Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML121910319 + (Day and Annual Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model)
- HNP-14-026, Daylnservice Inspection Summary Report + (Daylnservice Inspection Summary Report)
- ML051370110 + (Days After Plant Restart Report - First Revised NRC Order EA-03-009, Interim Inspection Requirement for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML031600461 + (Days After Plant Restart Report - NRC Order EA-03-009, Interim Inspection Requirement for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML100750376 + (Days Notification of Plans to Store Spent Fuel in an Independent Spent Fuel Storage Installation)
- IR 05000352/1986027 + (Daytime & Backshift Insp Rept 50-352/86-27 on 861127-870126. No Violations Identified.Major Areas Inspected:Followup on Outstanding Items & Plant Tours Including Fire Protection Measures.Unresolved Items Initiated in Two Areas)
- ML20207K868 + (Daytime & Backshift/Holiday Insps of 880815-0924.No Violations Noted.Major Areas Inspected:Plant Tours,Sys Walkdowns,Observations of Maint & Surveillance & Review of LERs & Periodic Repts.Supporting Info Encl)
- ML24151A640 + (Daywi Cook, Covert Township - Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, LLCs Licensing and Regulatory Requests for Reauthorization of Power Ope)
- ML20138N941 + (Dba,Radiation,Decontamination Test Results 10/11S/11/1201)
- ML18170A246 + (Dbi, Inc., Notice of Expiration of License 15-29301-02)
- ML18211A533 + (Dbi, Inc.; Void Letter; License 15-29301-02; Docket 030-38754; Control 592504)
- ML20266E135 + (Dbp (as Built) Support Locations Radii of Outlet Nozzle to Internals Seating Surface.Sheet 5 of 9)
- ML20266E130 + (Dbp (as Builts) Clevis.Sheet 4 of 9)
- ML20266E142 + (Dbp as Builts Wall Size,Inside Diameter of Outlet Nozzle and Nozzle Orientation.Sheet 6 of 9)
- ENS 51083 + (Dc Electrical Room Heat Load Calculations Not Updated After New Inverters Installed)
- ML23352A350 + (Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information)
- ML19326B837 + (Dcc 2019003 Reissue)
- ML14045A134 + (Dcc EP Annual Closeout (Rdj))
- ML031270619 + (Dcc Nuclear Power Plant Units 1 and 2 Response to April 24, 2003, Fish Intrusion Event)
- ML13360A047 + (Dcc Requalification Program Inspection (Meb))
- ML15022A153 + (Dccook ISI Request for Information)
- ML15030A098 + (Dccook Scheduling of Initial OL Exam)
- E910-02-044, Dcgl Tables and Bounding Equation Submittal + (Dcgl Tables and Bounding Equation Submittal)
- ML022750270 + (Dcgl Tables and Bounding Equation Submittal)
- ML24033A306 + (Dcisc 2-1-2024 Email: Comments by Mr. Bruce Severance at This Mornings Public Meeting Re Scope of Review for DCPP License Extension)
- DCL-02-070, Dcl 02-070 Change 20 to Revision 18 of the Physical Security Plan + (Dcl 02-070 Change 20 to Revision 18 of the Physical Security Plan)
- ML18257A331 + (Dclaration of Tommy Taylor)
- ML18092B577 + (Dcrdr Emergency Operating Procedure Upgraded Task Analysis Rept)
- ML17324B246 + (Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication)
- ML20234B505 + (Dcrdr Final Rept)
- ML20155G920 + (Dcrdr Final Summary Rept,Program Implementation,Vol 1)
- ML20058L189 + (Dcrdr Human Engineering Discrepancy Repts 1988 Summary Addendum 1,Vol 1)
- ML20245D791 + (Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3)
- ML20245D668 + (Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3)
- ML20246E828 + (Dcrdr Second Supplemental Summary Rept)
- ML20206J500 + (Dcrdr Special Study Plans for Davis-Besse)
- ML20141E844 + (Dcrdr Summary Rept)
- ML20154C489 + (Dcrdr Summary Rept)
- ML20137N024 + (Dcrdr Summary Rept Evaluation for Dresden Station,Units 2 & 3)
- ML20125C460 + (Dcrdr Summary Rept Suppl)
- ML20216J657 + (Dcrdr Summary Rept Suppl for Vermont Yankee Nuclear Power Plant)
- ML20207G196 + (Dcrdr Summary Rept Vol I, Methodology & Approach)
- ML20207G224 + (Dcrdr Summary Rept Vols II & Iia, Human Engineering Discrepancy Results)
- ML20127B097 + (Dcrdr Summary Rept for Crystal River Unit 3 Generating Station)
- ML20128E413 + (Dcrdr Summary Rept for Vermont Yankee Nuclear Power Plant)
- ML20133B508 + (Dcrdr Summary Rept for Yankee Nuclear Power Station)
- ML20138R004 + (Dcrdr Summary Rept for Yankee Rowe Nuclear Power Station, Technical Evaluation Rept)
- ML20214Q452 + (Dcrdr Summary Rept,Fermi 2)
- ML20135H716 + (Dcrdr Summary Rept. W/Six Oversize Drawings)
- ML20237G162 + (Dcrdr Suppl 2 - Summary Rept)
- ML20209G870 + (Dcrdr Suppl II to Summary Rept)