Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-6697, Extended Power Uprate Master Procedure TP-299-010 Renewed Operating License No. NPF-022 License Condition 2.C.(20)(c) + (Extended Power Uprate Master Procedure TP-299-010 Renewed Operating License No. NPF-022 License Condition 2.C.(20)(c))
- PLA-6715, Extended Power Uprate Master Test Procedure Supplement, Renewed Operating License No. NPF-22, License Condition 2.C.(20)(c), PLA-6715 + (Extended Power Uprate Master Test Procedure Supplement, Renewed Operating License No. NPF-22, License Condition 2.C.(20)(c), PLA-6715)
- PLA-6603, Extended Power Uprate Master Test Procedure TP-199-013 + (Extended Power Uprate Master Test Procedure TP-199-013)
- W3F1-2002-0106, Extended Power Uprate Methodologies + (Extended Power Uprate Methodologies)
- ML113410172 + (Extended Power Uprate Pre-Application Meeting)
- ML082770565 + (Extended Power Uprate Pre-Application Meeting Slides)
- ML040340205 + (Extended Power Uprate Project - Environmental Assessment and Finding of Significant Impact (Fonsi))
- ML041210253 + (Extended Power Uprate Project - Environmental Assessment and Finding of No Significant Impact (Fonsi))
- CNL-18-106, Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report + (Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report)
- EPID:L-2018-LLL-0022 + (Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report)
- ML042650265 + (Extended Power Uprate Review Schedule)
- ML052630053 + (Extended Power Uprate Review Schedule and License Conditions)
- ML20211J260 + (Extended Power Uprate SAR for Edwin I Hatch Plant Units 1 & 2)
- ML20216B271 + (Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2)
- ML113560333 + (Extended Power Uprate Safety Evaluation)
- ML042640055 + (Extended Power Uprate Schedule)
- ML081010196 + (Extended Power Uprate Startup Test Plan)
- ML092430520 + (Extended Power Uprate Steam Dryer August 7, 2009, Conference Call)
- ML062900162 + (Extended Power Uprate Steam Dryer Evaluation)
- ML092240298 + (Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2))
- ML092190563 + (Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation)
- L-MT-12-107, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure, Sections 6.6.4 and 6.6.7 + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure, Sections 6.6.4 and 6.6.7)
- L-MT-13-036, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement for Application of License Amendment 172 + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement for Application of License Amendment 172)
- L-MT-13-059, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Informati + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Information)
- L-MT-12-082, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure)
- L-MT-08-043, Extended Power Uprate, Acceptance Review Supplemental Information Package 6 + (Extended Power Uprate, Acceptance Review Supplemental Information Package 6)
- L-2009-208, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses + (Extended Power Uprate, Data for NRC Confirmatory EPU Analyses)
- L-2008-236, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses + (Extended Power Uprate, Data for NRC Confirmatory EPU Analyses)
- BSEP 05-0081, Extended Power Uprate, Phase 2 Implementation Test Report + (Extended Power Uprate, Phase 2 Implementation Test Report)
- ML13129A143 + (Extended Power Uprate, Supplement 2 - Response to Request for Additional Information)
- W3F1-2004-0029, Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request + (Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request)
- L-MT-08-042, Extended Power Uprate: Acceptance Review Supplemental Information Package 5 + (Extended Power Uprate: Acceptance Review Supplemental Information Package 5)
- L-MT-08-041, Extended Power Uprate: Acceptance Review Supplemental Information Package 4 + (Extended Power Uprate: Acceptance Review Supplemental Information Package 4)
- L-MT-08-040, Extended Power Uprate: Acceptance Review Supplemental Information Package 3 + (Extended Power Uprate: Acceptance Review Supplemental Information Package 3)
- L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay + (Extended Power Uprate: Acknowledgement of NRC Review Delay)
- L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009 + (Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009)
- L-MT-10-046, Extended Power Uprate: Replacement Steam Dryer Supplement + (Extended Power Uprate: Replacement Steam Dryer Supplement)
- ML12207A541 + (Extended Power Uprate: Replacement Steam Dryer - Second Set of Responses to Requests for Additional Information)
- ML13248A343 + (Extended Power Uprate: Replacement Steam Dryer -Responses to Clarification Questions and Revised Analysis Documentation)
- ML12298A032 + (Extended Power Uprate: Replacement Steam Dryer - Inspection Criteria and Plan)
- ML14269A322 + (Extended Power Uprate: Replacement Steam Dryer-Revised Limit Curve Methodology)
- L-MT-13-076, Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information + (Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information)
- L-MT-13-074, Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information + (Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information)
- ML13092A348 + (Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information and Analysis Documentation)
- L-MT-13-028, Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information for Acoustic/Structural Analyses Set 3 + (Extended Power Uprate: Replacement Steam Dryer - Responses to Requests for Additional Information for Acoustic/Structural Analyses Set 3)
- L-MT-14-060, Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information + (Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information)
- L-MT-11-004, Extended Power Uprate: Replacement Steam Dryer - Initial Response to Request for Additional Information + (Extended Power Uprate: Replacement Steam Dryer - Initial Response to Request for Additional Information)
- ML15034A573 + (Extended Power Uprate: Request for NRC Approval of Revision to Methodology for Establishing Replacement Steam Dryer Strain Limits)
- L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009 + (Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009)
- L-MT-09-046, Extended Power Uprate: Response to NRC Balance of Plant Review Branch Sbpb Request for Additional Information (RAI) Dated March 23, 2009 + (Extended Power Uprate: Response to NRC Balance of Plant Review Branch Sbpb Request for Additional Information (RAI) Dated March 23, 2009)
- L-MT-09-048, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Request for Additional Information (RAI) Dated March 19, 2009, and March 26,2009 + (Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Request for Additional Information (RAI) Dated March 19, 2009, and March 26,2009)
- L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009 + (Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009)