Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards ASLBP Model Hearing Schedule Over 10-month Time Frame". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20211B426  + (Forwards ASLB 861223 Concluding Partial Initial Decision,Per 10CFR51.102.FES Transmitted w/)
  • ML20037A849  + (Forwards ASLB Acknowledging Receipt of Request to Make Limited Appearance & ASLB Re Incorporation of Congressional Ltr in Hearing Record.W/O Encl)
  • ML20033E624  + (Forwards ASLB Concluding Partial Initial Decision on Emergency Planning Around Facility.W/O Encl)
  • ML20028H818  + (Forwards ASLB Decision Re Adequacy of Design of Unit 2.W/o Encl)
  • ML20205E426  + (Forwards ASLB Documents Transmitted to Cygna Per to Util Re Independent Assessment Program,In Response to 850916 Request)
  • ML20023D397  + (Forwards ASLB Initial Decision 80-445-01 Sc Re Liquefaction Potential at Lacbwr.Util Neither Required to Submit Detailed Design Proposal For,Nor Make Operational,Site Dewatering Sys)
  • ML20093D534  + (Forwards ASLB Initial Decision Status Rept,Per Board 81-453-03 OL)
  • ML19329C241  + (Forwards ASLB Initial Decision Supplementing AEC 720426 Notice & Order of Evidentiary Hearing & Order Denying Motion to re-open Suspension Hearings.W/O Encl)
  • ML19329F365  + (Forwards ASLB Initial Decision in Indian Point 3 CP Proceeding & AEC to CPC Per Telcon Request.Aec Is on File in Pdr.Detailed Environ Statement Has Been Mailed to M Sinclair.W/O Encl)
  • ML20114F777  + (Forwards ASLB Initial Decision on City of Los Angeles Application for CP & Class 104 License to Construct & Operate PWR at Corral Canyon,Malibu,Ca)
  • ML19256F461  + (Forwards ASLB Memorandum Concerning Second Stipulation Re Certain Suffolk County Contentions)
  • ML16340B790  + (Forwards ASLB Notification Package)
  • ML19254B164  + (Forwards ASLB Notification Re Use of Containment Leak Chase Channels at Facility for Support of Some Category 1 Instrument Sensing Lines & Electrical Conduit.(Board Notification Is Not Included Among Encls))
  • ML19282A718  + (Forwards ASLB Opinion Re Denial of Intervention to Natl Lawyers Guild Who Refused to Identify Members.Position Parallels That of NRDC)
  • ML20236E746  + (Forwards ASLB Order & Ltr from Alleger to ASLB Chairman Re Allegations)
  • ML19206B180  + (Forwards ASLB Order Admitting Certain Contentions as Issues in Controversy.Only Contentions Set Out in Part II of Order Are Applicable.Prehearing Conference Will Be Held 770128)
  • ML20033E589  + (Forwards ASLB Order Authorizing Issuance of License Permitting Low Power Testing at Facility.W/O Encl)
  • ML19282C387  + (Forwards ASLB Order Issued Before Receipt of .Ltr Will Be Served on Other Parties to Proceeding.W/O Encl)
  • ML20033E570  + (Forwards ASLB Order Re Fuel Load & Cold Criticality Testing at Plant.W/O Encl)
  • ML19246A478  + (Forwards ASLB Orders.Arrangements Made for Inclusion on Svc List.W/O Encl)
  • ML20244B834  + (Forwards ASLB Partial Initial Decision Supporting All Geology/Seismology & Low Power Emergency Preparedness Issues.Issuance of Low Power OL Authorized.W/O Encl)
  • ML20030C396  + (Forwards ASLB Preliminary Ruling on Remaining Summary Disposition Motions & Portions of Transcript Discussing Preliminary Order.Related Correspondence)
  • ML20028D877  + (Forwards ASLB Statement in Response to 771212 Request for Comment Re Proposed Policy Statement on Camera Coverage of NRC Public Hearings.W/O Encl)
  • ML20037A852  + (Forwards ASLB to City of Gainesville Re Admittance of AP Perez Statement & Gainesvilles 680820 Response.W/O Encl)
  • ML20040D701  + (Forwards ASLB-106 Monthly Rept for Dec 1981)
  • ML20004D959  + (Forwards ASLBP Model Hearing Schedule Over 10-month Time Frame)
  • ML20237J633  + (Forwards ASME Boiler & Pressure Code Section Xi,Form NIS-1 as Encl 1 to Inservice Insp Rept.Encls 2 & 3, 1986 Inservice Exam of Selected Class 1 & 2 Components & Sys,Vols 1-5 & Steam Generator 11 & 12..., Respectively, Not Encl)
  • ML18026A308  + (Forwards ASME Boiler & Pressure Vessel Code,Section 3 Overpressure Rept Per FSAR Question 211.204)
  • ML20084J939  + (Forwards ASME Boiler & Pressure Vessel Code Section Xi,Form NIS-1,eddy Current Exam of Steam Generators 11 & 12 & Inservice Insp Rept of Class 1 & 2 Components)
  • ML20028F268  + (Forwards ASME Boiler & Pressure Vessel Code Section XI IWP-IWV Testing)
  • ML20040B449  + (Forwards ASME Class I,Ii & III Inservice Insp Rept for Millstone Unit 1,1980)
  • ML20095G792  + (Forwards ASME Code Baseline Document Re NRC Unresolved Item 83-07-02 & Draft SER Open Item 42,presented to NRC at 840726 Meeting in Bethesda,Md.Document Will Be Referenced in Sections of Future FSAR Amend)
  • ML20036A797  + (Forwards ASME Code Comparisons,For Review,Specifically as to Whether Any Planned Code Comparisons Listed in Attachment a Seem Unwarranted or If Other Citations in Attachments B or C Should Be Included in Comparison List)
  • ML20141D976  + (Forwards ASME Code Evaluation of Braidwood Unit 2 Nozzle F to Include Effects of Proposed Grindouts. ASME Code Section III Requirements Maintained W/Up to 1-inch Grindout Depth w/three-to-one Tapering & W/O Weld Repair)
  • ML20141D981  + (Forwards ASME Code Evaluation of Braidwood Unit 2 Nozzle F to Include Effects of Proposed Grindouts. ASME Code Section III Requirements Maintained W/Up to 1-inch Grindout Depth w/three-to-one Tapering & W/O Weld Repair)
  • ML20133D176  + (Forwards ASME Code Interpretation Request & Response Re C-360 parent-daughter Transfer Sys & Need for Pressure Relief on Transfer Manifold for Compliance Plan Issue 3, Action 9)
  • PLA-2549, Forwards ASME Code NIS-1 Form Re Preservice Exams & GE & Nuclear Energy Svcs Preservice Insp Repts  + (Forwards ASME Code NIS-1 Form Re Preservice Exams & GE & Nuclear Energy Svcs Preservice Insp Repts)
  • ML17139D233  + (Forwards ASME Code NIS-1 Form Re Preservice Exams & GE & Nuclear Energy Svcs Preservice Insp Repts)
  • ML20079E748  + (Forwards ASME Code Rept Re Overpressure Protection,In Response to OL Safety Review Request for Addl Info, Question 440.3)
  • ML20056C426  + (Forwards ASME Code Section XI IST Program for 3rd 10-Yr Interval for Prairie Island Nuclear Generating Plant,Units 1 & 2)
  • ML111960070  + (Forwards ASME Code Section XI Inservice Insp & Testing Program & Info Required for NRC Review of Requests for Relief from ASME Code Section XI Requirements, Revision 3)
  • ML17334A452  + (Forwards ASME Code Section XI Valve Test Program for DC Cook Nuclear Units 1 & 2)
  • ML20127L237  + (Forwards ASME Code Update for Third Interval ISI Program, Per 10CFR50.55(a(g))
  • ML20127L241  + (Forwards ASME Code Update for Third Interval ISI Program, Per 10CFR50.55(a(g))
  • ML20031C964  + (Forwards ASME Committee on Nuclear QA Comments on Reg Guide Tp 020-4 QA Program in Packaging Used in Transportation of Spent Fuel,High Level Waste & Pu. Review Is Not Approval or Endorsement of Document But Aid in Future Revision)
  • ML20115G703  + (Forwards ASME Form NIS-1, Owners Data Rept for Inservice Insps, as Followup to Submitting Refueling Interval 9R once-through SG Tube Insp Rept)
  • ML20205F587  + (Forwards ASME III Code Case N-318-3 Application at Plant, Per in Response to 860429 Request for Use of Code Case)
  • 1CAN069604, Forwards ASME Relief Request Re Hold Times for Class 1 Sys Hydrostatic Exams  + (Forwards ASME Relief Request Re Hold Times for Class 1 Sys Hydrostatic Exams)
  • ML19259C477  + (Forwards ASME Response Supporting Util Contention Re Welding of Split Backing Rings in Const.Requests NRC re-examine Apparent Noncompliance & Consider Changing Infraction to Observation)
  • ML19282B345  + (Forwards ASME Response to Util Inquiry Re Identified Noncompliance on Radiographic Procedure,Which Is Being Held in Abeyance.Requests Status Change of Item from Infraction to Observation.W/Encl Pertinent Correspondence W/Asme)
  • B10987, Forwards ASME Section Iii,Class 2 & 3 & ANSI B31.1.0 Piping Analysis, Ultrasonic Indications in Steam Generator Top Head Dome Weld. Evaluation Verified Structural Integrity of Plant Steam Generators,Per NRC  + (Forwards ASME Section Iii,Class 2 & 3 & ANSI B31.1.0 Piping Analysis, Ultrasonic Indications in Steam Generator Top Head Dome Weld. Evaluation Verified Structural Integrity of Plant Steam Generators,Per NRC)