Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19257B846 + (Forwards NRC Draft Evaluation of SEP Topic III-8.C, Irradiation Damage,Use of Sensitized Stainless Steel & Fatigue Resistance. Requests Response within 30 Days)
- ML19210D759 + (Forwards NRC Draft Evaluation of SEP Topic III-8.C, Irradiation Damage,Use of Sensitized Stainless Steel & Fatigue Resistance. Response Requested)
- ML18044A294 + (Forwards NRC Draft Evaluation of SEP Topic III-8.C, Irradiation Damage,Use of Sensitized Stainless Steel & Fatigue Resistance. Response Requested)
- ML13333A436 + (Forwards NRC Draft Evaluation of SEP Topic III-8.C, Irradiation Damage,Use of Sensitized Stainless Steel & Fatigue Resistance. Response Requested)
- ML17249A300 + (Forwards NRC Draft Evaluation of SEP Topic III-8.C, Irradiation Damsge,Use of Sensitized Stainless Steel & Fatigue Resistance. Response Requested)
- ML20052D451 + (Forwards NRC Draft Evaluation of SEP Topic III-7.B, Design Codes,Design Criteria & Loading Combinations for Facility & Draft SEP Structural Review of Oyster Creek Drywell Containment Structure Under Combined Loads)
- ML19210D732 + (Forwards NRC Draft Evaluation of SEP Topic III-8.C, Irradiation Damage,Use of Sensitized Stainless Steel & Fatigue Resistance. Requests Response)
- ML20011E831 + (Forwards NRC Draft Finding of No Significant Antitrust Changes for Unit,For Review & Comment.W/O Encl)
- ML20012B974 + (Forwards NRC Draft General License Study for Review & Comment.Comments Requested by 890331)
- ML19326B912 + (Forwards NRC Draft Guidance for Proposed OL Amends Re Refueling & Refueling Info Request in Effort to Improve Efficacy & Scheduling)
- ML18045A391 + (Forwards NRC Draft Interim Technical Evaluation Rept on Equipment Environ Qualification. Rept Will Be Used as Input for Safety Assessment for Topic III-12.Request Comments by 800630.W/o Encl)
- ML19224C396 + (Forwards NRC Draft Ltr & Fr Notice Re Resumption of Operation of Facility)
- ML20125C824 + (Forwards NRC Draft Ltr Written to All Utils Re Importance Attached to Obtaining Timely & Complete Info on ATWS Alternatives.Requests Comments on Ltrs)
- ML20237J699 + (Forwards NRC Draft STS for four-loop Westinghouse Plants & Should Be Considered by Util in Developing plant-specific Tech Specs for Facility,Per 870805 Meeting.Final Tech Specs Will Be Issued W/Ol)
- ML17309A212 + (Forwards NRC Draft Safety Evaluation of SEP Topic III-1 & Technical Evaluation Rept, Quality Group Classification of Components & Sys. Schedule for Providing Addl Info to Be Determined During Integrated Safety Assessment)
- ML19220B774 + (Forwards NRC Draft Suppl to Fes for Operation of TMI Nuclear Station,Dtd July 1976.W/o Encl)
- ML20215N262 + (Forwards NRC Draft Tech Specs for Unit 1.Document Will Be Subj of 861117 Site Visit to Develop Tech Specs Reflecting FSAR, as-built Plant & Completed Staff Evaluations)
- ML20247D766 + (Forwards NRC Draft Technical Position on Monitoring Health Effects in Vicinity of Low Level Waste Disposal Facilities & Natl Cancer Inst Study Protocol W/Refs Re Monitoring of Vicinity Health Effects,For Info.W/O Encls)
- ML20206L953 + (Forwards NRC Editorial Corrections to Transcript of 990324 Hearing Before Committee on Energy & Natural Resources on Nuclear Waste Storage & Disposal Policy,Including S.608, Nuclear Waste Policy Act of 1999)
- ML20211B070 + (Forwards NRC Editorial Corrections to Transcript of 990721 Hearing Before Subcommittee on Energy & Power on HR 2531, NRC Authorization Act for Fiscal Year 2000)
- ML20209B314 + (Forwards NRC Eight Comments & Addendum Re Disposition on TSTF-052,Rev 1.These Comments Were Provided to & Discussed with B Ford,Former BWR Owners Group Chairman at 981215 Focus Group Meeting,Than Suppl in to NEI)
- ML20087D188 + (Forwards NRC Emergency Preparedness Appraisal Items Status Tracking Rept, to Aid NRC in Preparations for Upcoming Appraisal.Emergency Preparedness Planning Project Organization Chart & List of Responsibilities Also Encl)
- ML20199A123 + (Forwards NRC Emergency Preparedness Insp Rept 50-440/97-17 on 971103-07 & 971215-18.No Violations Identified.During Insp Observation of Activities Showed EP Program to Be Effectively Implemented.Staff Reduction Will Be Monitored)
- ML17340A840 + (Forwards NRC Enforcement Action Against Util for Item of Noncompliance Noted in IE Insp on 810129 & Warns Against Future Demonstrations of Poor Judgment)
- ML18044B015 + (Forwards NRC Enforcement Action Against Cpc,Notifying Licensees That Enforcement Authority Limits Will Be Exercised to Obtain Safer Operation of Licensed Facilities. Enforcement Program Is Preventive Safety Force)
- ML20199D498 + (Forwards NRC Enforcement Conference Rept 70-1151/97-207 on 971029)
- ML20128F023 + (Forwards NRC Enforcement Package for Kewaunee & Util Enforcement Conference Presentation for Review.Revised Enforcement Provision to Mitigate Penalties Based on Good Performance Should Be Incentive for Excellence.W/O Encls)
- ML20059N121 + (Forwards NRC Enforcement Policy & Fr Notice Re Proposed Rule Concerning Actions Against Nonlicensees Causing Violations of NRC Requirements Through Willful Acts)
- ML20002A649 + (Forwards NRC Enforcement Policy - Public Meetings for Transmittal to Ofc of Fr for Publication)
- ML20140H816 + (Forwards NRC Enforcement Policy,Table of 1983 Proposed Civil Penalties,Including Licensees,Amounts Proposed & Amounts Imposed or Paid,Suppls to Enforcement Policy Authorizing Penalties & Four Vols of NUREG-0940.W/o NUREG-0940)
- ML20154F010 + (Forwards NRC Environ Assessment & Notices of Environ Assessment Re Proposed Const & Operation of Facilities.W/O Encls)
- ML19312E009 + (Forwards NRC Environ Review Schedule for Proposed Fuel Fabrication Plant in Response to Request.Nrc Anticipates Issuing Des by 800818 & Fes by 810324)
- ML20129J746 + (Forwards NRC Evaluated Emergency Preparedness Exercise Insp Rept 50-443/96-07.No Violations Noted)
- ML20129J748 + (Forwards NRC Evaluated Emergency Preparedness Exercise Insp Rept 50-443/96-07.No Violations Noted)
- ML20206D189 + (Forwards NRC Evaluation & Proposed Resolution for License Renewal Issue 98-0016, Aging Management Review of Fuses. Staff Plans to Implement Recommended Resolution as Part of Next Rev to Standard Review Plan for License Renewal)
- ML16343A545 + (Forwards NRC Evaluation Rept & Contractor Technical Evaluation Rept Re Util 940627 Submittal on Plant Individual Plant Exam of External Events,Per GL 88-20,GSIs 131,103,147, 148 & 172 & USI A-45)
- ML17347A811 + (Forwards NRC Evaluation Rept of Independent Mgt Appraisal for Turkey Point Plant, for Info & Action Per 880419 Memo.Forwarding of Subj Rept to Licensee & PDR W/Request for Recommendations Requested)
- ML19319C073 + (Forwards NRC Evaluation Results for BAW-10029, Control Rod Drive Mechanism Test Program)
- NUREG-0969, Forwards NRC Evaluation Team Rept (NUREG-0969) Re Onsite Hardware Evaluation Conducted 830124-0304.W/o Encl + (Forwards NRC Evaluation Team Rept (NUREG-0969) Re Onsite Hardware Evaluation Conducted 830124-0304.W/o Encl)
- ML20010C162 + (Forwards NRC Evaluation for SEP Topics II-4, Geology & Seismology & II-4.B, Proximity of Capable Tectonic Structures in Plant Activity. Evaluation Will Be Basic Input to Integrated Safety Assessment for Facility)
- ML18046A796 + (Forwards NRC Evaluation for SEP Topics II-4, Geology & Seismology & II-4.B, Proximity of Capable Tectonic Structures in Plant Vicinity. Evaluation Will Be Basic Input to Integrated Safety Assessment for Facility)
- ML14184A686 + (Forwards NRC Evaluation of 790423,0628,0712 & 0823 Responses to IE Bulletins 79-06A & 79-06A,Revision 1. Appropriate Actions to Bulletin Requirements Have Been Taken)
- ML17340A092 + (Forwards NRC Evaluation of 790424,0504,0604,18 & 25 Responses to IE Bulletins 79-06A & 79-06A,Revision 1. Licensee Demonstrated Correct Interpretation of Bulletin Requirements)
- ML20053A420 + (Forwards NRC Evaluation of 810820 & 820120 Changes to Security Plan.Some Changes Unacceptable.Encl Withheld (Ref 10CFR2.790))
- ML20235E912 + (Forwards NRC Evaluation of ACRS Consultant Rept on BWR Protection Sys Performance,Per 731129 Request.Group Withdrawal,Faster Startup & Diverse & Faster Scram Addressed.Details of Higher Insertion Rates Not Received)
- ML19309B769 + (Forwards NRC Evaluation of Actions Taken to Satisfy Category a Requirements of TMI-2 Lessons Learned.All Category a Requirements Have Been Met Satisfactorily W/Exception of Item 2.1.7a for Unit 2)
- ML17250A451 + (Forwards NRC Evaluation of Apr 1980 Steam Generator Insp Results.Agrees That Plant Should Return to Power After Insp & Concurs W/Proposed mid-cycle Insp.Insp Program & Comments Should Be Submitted 40 Days Prior to Scheduled Shutdown)
- ML19317G831 + (Forwards NRC Evaluation of B&W Generic Rept, B&W Operating Experience of Reactor Internals Vent Valves. Valves Will Remain Closed During Normal Operation)
- ML19319C078 + (Forwards NRC Evaluation of BAW-10007,Revision 1 (Proprietary) & BAW-10029 (Nonproprietary), Control Rod Drive Mechanism Test Program. BAW-10029 Acceptable as Ref in Lieu of BAW-10007)
- ML20009G788 + (Forwards NRC Evaluation of BWR Owners Group Response to TMI Action Plan Item II.K.3.46, Michelson Concerns. Response Acceptable.Item II.K.3.46 Complete for Facility)
- ML20009G350 + (Forwards NRC Evaluation of BWR Owners Group Response to TMI Action Plan Item II.K.3.46, Michelson Concerns. Response Acceptable.Item II.K.3.46 Complete for Facility.W/O Encl)