Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards List of Nrc/Agreement State Working Groups,For Info". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20138A051  + (Forwards List of NRC Prof Hours & Contractual Costs for Completed Review of Rev 2 to XN-NF-81-21, Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel)
  • ML19242D684  + (Forwards List of NRC Region 2 Personnel for Whom Permanent non-employee,no Escort Required Badges Are Requested. Requests Site Orientation Re Issuance of Badges,Escort Duties & Emergency Evacuation)
  • ML19249A322  + (Forwards List of NRC Region 3 Personnel for Whom Permanent, Nonemployee,No Escort Badges Are Requested.Also Requests Site Orientation Re Issuance of Badges,Escort Duties & Emergency Evacuation)
  • ML20031F189  + (Forwards List of NRC Sponsored Confirmatory Research & Technical Assistance Programs Re PWR Steam Generator Tube Integrity)
  • ML17332A228  + (Forwards List of NRC Staff & Contractor Personnel Who Will Be Participating in IPEEE Site Audit Scheduled for 940726-28)
  • ML20140J553  + (Forwards List of NRC U Recovery Facilities,Per 970430 Telcon)
  • ML20003B811  + (Forwards List of NRC Witnesses Who Will Sponsor Staff Analysis,Prof Qualifications & Sandia Natl Labs 810209 Rept)
  • ML20032C176  + (Forwards List of NUREG-0737 Items Which Will Be Deferred During Unit 3 Cycle 4 Outage.Util Is Not Able to Meet 8-h Emergency Lighting Requirement of 10CFR50,App R.Basis for Deferrals Described in)
  • ML20040H208  + (Forwards List of Names & Addresses of Persons to Whom Licensee Shipped Gunsights Containing H-3,prior to Issuance of License on 820125.List Not Encl)
  • ML20041B386  + (Forwards List of Names & Schedule,Confirming Interviews of Plant Personnel Re Investigation Into Allegations of Drug Use.Encls Withheld (Ref 10CFR2.790))
  • ML20202B701  + (Forwards List of Names of Customers in State of CA Area of Jurisdiction to Whom Veeco Instruments,Inc Shipped Fluoroderm within Last Quarter.Each Customer Notified Re Obligation to Register Radiation Producing Equipment)
  • ML20202B677  + (Forwards List of Names of Customers in State of CA Jurisdiction on Whom Upa Technology,Inc Shipped Fluoroderm within Last Quarter.Each Customer Notified About Obligation to Register Radiation Producing Equipment)
  • ML20202B657  + (Forwards List of Names of Customers in State of CA Jurisdiction to Whom Upa Technology,Inc Shipped Fluoroderm within Last Quarter.Each Customer Notified About Obligation to Register Radiation Producing Equipment)
  • ML20202B651  + (Forwards List of Names of Customers in State of CA Jurisdiction to Whom Upa Technology,Inc Shipped Fluoroderm within Last Quarter.Each Customer Notified About Obligation to Register Radiation Producing Equipment)
  • ML17332A338  + (Forwards List of Names of Personnel to Observe Insp & Maint of CRDM Nozzle Work & Requests Arrangements to Be Made for Unescorted Access for Names Listed)
  • ML20207K199  + (Forwards List of Names of Those Individuals & Their Organizational Affiliation as Appropriate,Who Spoke at Informal Public Hearing Re Petitions Filed Pursuant to 10CFR2.206 for River Bend & Perry Plants on 990222)
  • ML20235N152  + (Forwards List of Names,Addresses & Telephone Numbers of Concern Identified as Large Businesses for Purpose of Procurement & Requesting Solicitation)
  • ML20198E085  + (Forwards List of Naval Reactors Packages Which Have NRC Cocs & Packages Which Base Puncture Test Assessment on Physical Tests,For Info,Per 971020 Telcon)
  • ML20215N371  + (Forwards List of New Questions Requiring Response & Set of Questions Previously Answered by Staff Which Chairman Asked Be Reviewed for Possible Updating.Responses to Encl 1 Questions Requested by 860311.W/o Encls)
  • ML20106D034  + (Forwards List of Newly Numbered Exhibits Offered in Evidence at 841009-12 Hearing.Related Correspondence)
  • ML19274D173  + (Forwards List of News Publications Located within Vicinity of Proposed Nuclear Power Station.Provided Per Request of C Haupt)
  • ML19329C641  + (Forwards List of Newspapers Covering Toledo Edison Co & Cleveland Electric Illuminating Co Svc Areas)
  • ML20063M262  + (Forwards List of Nickel Content of Reactor Vessel Beltline Metal,Per Matls Engineering Branch 820830 Request.List Withheld (Ref 10CFR2.790))
  • ML20058E711  + (Forwards List of Nonconformance Repts Contained in Files)
  • B13087, Forwards List of Nozzles in Steam Generators & Pressurizer Subj to Thermal Fatigue Mechanisms,Per Util 881019 Addl Info Re First 10-yr Inservice Insp Program  + (Forwards List of Nozzles in Steam Generators & Pressurizer Subj to Thermal Fatigue Mechanisms,Per Util 881019 Addl Info Re First 10-yr Inservice Insp Program)
  • ML20199D247  + (Forwards List of Nrc/Agreement State Working Groups,For Info)
  • ML18022A481  + (Forwards List of Nuclear Experience on Shift to Be Used in Power Ascension Program.Info Given to NRC on 861211)
  • ML20133G276  + (Forwards List of Nuclear Meter Use at Hafb & Wsmr Which Outlines When & Where Meters Were Used During Time Periods of 1991 Through 1996)
  • ML20203K828  + (Forwards List of Nuclear Moisture Density Gauges Received on 860313 from Troxler Electronic,Inc & Gauges Transferred to Troxler Electronic,Inc on 860409)
  • ML20126B228  + (Forwards List of Nuclear Plant LERs Jan 1976-Dec 1979 & Info Re Study of Liquid Radwaste Sys Operating Problems. Investigation Insufficient to Fully Document Problems Described in .Plant Organization Charts Encl)
  • ML20129G174  + (Forwards List of Nuclear Plants w/safety-related Fire Dampers W/Electro Thermal Links,Palo Verde Horizontal Fire Damper Mod & Calculation 1101, Horizontal Spring Analysis, for Review)
  • ML19326C999  + (Forwards List of Nuclear Power Reactors Covered by 10CFR50, App D,Revised on 710924)
  • ML20033C975  + (Forwards List of Number of Shareholders & Number of Foreign Shareholders Per .Svc List Encl)
  • ML20128P226  + (Forwards List of OECD Repts Re Source Term, in Response to Request)
  • ML20141M905  + (Forwards List of OL Application Review Costs for 841223-850622,per Revised 10CFR170 Re License & Insp Fees. Amount Due Discussed)
  • A120282, Forwards List of Objectives & Guidelines for Emergency Plan Exercise  + (Forwards List of Objectives & Guidelines for Emergency Plan Exercise)
  • ML20074A543  + (Forwards List of Objectives,Scope of Participation,Scenario Outline & Narrative Summary for Emergency Exercise Scheduled for 830712)
  • ML19319B224  + (Forwards List of Omissions,Errrors &/Or Inconsistencies in Unit 1 Tech Specs to Be Corrected for All Units.Fsar Adequate.W/O Encl)
  • ML19322C386  + (Forwards List of Onduty Operators at Facility During Day of Incident Per 790606 Request)
  • ML19257B535  + (Forwards List of Ongoing TMI-related Activities in Response to NRC 790510 Memo.Also Forwards ACRS Suggesting Action to Be Taken)
  • ML20114F692  + (Forwards List of Open & Confirmatory Issues Which Should Be Included in SER Suppl 2.Schedule for Input,Review & Issuance Outlined)
  • ML20079P758  + (Forwards List of Open Const Implementation Overview Items 45,46 & 48)
  • ML20112A119  + (Forwards List of Open Issues Under Consideration for Implementation of Generic Ltr 84-08,per NRC 850213 Request. Resolution of Issues W/O Submittal to NRC for Review Under Backfit Procedure Desired)
  • ML16340B524  + (Forwards List of Open Issues for Which Util Submitted Info, But No SER Input Has Been Received.Encl 2 Identifies Issues for Which Util Must Provide Info & Expected Submittal Dates)
  • NUREG/CR-1821, Forwards List of Open Issues from Draft NUREG/CR-1821, Seismic Review of Robert E. Ginna Power Plant as Part of Sep. Addl Info Re Seismic Design Consideration & Component Integrity Should Be Submitted within 30 Days  + (Forwards List of Open Issues from Draft NUREG/CR-1821, Seismic Review of Robert E. Ginna Power Plant as Part of Sep. Addl Info Re Seismic Design Consideration & Component Integrity Should Be Submitted within 30 Days)
  • ML20040A708  + (Forwards List of Open Issues on Facilities & B-SAR-205, Requiring Resolution Prior to CP Issuance.List of Items to Be Addressed at Final Design Stage Also Encl)
  • ML20202E595  + (Forwards List of Open Items Associated W/Chapter 19 of AP600 SER)
  • ML20202E784  + (Forwards List of Open Items Associated W/Chapter 2 & 20 of AP600 SER)
  • ML20202E770  + (Forwards List of Open Items Associated W/Chapter 3 of AP600 SER)
  • ML20113D264  + (Forwards List of Open Items Associated W/Walsh/Doyle Allegations & Independent Assessment Program Phase 1,2 & 3 Reviews,Per 850110 Meeting.Summary of Conclusions Will Be Sent by 850125)
  • ML20202E831  + (Forwards List of Open Items Associated W/Chapter 20 of AP600 Ser.Open Items Involves Review of Bulletin Issued After Rev 1 to WCAP-13559, Operational Assessment for AP600 Submitted to Staff for Review)