Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Calculation Project Schedule Update". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML082260414  + (Calculation PM-1057, Rev. 2, Re-Analysis of Control Rod Drop Accident (CRDA) Using Alternative Source Terms)
  • ML072570202  + (Calculation PM-1058, Rev. 0, Re-analysis of Main Steam Line Break (MSLB) Accident Using Alternative Source Terms)
  • ML072570205  + (Calculation PM-1059, Rev. 2, Re-analysis of Fuel Handling Accident (FHA) Using Alternative Source Terms)
  • ML082260413  + (Calculation PM-1059, Rev. 3, Re-Analysis of Fuel Handling Accident (FHA) Using Alternative Source Terms)
  • ML14211A020  + (Calculation PM-1059, Revision 5, Eab, LPZ, and CR Doses Due to Fuel Handling Accident (FHA))
  • ML072570209  + (Calculation PM-1077, Rev. 0, Post-LOCA Eab, LPZ, and CR Doses Using Alternative Source Term (Ast))
  • ML082260412  + (Calculation PM-1077, Rev. 1, Post-LOCA Eab, LPZ and CR Doses Using Alternative Source Term (Ast))
  • ML14211A021  + (Calculation PM-1170, Revision 0, PBAPS Atmospheric Dispersion Factors (X/Qs) for post-FHA Ground Hatch Releases)
  • ML061020294  + (Calculation PMP-6010-OSD-001, Rev. 19, Off-Site Dose Calculation Manual)
  • ML16287A610  + (Calculation PRA-QNT-007, Calculation of Regulatory Guide 1.177 Risk Parameters for Potential One-Time Emergency Technical� Specification Completion Time Change for Unit 1 and Unit 2 Train B Reserve Feed)
  • AEP-NRC-2020-40, Calculation PRA-QNT-009, Rev. 0, Evaluation of Risk Significance of Short-Term ILRT Extension  + (Calculation PRA-QNT-009, Rev. 0, Evaluation of Risk Significance of Short-Term ILRT Extension)
  • ML15316A514  + (Calculation PRDC-0014, Rev. 5, Division 1, 125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation)
  • ML15316A513  + (Calculation PRDC-0015, Rev. 2, Addendum A03, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation)
  • ML15316A516  + (Calculation PRDC-0015, Rev. 2, Addendum A01, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation)
  • L-15-257, Calculation PRDC-0015, Rev. 2, Addendum A02, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation  + (Calculation PRDC-0015, Rev. 2, Addendum A02, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation)
  • ML15316A515  + (Calculation PRDC-0015, Rev. 2, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation)
  • ML20214Q155  + (Calculation PRS-204, Head Penetration Plug As-Built Geometry)
  • ML20214Q158  + (Calculation PRS-205, Calculation of Min Required Length of Weld)
  • ML15084A476  + (Calculation Package - Na SWR Breach Analyses 03042015)
  • ML083120308  + (Calculation Package 0006982.304, Extended Power Uprate Main Steam Line Strain Gauge Vibration Monitoring)
  • ML092460498  + (Calculation Package 0900833.302, Rev. 0, Steam Dryer Hood Stiffener Stress Relief Modification Stress Reduction Factor (Srf) Computation, Enclosure 4)
  • ML12230A098  + (Calculation Package 1101463.301 Regarding Monticello ISI Relief Request RR-002)
  • ML15275A025  + (Calculation Package 1301415.301, Revision 0, Development of an Analysis Based Stress Allowable Reduction Factor (Sarf) - Dry Shielded Canister (DSC) Top Closure Weldments)
  • ML073240573  + (Calculation Package for Population Density and Environmental Justice Included in Er Section 2.3.1 Demography, 2.5.4 Environmental Justice, and 7.2 Severe Accidents, AR01-ER-XNC-4002)
  • NRC 2012-0025, Calculation Project Implementation Commitment Change  + (Calculation Project Implementation Commitment Change)
  • NRC 2007-0075, Calculation Project Schedule Change  + (Calculation Project Schedule Change)
  • ML032671360  + (Calculation QDC-0000-N-1117, Site Boundary and Control Doses Following a Loss of Coolant Accident Using Alternative Source Terms, Revision 0)
  • ML060580587  + (Calculation QDC-0000-N-1266, Revision 2, Re-Analysis of Main Steam Line Break Accident Using Alternative Source Terms)
  • RS-06-026, Calculation QDC-0000-N-1481, Revision 1, Quad Cities Units 1 & 2, Post-LOCA Eab, LPZ, and CR Dose - AST Analysis  + (Calculation QDC-0000-N-1481, Revision 1, Quad Cities Units 1 & 2, Post-LOCA Eab, LPZ, and CR Dose - AST Analysis)
  • ML14029A062  + (Calculation RA-0044, Revision 1 - Dose Rate at the KPS Site Boundary Following a Complete Draindown of the Spent Fuel Pool)
  • ML14029A065  + (Calculation RA-0049, Revision 1, Addendum a - Kewaunee Emergency Action Levels for Post - Cessation of Power Operations)
  • ML14029A066  + (Calculation RA-0050, Revision 0 - Kewaunee Resin Cask Drop Dose Consequence Analysis)
  • ML051450460  + (Calculation RC5035-P-200 RO, Evaluation of Nfw Piping System Due to Sgr (Unit 1 LOOP B))
  • ML051450609  + (Calculation RC5035-P-200, Rev 1, Evaluation of MFW Piping System Due to Sgr (Unit 2 Loop B))
  • ML042390217  + (Calculation RNP-I/INST-1041, Rev 3, Feedwater Flow Loop Uncertainty and Scaling Calculation, for H. B. Robinson Unit 2)
  • ML042390215  + (Calculation RNP-I/INST-1043, Rev 5, Main Steam Pressure Uncertainty and Scaling Calculation, for H. B. Robinson Unit 2)
  • ML042390211  + (Calculation RNP-I/INST-1128, Rev 5, RCS Flow Instrument Uncertainty and Scaling Calculation)
  • ML042390207  + (Calculation RNP-I/INST-1135, Rev 1, Nuclear Instrumentation Intermediate Range Error Analyses.)
  • ML12068A133  + (Calculation RNP-M/MECH-1815, Revision 1, Evaluation of Emergency Diesel Generator Starting Capability at 150 PSIG)
  • AEP-NRC-2016-23, Calculation RWA-1313-001, Rev. 1, AST Radiological Analysis Input Parameter Development  + (Calculation RWA-1313-001, Rev. 1, AST Radiological Analysis Input Parameter Development)
  • ML20249A831  + (Calculation Rept for 1AE408, DG Intercooler Heat Exchanger)
  • ML082110419  + (Calculation S-1-FHV-MDC-0705, Revision 5, Fhv System Heating and Cooling and Air Flow Determination)
  • ML070790652  + (Calculation S-C-SF-MDC-1810, Rev 7, Decay Heat-up Rates and Curves)
  • ML102720391  + (Calculation S07-0033, Revision 0, NRC SIT Member Questions to Licensee (Request 43 Response Information, Document CR-N1002-500, Attachment H, Part 3 of 3)
  • ML102720385  + (Calculation S07-0033, Revision 0, NRC SIT Member Questions to Licensee (Request 43 Response Information, Attachment 2, Part 2 of 3)
  • ML11188A195  + (Calculation S0VESSELM035 (SIA File No. 1100566.301), Reactor Pressure Vessel Head Weld Flaw Evaluation, Rev. 00.00)
  • ML101900450  + (Calculation SIA 100632.301, Revision 0, May 2010 Nine Mile Point Unit 2 Main Steam Line Strain Gage Data Reduction)
  • ML041480089  + (Calculation SM-1442, Response to NRC Request for Additional Information on Surry ESGR Phase 3 SDP Comments)
  • ML16314A517  + (Calculation SNC024-CALC-004, VEGP Determination of Emergency Action Level for Initiating Condition E-HU1)
  • ML040340095  + (Calculation ST-452, Rev. 0, Structural Evaluation of the D.C. Cook Unit 1 Sgla Closures)