Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Info Re Cycle 2 Reload,Per 840621 Request". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20073P319  + (Forwards Info Re Control Rod Drive Mechanism Temp,In Response to Request.No Tech Spec Temp Limit Should Be Imposed on Mechanism Since No Thermal Effect Problems Noted)
  • GO2-82-436, Forwards Info Re Control Rod Drive Sys Line Break,Missile Protection of Equipment & UHS Capabilities During Seismic Tornado Events.Info Closes Out SER Outstanding Issue 1.7(28), Pipe Break in BWR Scram Sys  + (Forwards Info Re Control Rod Drive Sys Line Break,Missile Protection of Equipment & UHS Capabilities During Seismic Tornado Events.Info Closes Out SER Outstanding Issue 1.7(28), Pipe Break in BWR Scram Sys)
  • ML19309E522  + (Forwards Info Re Control Rods Failing to Fully Insert for 1978-79,per 800110 Request)
  • ML19340F014  + (Forwards Info Re Control Room Habitability,Per NUREG-0737. Operators Are Adequately Protected Against Effects of Accidental Release of Chemicals.Facility Can Operate Safely or Shut Down Under DBA Conditions)
  • B11643, Forwards Info Re Control Room Halon Fire Suppression Sys,In Response to 850715 Request.Total Flooding of Halon Sys Will Be Installed in Facility Control Room During Next Refueling Outage,Per 10CFR50.48 Schedule  + (Forwards Info Re Control Room Halon Fire Suppression Sys,In Response to 850715 Request.Total Flooding of Halon Sys Will Be Installed in Facility Control Room During Next Refueling Outage,Per 10CFR50.48 Schedule)
  • ML18086A858  + (Forwards Info Re Control Sys,Per NRC 810416 Request. Analyses in FSAR Chapter 14 Bound Consequences of Single Control Sys Failure.Analysis of Major NSSS Control Sys Failures Will Be Completed During Fall of 1981)
  • ML18037A358  + (Forwards Info Re Control of Heavy Loads,In Response to NRC 801222 & 810203 Requests.Main Handling Sys Include Reactor Bldg Overhead Traveling Crane,Auxiliary & Overhead Hoists & Jib Crane)
  • ML18113A762  + (Forwards Info Re Cooling Water Discharge Temp Change Rate.On 781227,condenser Cooling Water Outlet Temp to James River Increased by 5.5 F & Was in Excess of Rate Permitted by Tech Specs.Caused by Closed Waterboxes)
  • ML19275A253  + (Forwards Info Re Corporate Mgt & Technical Resources Availability,In Response to NRC 790629 Request)
  • ML19242B791  + (Forwards Info Re Corporate Mgt & Technical Abilities Available to Anticipate,Preclude & Respond to Events Such as TMI-2,in Response to 790629 Request.Radiation Mgt Corp Provides Necessary Personnel to Meet Radiation Incident)
  • ML19274D307  + (Forwards Info Re Correction to License Change Application 26 to Incorporate Requirements of 10CFR50a for Pump & Valve Inservice Testing.Change Updates Inservice Insp Program by Oct 1978 & Modifies 40-month Insp Interval to 790920)
  • ML19325D138  + (Forwards Info Re Corrections of Errors & Significant Mods to Notrump Code in Small Break LOCA ECCS Evaluation Model & Assessment of Effect of Mod on Calculated Peak Cladding Temp Resulting from Analysis of Small Break LOCA)
  • W3P84-0498, Forwards Info Re Corrective Actions Identified During Control Room Design Review.Lighting Survey Results,Color Code Convention & Results of Control Room Liveability Review Encl.Lighting Mods Complete  + (Forwards Info Re Corrective Actions Identified During Control Room Design Review.Lighting Survey Results,Color Code Convention & Results of Control Room Liveability Review Encl.Lighting Mods Complete)
  • ML19322C711  + (Forwards Info Re Cost of Operator Training Course in Response to Jg Herbein Request)
  • ML20027E064  + (Forwards Info Re Cost/Benefit Study for Inadequate Core Cooling Instrumentation.Submittal Includes Both High & Low Range of Cost Info Received by Industry)
  • ML19289F660  + (Forwards Info Re Costs Associated W/Selection of Alternate Sites,As Requested in NRC .Tabulation & Summary Explanation Sheets Encl)
  • ML20062H825  + (Forwards Info Re Costs of Purchasing Energy,In Response to NRC 790921 & 1109 Requests for Info Re Significant Developments Affecting General Public Util Companies in Restart Proceeding)
  • ML18086A268  + (Forwards Info Re Costs of Replacement Energy & Capital Expense During Period of Delay While Awaiting Full Power License in Response to NRC 810327 Request)
  • ML19309G531  + (Forwards Info Re Cracked Control Rod Guide Tube Support Pins & Flexures.No Safety Issue Exists in Domestice Operating Plants)
  • ML20211L099  + (Forwards Info Re Criteria for Existence of Inverted Diffusion Flames in Drywell,Per Task 10.12 of Hydrogen Control Program Plan)
  • ML19289C788  + (Forwards Info Re Criteria in Buckling of Steel Containment Structures & NRC Evaluation of Info)
  • ML20003E682  + (Forwards Info Re Critical Sys,Structures & Components List for Facility,In Response to NRC Request.Facility Safety Parameter Display Sys & RCS Vents Will Be Included on List When Operational)
  • ML20246J060  + (Forwards Info Re Current & Planned Activities of Nuclear Equipment Procurement Working Group.Current Action Plan of Working Group,Including Schedular Milestones,Encl)
  • ML20055A275  + (Forwards Info Re Current Status of Exemption Requests for Alert & Notification Sys)
  • ML20003F099  + (Forwards Info Re Current Status of SER Open Items.Also Forwards Responses to Items III.A.1.2 & III.A.2 of NUREG-0737,including Program for Compliance W/App 2 of NUREG-0654)
  • ML19254F502  + (Forwards Info Re Cycle 5 Fuel Reload,In Response to NRC .Also Forwards Drawing of Wear Sleeve to Be Installed in Exxon-supplied Fuel.Eccs Analysis Will Be Submitted by 791201)
  • ML20247F895  + (Forwards Info Re Cycle 8/reload 7 Core Operating Limits rept,NFS-0162,rev 0 That Contains Proprietaty Info.Licensee Should Resubmit Proprietary Version of Subj Rept within 30 Days of Ltr Receipt.Encl Finding on Rept Withheld)
  • ML20150E716  + (Forwards Info Re DOS Response on Pending Lic Appl for Mitsubishi Intl Corp to Export low-enriched Uranium to Japan for OHI-2 Reload,Lic XSNM-1302.Recommends Issuance of Lic)
  • ML20135B203  + (Forwards Info Re DPO on Stockpiling Potassium Iodide)
  • ML20151B371  + (Forwards Info Re DSR-48 Crankshafts,Including Johnston to Khan & Related Matls Ref in Ltr,Per Telcon)
  • ML19289G088  + (Forwards Info Re Daily Operations Meetings 790430-0505)
  • ML20198R731  + (Forwards Info Re Dates of Completion or Expected Completion of Generic Requirements,Per NRC 860430 Request.Updated Info Will Be Available by 860610)
  • ML20010B267  + (Forwards Info Re Degree of Isolation Between Reactor Trip Sys,Engineered Safety Feature Sys & Nonsafety Control Sys,In Response to NRC Re SEP Topics VII-1.A & VII-2)
  • ML19322A243  + (Forwards Info Re Delayed Schedule for Completing Mod to Fire Protection.Work Involved in Separating Computer Room from Control Room Will Be Completed by End of 1980 Refueling Outage Rather than Previously Scheduled 1979 Outage)
  • ML20205P701  + (Forwards Info Re Demonstration Tests of Reliablilty & Inherent Safety of EBR-II Operation.Results Discussed)
  • ML20055D714  + (Forwards Info Re Descriptive Assembly of Model C-8 Type B(U) Package to Close Out Renewal Application for Certificate of Compliance 9128.Certificate Expired on 890531)
  • A01061, Forwards Info Re Design Basis Transient & Accident Conditions Providing Basis for Auxiliary Feedwater Sys Flow Requirements,In Response to NRC 791022 Request.Based on Analyses,Auxiliary Feedwater Sys Complies W/Section 1.4  + (Forwards Info Re Design Basis Transient & Accident Conditions Providing Basis for Auxiliary Feedwater Sys Flow Requirements,In Response to NRC 791022 Request.Based on Analyses,Auxiliary Feedwater Sys Complies W/Section 1.4)
  • ML20054E064  + (Forwards Info Re Design Change Which Will Aid Operator During Switchover from ECCS Injection to Recirculation.Info Will Be Incorporated Into FSAR)
  • ML20027B331  + (Forwards Info Re Design Features & Procedural Controls Related to Prevention of Waterhammer,Per NRC 820730 Request. Damage to Krsko Steam Generator & Auxiliary Feedwater Sys Discussed)
  • ML20006C395  + (Forwards Info Re Design Reconstitution Efforts,Consisting of Survey Observations Gained from Visiting Six Utils & One NSSS Vendor)
  • RBG-21820, Forwards Info Re Design of HPCS Diesel Generator Engine Mounted Piping & Components & HPCS Diesel Generator Lubrication Oil Sys Piping & Components.Sys Deemed Satisfactory to Perform Required Function  + (Forwards Info Re Design of HPCS Diesel Generator Engine Mounted Piping & Components & HPCS Diesel Generator Lubrication Oil Sys Piping & Components.Sys Deemed Satisfactory to Perform Required Function)
  • ML20106E530  + (Forwards Info Re Detailed Control Room Design Review & Response to Mar 1984 in-progress Audit,Per 841129 Commitment.Summary of Progress Since 840717 in-progress Audit Rept & Control Panel Mods Included)
  • ML20148U064  + (Forwards Info Re Detectability Threshold in Sleeve/Tube Combination,Per 860924 Commitment in Response to Issuance of Amends 98 & 88 to Licenses DPR-39 & DPR-48,respectively,on 861118.Data on Rotoprobe & Bobbin Coil Also Encl)
  • ML20211E248  + (Forwards Info Re Determining Fee Assessed for Review of Topical Repts XN-NF-85-92, Exxon Nuclear U Dioxide/ Gadolinia Irradiation Exam... & Suppl 4 to XN-75-27, Exxon Nuclear Neutronics Design Methods for Pwrs)
  • ML20202G608  + (Forwards Info Re Diagnostic Interest in Radiological Waste Control Room Panel Test Computer Point)
  • ML20202G590  + (Forwards Info Re Diagnostic Plant Control Operator (Pco) Interest in Radiological Waste Control Room Panel Test Computer Point)
  • ML20211J569  + (Forwards Info Re Diesel Generator 2B Valid Failure Due to Turbocharger Failure at McGuire Nuclear Station.No Actual Matl Sent to Switzerland for Evaluation)
  • 0CAN108102, Forwards Info Re Diesel Generator History,Per NRC 810709 Request Concerning Station Blackout  + (Forwards Info Re Diesel Generator History,Per NRC 810709 Request Concerning Station Blackout)
  • ML20082B593  + (Forwards Info Re Diesel Generator K1 Field Contractor Requested During 910510 Telcon.W/O Encl)
  • ML20202J004  + (Forwards Info Re Diesel Generators,Per Request.License Conditions,Established in Mar 1985 to Forewarn of Impending Bearing Damage,Failed to Detect Recent Failures)