Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Engineering Commitment Status Update". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • NRC-09-0080, Engineering Calculation No. ENG-006, Revision 000, Calculation of DTE EF-1 Area Factors for Soil.  + (Engineering Calculation No. ENG-006, Revision 000, Calculation of DTE EF-1 Area Factors for Soil.)
  • ML093640143  + (Engineering Calculation No. ENG-006, Revision 000, Calculation of DTE EF-1 Area Factors for Soil)
  • ML053050354  + (Engineering Change (EC) Evaluation 355773, Evaluation of Quad Cities Unit 1 Main Steam Line Vibrations at EPU Power Levels with Replacement Dryer, Revision 0)
  • ML20125D911  + (Engineering Change Authorization 113 Re Relocation of Sensing Nozzle Level & Deletion of One of Three Sets of Level Sensing Nozzles on Pressurizer.Diagram of Proposed Relocation of Pressurizer Level Sensing Nozzles Encl)
  • ML17255A830  + (Engineering Change EC 366685, Revision 67, OP Eval. 07-006, Aux Feed Tunnel Covers Installation, Redacted)
  • ML20136C236  + (Engineering Change Memo Re Isokinetic Nozzles for HP-R-221A, 221B,222A,222B,222C,222D,228D,228A & 228B.Radiological Ref 45)
  • ML19254B011  + (Engineering Change Memo Re Velocity Probes HP-R-219 & HP-R-219B.Radiological Ref 46)
  • ML20024B910  + (Engineering Change Memo Revising Wiring Per Encl)
  • ML20024B266  + (Engineering Change Memo S-5934 Re RC-RVE on Signal Light to Provide Open Signal on Indication for Valve RC-RV12 & to Revise Logic to Have Valve Fail Closed on Loss of Power)
  • ML031530169  + (Engineering Change Package - Reference Documents Table of Content - ECR No. 02-0805-00, Rev. 01)
  • ML102871014  + (Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Page 2 of 30. (636 Pages Information Blocked Out))
  • ML102871016  + (Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Pages 279 of 364 (636 Pages Information Blocked Out))
  • ML102871056  + (Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Pages 157 of 364. (636 Pages Information Blocked Out))
  • ML102871019  + (Engineering Change Package 75219, Rev 0; Reactor Building 28 Undated Delamination Repair - Phase 3 Concrete Removal)
  • ML102870908  + (Engineering Change Package 75220, Rev 0; Reactor Building Concrete Placement, Part 1 of 2)
  • ML102870905  + (Engineering Change Package 75220, Rev 0; Reactor Building Concrete Placement, Part 2 of 2)
  • ML031530183  + (Engineering Change Request ECR NO-02-805-00)
  • ML031530174  + (Engineering Change Screen)
  • ML041400115  + (Engineering Change, J.50.59 Screen/Evaluation)
  • ML20133G099  + (Engineering Characterization of Ground Motion - Task II: Soil-Structure Interaction Effects on Structural Response)
  • ML20100E383  + (Engineering Characterization of Ground Motion.Task II: Effects of Ground Motion Characteristics on Structural Response Considering Localized Structural Nonlinearities and Soil-Structure Interaction Effects)
  • ML20092D093  + (Engineering Characterization of Ground Motion.Task I:Effects of Characteristics of Free-Field Motion on Structural Response)
  • ML20206Q492  + (Engineering Characterization of Ground Motion.Task II: Soil-Structure Interaction Effects on Structural Response)
  • ML20141P094  + (Engineering Characterization of Ground Motion.Task II: Observational Data on Spatial Variations of Earthquake Ground Motion)
  • ML20209D498  + (Engineering Characterization of Ground Motion.Task II: Summary Report)
  • ML17192A838  + (Engineering Criteria Procedure for Application of Blume Curves Criteria)
  • ML17192A836  + (Engineering Criteria/Procedure for Review & Resolution of As-Built Deviations, Revision 2)
  • ML20041G416  + (Engineering Data Compilation for Wolf Creek Lake)
  • ML17139A456  + (Engineering Design Info,Thermo-Lag 330-1 Subliming Coating Envelope Sys for Fine Resistive Enhancement of Critical Components of Nuclear Power Generating Facilities, Vol 2)
  • ML17139A455  + (Engineering Design Info,Thermo-Lag 330-1 Subliming Coating Envelope Sys for Fine Resistive Enhancement of Critical Components of Nuclear Power Generating Facilities, Vol 1)
  • ML17342A015  + (Engineering Design Verification Program)
  • ML20247F832  + (Engineering Design for the NRC Operations Center)
  • 05000285/LER-1989-003, Engineering Determined That Damper Should Have Been Included in Surveillance Test Upon Installation.Caused by Procedure Change 26043 Initiated to Add Damper to Surveillance Test & Drawing Rev Submitted  + (Engineering Determined That Damper Should Have Been Included in Surveillance Test Upon Installation.Caused by Procedure Change 26043 Initiated to Add Damper to Surveillance Test & Drawing Rev Submitted)
  • ML20213E512  + (Engineering Div QA Manual for Design,Fabrication,Assembly & Testing of Packaging Used in Transport of Radioactive Matl)
  • ML20248L098  + (Engineering Drawings for 10 CFR Part 71 Package Approvals)
  • ML12340A269  + (Engineering Evaluation 12-E18, Revision 0, Attachment C - Page 76 of 322)
  • ML12340A275  + (Engineering Evaluation 12-E18, Revision 0, Attachment E Through J)
  • ML12340A273  + (Engineering Evaluation 12-E18, Revision 0, Attachment D - Area Walk-By Checklists)
  • ML15078A289  + (Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-219 Through the End)
  • ML15078A287  + (Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 1 Through 2-114)
  • ML15078A288  + (Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218)
  • ML18153B271  + (Engineering Evaluation 22, Evaluation of Fire Rating for Ventilation Ducts in Turbine Bldg & Battery Rooms - Surry Power Station)
  • ML18153D298  + (Engineering Evaluation 22,CH10-22,Rev 11, Evaluation of Fire Endurance Rating for Ventilation Ducts Coated w/Thermo- Lag,Surry Power Station)
  • ML20035E675  + (Engineering Evaluation 23,CH10-23,Rev 11, Evaluation of Existing Fire Rated Wrap in Unit 1 Cable Vault/Tunnel,Surry Power Station)
  • ML20217M651  + (Engineering Evaluation Hrrm Coaxial Cable LOCA Test Post- Test Insulation Resistance Results)
  • ML17312A681  + (Engineering Evaluation MOV Key Failures)
  • ML19269C731  + (Engineering Evaluation Re Weld Burn & Splatter on Interior Surfaces of High Density Spent Fuel Racks Is Complete. Determined That Weld Splatter Sufficient to Potentially Tear or Deform Fuel Assembly Grid Straps Does Exist)
  • ML20209D104  + (Engineering Evaluation Rept AEOD/E416, Erosion in Nuclear Power Plants)
  • ML20210L488  + (Engineering Evaluation Rept AEOD/E604, Spurious Sys Isolations Caused by Panalarm Model 86 Thermocouple Monitor. IE Should Consider Issuing Info Notice to All BWR Licensees Re Spurious Isolations)
  • ML20211P904  + (Engineering Evaluation Rept AEOD/E608, Reexam of Water Hammer Occurrences)