Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2018-LLL-0022 + (Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report)
- ML042650265 + (Extended Power Uprate Review Schedule)
- ML052630053 + (Extended Power Uprate Review Schedule and License Conditions)
- ML20211J260 + (Extended Power Uprate SAR for Edwin I Hatch Plant Units 1 & 2)
- ML20216B271 + (Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2)
- ML113560333 + (Extended Power Uprate Safety Evaluation)
- ML042640055 + (Extended Power Uprate Schedule)
- ML081010196 + (Extended Power Uprate Startup Test Plan)
- ML092430520 + (Extended Power Uprate Steam Dryer August 7, 2009, Conference Call)
- ML062900162 + (Extended Power Uprate Steam Dryer Evaluation)
- ML092240298 + (Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2))
- ML092190563 + (Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation)
- L-MT-12-107, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure, Sections 6.6.4 and 6.6.7 + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure, Sections 6.6.4 and 6.6.7)
- L-MT-13-036, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement for Application of License Amendment 172 + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement for Application of License Amendment 172)
- L-MT-13-059, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Informati + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Information)
- L-MT-12-082, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure)
- L-MT-08-043, Extended Power Uprate, Acceptance Review Supplemental Information Package 6 + (Extended Power Uprate, Acceptance Review Supplemental Information Package 6)
- L-2009-208, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses + (Extended Power Uprate, Data for NRC Confirmatory EPU Analyses)
- L-2008-236, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses + (Extended Power Uprate, Data for NRC Confirmatory EPU Analyses)
- BSEP 05-0081, Extended Power Uprate, Phase 2 Implementation Test Report + (Extended Power Uprate, Phase 2 Implementation Test Report)
- ML13129A143 + (Extended Power Uprate, Supplement 2 - Response to Request for Additional Information)
- W3F1-2004-0029, Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request + (Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request)
- L-MT-08-042, Extended Power Uprate: Acceptance Review Supplemental Information Package 5 + (Extended Power Uprate: Acceptance Review Supplemental Information Package 5)
- L-MT-08-041, Extended Power Uprate: Acceptance Review Supplemental Information Package 4 + (Extended Power Uprate: Acceptance Review Supplemental Information Package 4)
- L-MT-08-040, Extended Power Uprate: Acceptance Review Supplemental Information Package 3 + (Extended Power Uprate: Acceptance Review Supplemental Information Package 3)
- L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay + (Extended Power Uprate: Acknowledgement of NRC Review Delay)
- L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009 + (Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009)
- L-MT-10-046, Extended Power Uprate: Replacement Steam Dryer Supplement + (Extended Power Uprate: Replacement Steam Dryer Supplement)
- ML12207A541 + (Extended Power Uprate: Replacement Steam Dryer - Second Set of Responses to Requests for Additional Information)
- ML13248A343 + (Extended Power Uprate: Replacement Steam Dryer -Responses to Clarification Questions and Revised Analysis Documentation)
- ML12298A032 + (Extended Power Uprate: Replacement Steam Dryer - Inspection Criteria and Plan)
- ML14269A322 + (Extended Power Uprate: Replacement Steam Dryer-Revised Limit Curve Methodology)
- L-MT-13-076, Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information + (Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information)
- L-MT-13-074, Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information + (Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information)
- ML13092A348 + (Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information and Analysis Documentation)
- L-MT-13-028, Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information for Acoustic/Structural Analyses Set 3 + (Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information for Acoustic/Structural Analyses Set 3)
- L-MT-14-060, Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information + (Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information)
- L-MT-11-004, Extended Power Uprate: Replacement Steam Dryer - Initial Response to Request for Additional Information + (Extended Power Uprate: Replacement Steam Dryer - Initial Response to Request for Additional Information)
- ML15034A573 + (Extended Power Uprate: Request for NRC Approval of Revision to Methodology for Establishing Replacement Steam Dryer Strain Limits)
- L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009 + (Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009)
- L-MT-09-046, Extended Power Uprate: Response to NRC Balance of Plant Review Branch Sbpb Request for Additional Information (RAI) Dated March 23, 2009 + (Extended Power Uprate: Response to NRC Balance of Plant Review Branch Sbpb Request for Additional Information (RAI) Dated March 23, 2009)
- L-MT-09-048, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Request for Additional Information (RAI) Dated March 19, 2009, and March 26,2009 + (Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Request for Additional Information (RAI) Dated March 19, 2009, and March 26,2009)
- L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009 + (Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009)
- L-MT-09-045, Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 2009 + (Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 2009)
- L-MT-09-072, Extended Power Uprate: Response to NRC Fire Protection Branch (Afpb) Review Item Dated July 2, 2009, Regarding the Preparation of the Draft Safety Evaluation + (Extended Power Uprate: Response to NRC Fire Protection Branch (Afpb) Review Item Dated July 2, 2009, Regarding the Preparation of the Draft Safety Evaluation)
- ML091410120 + (Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009)
- L-MT-09-044, Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009 + (Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009)
- ML092260436 + (Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 20, 2009, and June 26, 2009)
- L-MT-09-029, Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 2009 + (Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 2009)
- ML092090219 + (Extended Power Uprate: Response to NRC Reactor Systems Review Branch and Nuclear Code and Performance Review Branch Request for Additional Information (RAI) Dated March 23, 2009 and Nuclear Code and Performance Review Branch Request for)
- L-MT-09-042, Extended Power Uprate: Response to NRC Reactor Inspection Branch Request for Additional Information (RAI) Dated March 20, 2009 + (Extended Power Uprate: Response to NRC Reactor Inspection Branch Request for Additional Information (RAI) Dated March 20, 2009)