Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML083080074 + (Extension of Implementation Period of Amendment Number 126 Modify Diesel Generator Fuel Oil Testing Surveillance Requirements)
- ML090140042 + (Extension of Implementation Period of Amendment Number 219, Regarding the Incorporation of Technical Specification Task Force Traveler (TSTF)-448, Revision 3, Control Room Habitability)
- NOC-AE-02001306, Extension of Implementation Time for Amendment Nos. 136 & 125, Relaxation of Allowed Outage Times & Bypass Test Times for Instrumentation + (Extension of Implementation Time for Amendment Nos. 136 & 125, Relaxation of Allowed Outage Times & Bypass Test Times for Instrumentation)
- ML021200314 + (Extension of Implementation Time for Amendment Nos. 136 & 125, Relaxation of Allowed Outage Times & Bypass Test Times for Instrumentation)
- ML081780786 + (Extension of Implementation of Generic Letter 2004-02 Actions)
- ML061250442 + (Extension of Integrated Leakage Rate Test Interval for Prairie Island, Unit 1 & 2 Mc 9272/73)
- ML111791481 + (Extension of Lead Fuel Assembly Program for SONGS Unit 2 Cycle 17)
- ML052160236 + (Extension of MUR Review)
- ML14213A069 + (Extension of Notice of Enforcement Discretion (NOED) for Florida Power and Light Company (FPL) Regarding Turkey Point Nuclear Generating Station Units 3 and 4 (Noed. 14-2-001))
- ML082671120 + (Extension of Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55a(g) for the Volumetric Examination of Reactor Pressure Vessel Shell Circumferential Welds for the License Renewal Period of Extended Operation)
- ML090760978 + (Extension of Permanent Relief from Inservice Inspection Requirements for Volumetric Examination of Reactor Pressure Vessel Shell Circumferential Welds - Response to NRC Request for Additional Information)
- SVP-12-083, Extension of Provisional Variance (IEPA-12-19) from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037 + (Extension of Provisional Variance (IEPA-12-19) from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037)
- ML11249A149 + (Extension of Public Comment Period and Public Meeting on Draft License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, Ongoing Review of Operating Experience)
- ML13115A073 + (Extension of Public Comment Period for Draft Environmental Assessment and Finding of No Significant Impact Resulting from Ruling from Second Circuit U.S. Court of Appeals)
- ML11325A373 + (Extension of Public Comment Period on Draft License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-01, Aging Management of Stainless Steel Structures and Components in Treated Borated Water)
- ML18303A048 + (Extension of Reactor Pressure Vessel Surveillance Report for Capsule Z)
- ML21027A334 + (Extension of Regulatory Audit Plan for January 26 to February 24, 2021, Audit of AMS-TR0720R1, Online Monitoring Technology to Extend Calibration Intervals of Nuclear Plant Pressure Transmitters)
- L-PI-06-075, Extension of Relief Requests 2 & 3 for Fourth 10-Year Inservice Testing (IST) Program Interval + (Extension of Relief Requests 2 & 3 for Fourth 10-Year Inservice Testing (IST) Program Interval)
- ML062760445 + (Extension of Relief Requests 2 & 3 for Fourth 10-Year Inservice Testing Program Interval)
- RS-04-032, Extension of Relief for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Additional License Operating Period + (Extension of Relief for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Additional License Operating Period)
- RS-06-086, Extension of Requested Implementation Date of License Amendment Request for Activation of the Trip Outputs of the Oscillation Power Range Monitor System + (Extension of Requested Implementation Date of License Amendment Request for Activation of the Trip Outputs of the Oscillation Power Range Monitor System)
- BSEP 09-0037, Extension of Requested Implementation for License Amendment - Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement Revised Rule for Combustible Gas Control + (Extension of Requested Implementation for License Amendment - Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement Revised Rule for Combustible Gas Control)
- RS-06-095, Extension of Requested Response Date Associated with the Request for Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power + (Extension of Requested Response Date Associated with the Request for Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power)
- ML033510384 + (Extension of Response Time for Divestiture Plan Regarding Indirect Transfer of the Aerotest Radiography and Research Reactor (Arrr) to Autoliv ASP, Inc., and Autoliv, Inc)
- RS-11-032, Extension of Response to RAI for License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode + (Extension of Response to RAI for License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode)
- ML20094C151 + (Extension of Retainer Lifetime to 4 Cycles)
- ML050800154 + (Extension of Risk-Informed Inservice Inspection Applicability)
- LR-N04-0230, Extension of Risk-Informed Inservice Inspection Applicability + (Extension of Risk-Informed Inservice Inspection Applicability)
- ML030770210 + (Extension of Schedule for Reporting River Bend Station Surveillance Capsule Test Results Under BWR Integrated Surveillance Program)
- ML20356A083 + (Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program (EPRI Letter 2020-100))
- ML14140A701 + (Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program (TAC No. MF3926)(EPRI Letters 2013-185, and 2013-211))
- ML16082A265 + (Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program)
- ML053270264 + (Extension of Schedule for Reporting Surveillance Capsule Test Results)
- ML19011A333 + (Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program (EPRI Letter 2018-151))
- ML072120050 + (Extension of Schedule for the Conduct of Review of the Vermont Yankee Nuclear Power Station License Renewal Application)
- RC-04-0012, Extension of Second Inspection Interval for Inservice Testing Program (0-C-03-1864) + (Extension of Second Inspection Interval for Inservice Testing Program (0-C-03-1864))
- ML063480522 + (Extension of Site Specific Response - Mitigation Strategy Assessments and Closure Process for B.5.b Phases 1, 2, and 3)
- L-2020-160, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years + (Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years)
- EPID:L-2020-LLR-0283 + (Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years)
- ML052870573 + (Extension of Staff Review Schedule for Nine Mile Point Nuclear Station, Units 1 and 2, Amended License Renewal Application)
- ML050660147 + (Extension of Staff Review Schedule for Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application)
- ML22341A197 + (Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval)
- ML070090037 + (Extension of TS Completion Times, Associated with the Residual Heat Removal Service Water System, Diesel Generator Cooling Water System, and the Core Standby Cooling System)
- ML071490004 + (Extension of Technical Specifications 3.8.1 AC Source-Operating, Emergency Diesel Generator (EDG) Completion Time (Tac Nos. MC9001 and MC9002))
- ML071800311 + (Extension of Ten-Year Program Intervals)
- TSTF-017 + (Extension of Testing Frequency of Containment Airlock Interlock Mechanism from 184 Days to 24 Months)
- ML20246M710 + (Extension of Time for Implementation of Decontamination Priority & Trusteeship Provisions of Property Insurance Requirements, 10CFR50 Final Rule.Rule Amends Implementation Schedule to Change Effective Date)
- TSTF-208 + (Extension of Time to Reach Mode 2 in LCO 3.0.3)
- NRC 2009-0574, Extension of Time to Request Hearing (Dec. 30, 2009) - Letter to R. P. Zimmerman + (Extension of Time to Request Hearing (Dec. 30, 2009) - Letter to R. P. Zimmerman)
- ML100191116 + (Extension of Time to Request Hearing - Letter to Edward Pugh)
- ML20318A035 + (Extension of Timeframe Required to Complete Biennial Emergency Exercise Per Oregon State Triga Reactor Emergency Response Plan, Facility Operating License No. R-106)
- ML20350B726 + (Extension of Timeframe Required to Complete Biennial Emergency Exercise Per Oregon State Triga Reactor Emergency Response Plan, Facility Operating License No. R-106)