Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML031330767 + (Cycle 11 (U2C11) 12-Month Steam Generator (SG) Inspection Report and Metallurgical Examination Report on Tube Removed from Steam Generator)
- ML023010683 + (Cycle 11 12-Month Steam Generator Inspection Report)
- ML040630112 + (Cycle 11 90-Day Steam Generator Report for Voltage Based Alternate Repair Criteria)
- ML20080R786 + (Cycle 11 Colr)
- ML20101F382 + (Cycle 11 Colr)
- ML20107G594 + (Cycle 11 Colr)
- SBK-L-05122, Cycle 11 Core Operating Limits Report + (Cycle 11 Core Operating Limits Report)
- NL-04-0623, Cycle 11 Core Operating Limits Report + (Cycle 11 Core Operating Limits Report)
- NL-03-1078, Cycle 11 Core Operating Limits Report + (Cycle 11 Core Operating Limits Report)
- BYRON 2002-0100, Cycle 11 Core Operating Limits Report + (Cycle 11 Core Operating Limits Report)
- ML020930163 + (Cycle 11 Core Operating Limits Report)
- ML040770075 + (Cycle 11 Core Operating Limits Report (COLR))
- ML061300524 + (Cycle 11 Core Operating Limits Report, Revision 0)
- ML20084S466 + (Cycle 11 Core Performance Analysis)
- ML20150E906 + (Cycle 11 Core Performance Analysis)
- NOC-AE-03001449, Cycle 11 End of Life Moderator Temperature Coefficient Limit Report + (Cycle 11 End of Life Moderator Temperature Coefficient Limit Report)
- ML030300474 + (Cycle 11 End of Life Moderator Temperature Coefficient Limit Report)
- ML18096A664 + (Cycle 11 Peaking Factor Limit Rept)
- ML17199U413 + (Cycle 11 Plant Transient Analysis)
- NOC-AE-02001344, Cycle 11 Power Uprate Startup Testing Summary Report + (Cycle 11 Power Uprate Startup Testing Summary Report)
- ML021910025 + (Cycle 11 Power Uprate Startup Testing Summary Report)
- ML021910352 + (Cycle 11 Power Uprate Startup Testing Summary Report)
- L-99-059, Cycle 11 Reactor Startup Physics Testing Rept. with + (Cycle 11 Reactor Startup Physics Testing Rept. with)
- ML17199U412 + (Cycle 11 Reload Analysis)
- ML20086K763 + (Cycle 11 Reload Analysis Rept)
- L-03-158, Cycle 11 Reload and Core Operating Limits Report + (Cycle 11 Reload and Core Operating Limits Report)
- ML20107D684 + (Cycle 11 Startup)
- ML20084U726 + (Cycle 11 Startup Physics Test Rept)
- ML17227A369 + (Cycle 11 Startup Physics Testing Rept)
- ML20149H894 + (Cycle 11 Startup Physics Tests Rept. W/)
- SBK-L-05146, Cycle 11 Startup Report + (Cycle 11 Startup Report)
- ML050800368 + (Cycle 11 Startup Report)
- ML031970349 + (Cycle 11 Startup Report)
- ML030350006 + (Cycle 11 Startup Report)
- RBG-45900, Cycle 11 Startup Report + (Cycle 11 Startup Report)
- ML20096B431 + (Cycle 11 Startup Rept)
- RA05-051, Cycle 11 Startup Test Report Summary + (Cycle 11 Startup Test Report Summary)
- ML13114A252 + (Cycle 11 Steam Generator Tube Inspection Report)
- ML20115J000 + (Cycle 11 Summary of Startup Testing)
- ML11137A120 + (Cycle 11, Core Operating Limits Report)
- CP-200800514, Cycle 11, Core Operating Limits Reports + (Cycle 11, Core Operating Limits Reports)
- NOC-AE-03001488, Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports + (Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports)
- ML030780031 + (Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports)
- HNP-02-124, Cycle 11, Startup Test Report Revision 1 + (Cycle 11, Startup Test Report Revision 1)
- ML20087L381 + (Cycle 11,Startup Physics Tests Rept)
- ML18058B391 + (Cycle 11:Disposition & Analysis of Standard Review Plan Chapter 15 Events)
- ML032660885 + (Cycle 12 (U1C12) 90-Day Inservice Inspection (ISI) Summary Report)
- ML042720448 + (Cycle 12 (U2C12) 12-Month Steam Generator Inspection Report)
- ML040700386 + (Cycle 12 (U2C12) 90-Day Inservice Inspection (ISI) Summary Report)
- ML040710360 + (Cycle 12 (U2C12) 90-Day Steam Generator Report for Voltage-Based Alternate Repair Criteria)
- ML20137M958 + (Cycle 12 COLR, Feb 1997)