Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-13-0004, Fermi 2, Enclosure 13 to NRC-13-0004, Calculation DC-6443, Vol I, DCD 1, Rev. a, Reactor Core Thermal Power Uncertainty with Feedwater Flow Measured by LEFM Checkplus C System. + (Fermi 2, Enclosure 13 to NRC-13-0004, Calculation DC-6443, Vol I, DCD 1, Rev. a, Reactor Core Thermal Power Uncertainty with Feedwater Flow Measured by LEFM Checkplus C System.)
- NRC-13-0004, Fermi 2, Enclosure 14 to NRC-13-0004, Calculation DC-4608, Vol 1, DCD 1, Rev. 0, Numac Power Range Neutron Monitoring System (Prnm) Surveillance Validation. + (Fermi 2, Enclosure 14 to NRC-13-0004, Calculation DC-4608, Vol 1, DCD 1, Rev. 0, Numac Power Range Neutron Monitoring System (Prnm) Surveillance Validation.)
- NRC-13-0004, Fermi 2, Enclosure 9 to NRC-13-0004, NEDO-33578, Rev. 0, Safety Analysis Report for Fermi Generating Station Unit 2 Thermal Power Optimization. + (Fermi 2, Enclosure 9 to NRC-13-0004, NEDO-33578, Rev. 0, Safety Analysis Report for Fermi Generating Station Unit 2 Thermal Power Optimization.)
- NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report + (Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report)
- NRC-08-0046, Fermi 2, Submittal of Plant Specific Emergency Core Cooling System (ECCS) Evaluation Model Reanalysis + (Fermi 2, Submittal of Plant Specific Emergency Core Cooling System (ECCS) Evaluation Model Reanalysis)
- NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases + (Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases)
- NRC-08-0031, Fermi 2, Transmittal of Annual Radioactive Effluent Release and Radiological Environmental Operating Reports and Revised Offsite Dose Calculation Manual + (Fermi 2, Transmittal of Annual Radioactive Effluent Release and Radiological Environmental Operating Reports and Revised Offsite Dose Calculation Manual)
- NRC-08-0031, Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007 + (Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007)
- ENS 49937 + (Fermi Declares Alert Due to a Fire in an Emergency Diesel Generator Turbo Charger Lagging)
- ML13246A436 + (Fermi NRC Licensing Exam Crm)
- ML12293A227 + (Fermi Power Plant Security Baseline Inspection Report Cover Letter 05000341/2012201)
- IR 05000341/2012201 + (Fermi Power Plant Security Baseline Inspection Report Cover Letter 05000341/2012201)
- NRC-17-0057, Fermi Unit 2, Revision 21 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures + (Fermi Unit 2, Revision 21 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures)
- NRC-09-0080, Fermi, Unit 1 - Information Regarding License Termination Plan + (Fermi, Unit 1 - Information Regarding License Termination Plan)
- IR 05000341/2014007 + (Fermi, Unit 2, Request for Information - Notification of NRC Triennial Fire Protection Baseline IR 05000341-14-007)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 4, Reactor + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 4, Reactor)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant)
- ML16165A454 + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report. Appendix a + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report. Appendix a)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 8, Electric Power + (Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 8, Electric Power)
- NRC-10-0018, Fermi, Unit 2, Scheduling of Initial Operator Licensing Examinations + (Fermi, Unit 2, Scheduling of Initial Operator Licensing Examinations)
- NRC-16-0034, Fermi, Unit 2, Submittal of Revision 20 Updated Final Safety Analysis Report, 10CFR50.59 and 10CFR72.48 Evaluation Summary Reports, Commitment Management Report & Revisions to Technical Requirements Manual & Technical Specifications Base + (Fermi, Unit 2, Submittal of Revision 20 Updated Final Safety Analysis Report, 10CFR50.59 and 10CFR72.48 Evaluation Summary Reports, Commitment Management Report & Revisions to Technical Requirements Manual & Technical Specifications Bases,.)
- ML080590086 + (Fermii Power Plant Unit 2, Notification of an NRC Triennial Fire Protection Baseline Inspection and Request for Information)
- ML22140A320 + (Ferrantef-hv-th21)
- ML22145A279 + (Ferrantef-th21-bio)
- ML070860419 + (Ferrmi 2 - NRC Receipt of the DTE Energy Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barries Configurations)
- ML21007A297 + (Ferrovial Agroman, S.A. 52-31107-01, 60-Day Expiry Notification)
- ML20236J449 + (Fes Alternative Cooling Water Sys,Savannah River Plant, Aiken,Sc)
- ML19284A701 + (Fes Incomplete Until Requirements of Natl Historic Preservation Act of 1966 Section 106 Are Met)
- ML19220A479 + (Fes Issued 760722 Has Been Reviewed & Is Acceptable.No Objections to Startup & Operation of Facility.Wishes to Be Informed of Any Change in Monitoring Programs)
- ML19345C550 + (Fes Mgt of Commercially Generated Radwaste, Vol 3,Public Comments Hearing Board Rept)
- ML19326A455 + (Fes Re Const)
- ML19305A597 + (Fes Re Const Site Suitability for Facility)
- ML19326E129 + (Fes Re Const of Facilities)
- ML19321A898 + (Fes Re Const of Facilities)
- ML19305A602 + (Fes Re Const of Facility)
- ML19259B476 + (Fes Re Const of Facility)
- ML19256E645 + (Fes Re Const of Facility)
- ML19305A601 + (Fes Re Const of Facility)
- ML19262A549 + (Fes Re Construction of Facility)
- ML19274D088 + (Fes Re Mfg of Floating Nuclear Power Plants by Offshore Power Sys.Part Iii:Comparison of Overall Risk from Accidental Release of Radioactivity to Environ. Floating Plants Are Potentially More Hazardous)
- ML19329B259 + (Fes Re Operation of Facility)
- ML19290A531 + (Fes Re Operation of Facility)
- ML19249B326 + (Fes Re Operation of Facility.Ep Krug Professional Qualifications & Certificate of Svc Encl)
- ML19330C607 + (Fes Re Steam Generator Repair at Surry 1)
- ML20137R035 + (Fes Update)