Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML082310641 + (Commitment Change Summary Report)
- ML042160010 + (Commitment Change Summary Report)
- ML21182A241 + (Commitment Change Summary Report)
- ML051940354 + (Commitment Change Summary Report - 2004)
- RA-08-022, Commitment Change Summary Report - 2007 + (Commitment Change Summary Report - 2007)
- ML082310640 + (Commitment Change Summary Report - 2007)
- RA-09-045, Commitment Change Summary Report - 2008 + (Commitment Change Summary Report - 2008)
- ML093500093 + (Commitment Change Summary Report - 2008)
- RA-13-127, Commitment Change Summary Report - 2012 + (Commitment Change Summary Report - 2012)
- ML14002A264 + (Commitment Change Summary Report - 2012)
- RA-14-107, Commitment Change Summary Report - 2013 + (Commitment Change Summary Report - 2013)
- ML14365A259 + (Commitment Change Summary Report - 2013)
- RA-15-109, Commitment Change Summary Report - 2014 + (Commitment Change Summary Report - 2014)
- RA-16-106, Commitment Change Summary Report - 2015 + (Commitment Change Summary Report - 2015)
- RA-17-086, Commitment Change Summary Report - 2017 + (Commitment Change Summary Report - 2017)
- ML17361A074 + (Commitment Change Summary Report - 2017)
- RA-19-091, Commitment Change Summary Report - 2019 + (Commitment Change Summary Report - 2019)
- NOC-AE-15003274, Commitment Change Summary Report for the Period June 21, 2013 Through June 21, 2015 + (Commitment Change Summary Report for the Period June 21, 2013 Through June 21, 2015)
- ML15203A554 + (Commitment Change Summary Report for the Period June 21, 2013 Through June 21, 2015)
- DCL-03-110, Commitment Change Summary Report, 01/01 - 12/31/02 + (Commitment Change Summary Report, 01/01 - 12/31/02)
- DCL-04-067, Commitment Change Summary Report, January 1, 2003, Through December 31, 2003 + (Commitment Change Summary Report, January 1, 2003, Through December 31, 2003)
- DCL-02-114, Commitment Change Summary Report, January - December 2001 + (Commitment Change Summary Report, January - December 2001)
- NOC-AE-0382, Commitment Change Summary Rept for Period 970107-981208, Per 10CFR50.5(b)(2).Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change.With + (Commitment Change Summary Rept for Period 970107-981208, Per 10CFR50.5(b)(2).Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change.With)
- W3F1-2011-0087, Commitment Change for Reactor Vessel Internals Degradation Management Program + (Commitment Change for Reactor Vessel Internals Degradation Management Program)
- W3F1-2011-0012, Commitment Change for Resolution of Generic Letter 2004-02 Due to Deferral of Replacing the Steam Generators + (Commitment Change for Resolution of Generic Letter 2004-02 Due to Deferral of Replacing the Steam Generators)
- ML110450255 + (Commitment Change for Resolution of Generic Letter 2004-02 Due to Deferral of Replacing the Steam Generators)
- NOC-AE-07002135, Commitment Change for Submittal of TSTF-448 + (Commitment Change for Submittal of TSTF-448)
- ML070940408 + (Commitment Change for Submittal of TSTF-448)
- W3F1-2013-0062, Commitment Change for UT Examination Frequency for the Pressurizer Safety/Relief Valves Nozzle Weld Overlays + (Commitment Change for UT Examination Frequency for the Pressurizer Safety/Relief Valves Nozzle Weld Overlays)
- NRC 2012-0115, Commitment Change for the NextEra Energy Point Beach, LLC, Generic Letter 2004-02 Plan for Resolution + (Commitment Change for the NextEra Energy Point Beach, LLC, Generic Letter 2004-02 Plan for Resolution)
- NRC 2012-0054, Commitment Change for the NextEra Energy Point Beach, LLC Generic Letter 2004-02 Plan for Resolution + (Commitment Change for the NextEra Energy Point Beach, LLC Generic Letter 2004-02 Plan for Resolution)
- ML12178A292 + (Commitment Change for the NextEra Energy Point Beach, LLC Generic Letter 2004-02 Plan for Resolution)
- ML20097B155 + (Commitment Change to Final Deficiency Rept Re Inadequate Control of Electrical Raceway Hanger Installation. Documentation Method for Installing & Inspecting Conduit Hangers Revised)
- ML061040393 + (Commitment Change: Steam Generator Tubesheet Inspection Depth)
- ML060800610 + (Commitment Change: Steam Generator Tubesheet Inspection Depth)
- PNP 2016-022, Commitment Changes Concerning Palisades Nuclear Plant Modifications for Expedited Seismic Evaluation Process Report + (Commitment Changes Concerning Palisades Nuclear Plant Modifications for Expedited Seismic Evaluation Process Report)
- L-05-148, Commitment Changes and Report of Facility Changes, Tests, and Experiments for October 12, 2003 Through April 11, 2005 + (Commitment Changes and Report of Facility Changes, Tests, and Experiments for October 12, 2003 Through April 11, 2005)
- L-05-090, Commitment Changes and Report of Facility Changes, Tests and Experiments + (Commitment Changes and Report of Facility Changes, Tests and Experiments)
- L-04-062, Commitment Changes and Report of Facility Changes, Tests and Experiments + (Commitment Changes and Report of Facility Changes, Tests and Experiments)
- L-03-180, Commitment Changes and Report of Facility Changes, Tests and Experiments + (Commitment Changes and Report of Facility Changes, Tests and Experiments)
- ML042530061 + (Commitment Clarification Sand Pocket Drain Humidity Monitoring)
- RA-08-008, Commitment Clarifications Related to the Aging Management Program for the Drywell Shell, Associated with Amergens License Renewal Application + (Commitment Clarifications Related to the Aging Management Program for the Drywell Shell, Associated with Amergens License Renewal Application)
- ET 17-0018, Commitment Closure and Supplemental Information for the Seismic High Frequency Confirmation Report + (Commitment Closure and Supplemental Information for the Seismic High Frequency Confirmation Report)
- L-MT-08-021, Commitment Closutechnical Support Center Dose Assessment in Conjunction with the Full-Scope Alternative Source Term License Amendment + (Commitment Closutechnical Support Center Dose Assessment in Conjunction with the Full-Scope Alternative Source Term License Amendment)
- ML063180215 + (Commitment Completion Acknowledgement Letter)
- NRC 2002-0008, Commitment Date Change Re Control Room Habitability + (Commitment Date Change Re Control Room Habitability)
- W3F1-2012-0011, Commitment Date Change for Submittal of Reactor Vessel Internals Degradation Management Program Consistent with MRP-227-A + (Commitment Date Change for Submittal of Reactor Vessel Internals Degradation Management Program Consistent with MRP-227-A)
- NLS2009016, Commitment Due Date Change for Two Commitments Referenced in Nine-Month Response to NRC Generic Letter 2008-01 + (Commitment Due Date Change for Two Commitments Referenced in Nine-Month Response to NRC Generic Letter 2008-01)
- ML090650249 + (Commitment Due Date Change for Two Commitments Referenced in Nine-Month Response to NRC Generic Letter 2008-01)
- ML060090295 + (Commitment Due Date Extension)
- JAFP-12-0150, Commitment Extension Application for Change to the Current Licensing Basis, Authorizing Use of on Load Tap Changers with the Reserve Station Service Transformers + (Commitment Extension Application for Change to the Current Licensing Basis, Authorizing Use of on Load Tap Changers with the Reserve Station Service Transformers)
- ML091960606 + (Commitment Inspection Per IP 71003 - App. C Mc 2515, Infrequent Procedures Lessons Learned and Key Questions Developed (as of 12/18/2008))