Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML052720291 + (Current Facility Operating License No. DPR-66, Technical Specifications, Revised 01/21/2025)
- ML052780411 + (Current Facility Operating License No. DPR-68, Technical Specifications, Revised 01/15/2025)
- ML062900536 + (Current Facility Operating License No. DPR-62, Technical Specifications, Revised 07/16/2024)
- ML053050305 + (Current Facility Operating License No. DPR-58, Tech Specs, Revised 01/07/2025)
- ML053050307 + (Current Facility Operating License No. DPR-74, Tech Specs, Revised 01/07/2025)
- ML052780020 + (Current Facility Operating License No. DPR-52, Technical Specifications, Revised 01/15/2025)
- ML052780019 + (Current Facility Operating License No. DPR-33, Technical Specifications, Revised 01/15/2025)
- ML053110490 + (Current Facility Operating License No. NPF-3, Technical Specifications, Revised 04/09/2024)
- ML052860286 + (Current Facility Operating License No. NPF-29, Tech Specs, Revised 11/14/2024)
- Information Notice 1992-55, Current Fire Endurance Test Results for Thermo-Lag Barrier Material + (Current Fire Endurance Test Results for Thermo-Lag Barrier Material)
- RIS 2002-16, Current Incident Response Issues + (Current Incident Response Issues)
- ML102030270 + (Current Issues, Edwin I Hatch Nuclear Plant)
- ML081830216 + (Current Job Descriptions and Minimum Qualifications, and Salary Range for Senior Resident Inspector and Resident Inspector. as Noted, the Amount Listed Is an Estimate)
- 05000456/FIN-2013002-07 + (Current Licensing Basis Requirements for the Unit 1 and Unit 2 Containment Sump Isolation Valves)
- 05000456/FIN-2013002-06 + (Current Licensing Basis Requirements for RCS Pressure Control Function During a Postulated Seismic Event in Reference to NRC RSB BTP 5-1)
- ML20035B183 + (Current Licensing Basis for Operating Plants)
- ML20294A053 + (Current Lighting Solutions, LLC, NRC Form 532, Mcn 623426)
- ML20076D835 + (Current Methodologies for Assessing Seismically Induced Settlements in Soil)
- ML20205F506 + (Current Methodologies for Assessing the Potential for EARTHQUARKE-INDUCED Liquefaction in Soils)
- ML20128A415 + (Current Mgt Views & Mgt Plan for Resolution of All Issues. Updated Section 13.1 to FSAR Re Organizational Structure of Applicant Encl.Certificate of Svc Encl)
- ML19317H002 + (Current NRC Guidance on Radiological Environ Monitoring)
- ML18065B257 + (Current NRC Staff Views on Applying the 1987 Policy Statement on Deferred Plants)
- ML20083J000 + (Current Practices for Maintaining Occupational Exposures ALARA at LOW-LEVEL Waste Disposal Sites)
- ML050820235 + (Current Property and Decontamination Liability Insurance)
- ML040830614 + (Current Property and Decontamination Liability Insurance)
- ML010590147 + (Current Regulatory Activities Related to Air-Operated Valves)
- ML20009C805 + (Current Regulatory Activities Under the Fuel Facilities Business Line)
- ML18275A203 + (Current Renewed Facility Operating License NPF-38 Attachment 2 and Tech Specs)
- ML18275A133 + (Current Renewed Facility Operating License NPF-38)
- ML20147B227 + (Current Schedule for Submittal to NRC Staff of Required Rev ECCS Analysis & Associated Tech Spec Changes Is 780105.We Scheduled Rev Analysis for Subj Facil to Begin Late 781031)
- ML19291D553 + (Current Status NRC Pre Generic Issue - 018 High Energy Arching Faults (HEAF) Involving Aluminum (October 17, 2019))
- ML20056A303 + (Current Status Rept Formerly Licensed Site Decontamination Program,Vols 1 & 2)
- ML23210A000 + (Current Status and Plans of Decommissioning of the Fukushima Daiichi NPP - W9 - Decommissioning in a Dynamic Environment)
- ML19143A158 + (Current Status of Low Safety Significant Issue Resolution (LSSIR) Slides by the Office of Nuclear Reactor Regulation for the May 29, 2019, Public Meeting)
- ML19217A253 + (Current Status of Low Safety Significant Issue Resolution (LSSIR) - Office of Nuclear Reactor Regulation - Public Meeting - August 7, 2019)
- ML19221A481 + (Current Status of Plant Sys)
- ML13319B251 + (Current Status of U.S. Nuclear Regulatory Commission Inspection Manual Chapter 0350 Panel Fort Calhoun Station Restart Checklist and Basis Documents)
- ML13262A371 + (Current Status of U.S. Nuclear Regulatory Commission Inspection Manual Chapter 0350 Panel Fort Calhoun Station Restart Checklist and Basis Documents)
- ML061040514 + (Current Status/Future Plans Regarding Onsite Groundwater Contamination at Iped)
- ML022830043 + (Current TAC List)
- ML19320B304 + (Current Tech Specs Pages 243 Through 246 Re Administrative Controls)
- ML19074A142 + (Current Thoughts on Resolving Low Safety Significant Issues)
- ML22146A366 + (Current Through Revision 10 to Fire Protection Report (ML22111A255 Redacted))
- ML081830217 + (Current Total Compensation and Benefits Paid to Each of the Inspectors at the San Onofre Nuclear Generating Station, Including Benefits and Overtime. the Spreadsheet Shows the Current Totals - 2008 Ytd for Compensation and Benefits Paid by)
- ML22040A112 + (Current U.S. Independent Spent Fuel Storage Installation (ISFSI) Map as of February 2, 2022)
- ML21116A041 + (Current U.S. Independent Spent Fuel Storage Installation (ISFSI) Map as of April 22, 2021)
- ML19105A427 + (Current U.S. Independent Spent Fuel Storage Installation (ISFSI) Map as of April 12, 2019)
- ML23165A245 + (Current U.S. Independent Spent Fuel Storage Installation (ISFSI) Map as of June 12, 2023)
- ML20315A294 + (Current U.S. Independent Spent Fuel Storage Installation (ISFSI) Map as of November 6, 2020)
- ML19337C178 + (Current U.S. Independent Spent Fuel Storage Installation (ISFSI) Map as of December 2, 2019)
- ML19276D940 + (Current Usage of Containers for SNM Storage,Transfer & Measurement)