure,Design Curve for Natural Draft Cooling Towers Model & Input Data Used to Calculate Isotherms.Updated NPDES Permit Encl)
- ML20138R239 + (Forwards Response to Five Open Items Identified in Technical Evaluation Rept on Util Response to Generic Ltr 82-33 Re Implementation of Rev 2 to Reg Guide 1.97 Concerning Emergency Response Capability)
- 3F0197-06, Forwards Response to Five Questions Generated by Contractor, Inel,During Review of & Relief Request 95-050, Rev 1 Which Incorporates Addl Info Associated W/Inel Questions,Per 10CFR50.55a(g)(5)(ii) + (Forwards Response to Five Questions Generated by Contractor, Inel,During Review of & Relief Request 95-050, Rev 1 Which Incorporates Addl Info Associated W/Inel Questions,Per 10CFR50.55a(g)(5)(ii))
- AECM-83-0146, Forwards Response to Five of Six Items Contained in Re Util Work Addressing Containment Issues.Evaluation of Condensation Oscillation Loads Produced by Discharges from RHR HX Relief Valve Will Be Completed by Late Apr + (Forwards Response to Five of Six Items Contained in Re Util Work Addressing Containment Issues.Evaluation of Condensation Oscillation Loads Produced by Discharges from RHR HX Relief Valve Will Be Completed by Late Apr)
- ML19207B277 + (Forwards Response to Fj Long Re IE Insp Repts 50-259/78-09,50-260/78-09 & 50-296//78-09.No Discrepancy in Time.Qa Records Are in Temporary Storage)
- RC-95-0076, Forwards Response to Follow Up Request for Addl Info Re GL 92-08 + (Forwards Response to Follow Up Request for Addl Info Re GL 92-08)
- NSD-NRC-97-5435, Forwards Response to Followon Question Re AP600 SSAR Section 14.3 & AP600 Insps,Tests,Analyses & Acceptance Criteria.W Status Column Will Be Changed to Closed in Open Item Tracking Sys + (Forwards Response to Followon Question Re AP600 SSAR Section 14.3 & AP600 Insps,Tests,Analyses & Acceptance Criteria.W Status Column Will Be Changed to Closed in Open Item Tracking Sys)
- NSD-NRC-97-5443, Forwards Response to Followon Questions Re AP600 SSAR Section 14.2 on AP600 Initial Test Program.W Status Column Will Be Changed to Closed in Open Item Tracking Sys for Items 2642 & 2646 + (Forwards Response to Followon Questions Re AP600 SSAR Section 14.2 on AP600 Initial Test Program.W Status Column Will Be Changed to Closed in Open Item Tracking Sys for Items 2642 & 2646)
- L-91-126, Forwards Response to Followup Item 12 from NRC Audit Rept 50-251/89-203 Re Qualification of Concrete Pedestals for Replacement Component Cooling Water Hxs.Results of Revised Analyses Indicate That Piping/Support Sys Acceptable + (Forwards Response to Followup Item 12 from NRC Audit Rept 50-251/89-203 Re Qualification of Concrete Pedestals for Replacement Component Cooling Water Hxs.Results of Revised Analyses Indicate That Piping/Support Sys Acceptable)
- ST-HL-AE-4140, Forwards Response to Followup Item in Insp Repts 50-498/92-06 & 50-499/92-06 on 920224-28.Corrective Actions: Actuators Not Specifically Covered by Either up-rating Program Will Be Reset Per Original Limitorque Rating + (Forwards Response to Followup Item in Insp Repts 50-498/92-06 & 50-499/92-06 on 920224-28.Corrective Actions: Actuators Not Specifically Covered by Either up-rating Program Will Be Reset Per Original Limitorque Rating)
- ML20088A873 + (Forwards Response to Followup Items from Pump & Valve Operability Review Team Audit on 840313-16.Valve 1/NF/234A Qualified for Operation at -10 F)
- ML20081J516 + (Forwards Response to Followup Questions Re GL 92-08, Thermo-Lag 330-1 Fire Barriers)
- ML20087L451 + (Forwards Response to Followup Questions from 840209 Meeting Re Environ Qualification of DG Obrian Electrical Penetrations.Tests Verify Adequacy of Type K Module for Plant Applications)
- PY-CEI-NRR-1926, Forwards Response to Followup RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers + (Forwards Response to Followup RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers)
- ML20082C673 + (Forwards Response to Followup to Request for Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers)
- AECM-81-364, Forwards Response to Formal NRC Review Comments on Physical Security Plan & Revised Plan.Comments & Plan Withheld (Ref 10CFR2.790) + (Forwards Response to Formal NRC Review Comments on Physical Security Plan & Revised Plan.Comments & Plan Withheld (Ref 10CFR2.790))
- W3P81-1466, Forwards Response to Formal Question 231.21 & SER Open Item 50 Which Appears in Draft SER Section 4.2.2 + (Forwards Response to Formal Question 231.21 & SER Open Item 50 Which Appears in Draft SER Section 4.2.2)
- ML20052B401 + (Forwards Response to Formal Relicense Review Questions. Amended Portions of SAR & Tech Specs Will Be Sent as Soon as Possible)
- ML20082K853 + (Forwards Response to Forwarding IE Bulletin 83-06 Nonconforming Matls Supplied by Tube-Line Corp. Tube-Line Supplied Matl Installed in Unit 3 Auxiliary Feedwater Sys)
- ML20072B876 + (Forwards Response to Forwarding IE Insp Rept 50-322/83-08 & App B Addressing Notice of Deviation Re IE Bulletin 80-06, ESF Reset Controls)
- ML17345A613 + (Forwards Response to Forwarding Ltr from D Hammondtree Requesting Info Re Effects of Plant on Environ & Alternative Power Sources)
- ML20215N212 + (Forwards Response to Forwarding Notice of Violation & Proposed Imposition of Civil Penalty.Util Agrees That Violation Occurred & Will Forward Payment of Proposed Fine Under Separate Cover)
- ML19344E766 + (Forwards Response to Forwarding Rc Gray Questions on Condition of Reactor Core & Vulnerability of Equipment & Instrumentation in Facility Reactor Bldg)
- ML20076G443 + (Forwards Response to Forwarding SALP for Dec 1981 - Nov 1982 Conducted on 830124.Response Covers Four Areas Assessed as Category II & One Area Assessed as Category III)
- ML20024E565 + (Forwards Response to Four Emergency Plan Items Identified in App D to Jg Keppler Re Ltrs of Agreement W/Local Authorities,Emergency Action Level Guidelines,Evacuation Time Estimates & Training for Onsite & Offsite Groups)
- ML20148R559 + (Forwards Response to Four General Observations Omitted from 871229 Response to Integrated Design Insp.Summary of Response for Each of Four General Observations Provided)
- ML20052G189 + (Forwards Response to Four NRC Questions Re 800805 Proposed Tech Specs for Single Loop Operation & Updated Tech Spec Pages)
- ML20147G458 + (Forwards Response to Four Questions Raised During Region II 1996 USNRC Training Managers Conference)
- ML18012A589 + (Forwards Response to Four Questions Raised During Region II USNRC Training Managers Conference)
- ML20215N663 + (Forwards Response to Four Questions Re Fast Neutron Fluence for Reactor Vessel,Per NRC 860826 Request)
- ML20113E083 + (Forwards Response to Four Questions Re Saturation Margin Monitor Loop Error Analysis,Per NRC 840928 Request.Analysis Demonstrates Max Loop Error in Positive Direction of 14.95 F.Instrument Loop Diagrams Also Encl)