Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B18873, Completion Information Provided for the Order for Compensatory Measures Related to Access Authorization Dated January 7, 2003 + (Completion Information Provided for the Order for Compensatory Measures Related to Access Authorization Dated January 7, 2003)
- ML022470294 + (Completion Information for Order for Interim Safeguards & Security Compensatory Measures)
- ML010510164 + (Completion Letter)
- ML20324A618 + (Completion Letter - Documentation of the Completion of Required Action Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident)
- ML100550542 + (Completion List for NEI)
- ML20136C124 + (Completion Notice for Field Change Request 2329.1,Revision 1.Supporting Info Encl)
- ML18194A713 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.lll.c (Index Number 805))
- ML18194A711 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.ii.c (Index Number 802))
- ML18194A699 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.b (Index Number 807))
- ML18194A714 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.c (Index Number 808))
- ND-18-0814, Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.b (Index Number 810) + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.b (Index Number 810))
- ND-18-0817, Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.c (Index Number 811) + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.c (Index Number 811))
- ML18194A698 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.iii.b (Index Number 804))
- ML18038B859 + (Completion Rept for USI A-46, for Mar 1997)
- ML20151B713 + (Completion Rept of 1980 Wolf Park Mine Workings Well at Cotter Mill Site Area. Related Info Encl)
- ML032110454 + (Completion Response to Generic Letter 96-06 Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, San Onofre Nuclear Generating Station, Units 2 and 3)
- ML20247K894 + (Completion Review Rept for Remedial Action at Grand Junction,Co,Disposal Site (Cheney Reservoir Disposal Site))
- ML20237D458 + (Completion Review Rept for Remedial Action at Slick Rock,Co Umtra Project Sites)
- ML20140B973 + (Completion Review Rept for Remedial Action at Grand Junction,Co U Processing Site)
- ML20198K845 + (Completion Review Rept for Remedial Action at Rifle,Co U Mill Tailings Site)
- ML20211C407 + (Completion Review Rept for Remedial Action at Salt Lake City,Ut Vitro Processing Site U Mill Tailings Remedial Action Project Site)
- ML20211A171 + (Completion Review Rept for Remedial Action at Mexican Hat/ Monument Valley U Mill Tailings Remedial Action Project Site)
- ML081890193 + (Completion Schedule for Part 2 of License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001) Edition, License Amendment Request No. 2008-01)
- ULNRC-05737, Completion Time Extensions for TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation Functions, TAC No. ME2822 (LDCN 09-0039 Supplement) + (Completion Time Extensions for TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation Functions, TAC No. ME2822 (LDCN 09-0039 Supplement))
- ULNRC-05731, Completion Time Extensions for TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation Functions (LDCN 09-0039 Supplement) + (Completion Time Extensions for TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation Functions (LDCN 09-0039 Supplement))
- ML24198A054 + (Completion Transfer Letter - Inficon 101 - Ssd 24-20)
- ML24198A042 + (Completion Transfer Letter - Inficon 102 & 103)
- ML24204A205 + (Completion Transfer Letter - Nrd 107, 108, 109- Ssd 24-29, 24-30, 24-31)
- ML24204A148 + (Completion Transfer Letter - Nrd 110, 111, and 112 - Ssd 24-34, 24-32, 24-33)
- ML24239A838 + (Completion Transfer Letter - Nrd LLC -106- Ssd 24-28)
- ML24236A698 + (Completion Transfer Letter - Nrd LLC -101, 102, 103, 104- Ssd 24-24, 24-25, 24-26, and 24-27)
- ML24204A163 + (Completion Transfer Letter - mb-microtec -101 - Ssd 24-23)
- ML18204A212 + (Completion Verification Reports for Mixed Oxide Fuel Fabrication Facility Under Construction in Aiken, South Carolina (Docket Number 70-3098))
- ML18352A926 + (Completion of 2018 Reactor Oversight Process Baseline Inspection Procedure Assessments and Review)
- ML041190326 + (Completion of Acceptance Review Regarding Stretch Power Uprate Application,)
- ML051250129 + (Completion of Acceptance Review Regarding Measurement Uncertainty Recapture Uprate Application)
- ML042160464 + (Completion of Acceptance Review Regarding Stretch Power Uprate Application, Indian Point, Unit 3)
- ML082130156 + (Completion of Acceptance Review for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule)
- ML071660317 + (Completion of Acceptance Review of Emergency Plan Request to Adopt Nuclear Energy Institute (NEI) 99-01, Revision 4, and Upgrade Emergency Action Levels)
- ML071790006 + (Completion of Acceptance Review of Request to Modify the Main Stream and Feedwater Isolation System)
- ML16295A128 + (Completion of Action 6c from the SONGS Lessons Learned Report)
- ML18352A921 + (Completion of Action Items from the 2017 Inspections, Tests, Analyses, and Acceptance Criteria Demonstration Project)
- ML16111A003 + (Completion of Action Nos. 1a, 1b, and 2 Associated with Topic 1 of the San Onofre Steam Generator Tube Degradation Event Lessons Learned)
- ENS 47225 + (Completion of Action Plan (Fabrication) Milestone)
- SVP-03-033, Completion of Actions Associated with Supplement No.1 to Generic Letter 87-02: Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue + (Completion of Actions Associated with Supplement No.1 to Generic Letter 87-02: Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue)
- ML030650912 + (Completion of Actions Associated with Supplement No.1 to Generic Letter 87-02: Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue)
- ML15320A104 + (Completion of Actions Associated with Topics 4, 5, and 7 of the San Onofre Steam Generator Tube Degradation Event Lessons Learned)
- L-PI-03-002, Completion of Actions Related to Generic Letter 96-06 + (Completion of Actions Related to Generic Letter 96-06)
- ML030420531 + (Completion of Actions Related to Generic Letter 96-06)
- L-12-211, Completion of Actions Required by Confirmatory Action Letter 3-11-001 + (Completion of Actions Required by Confirmatory Action Letter 3-11-001)