Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Attachment 1 to L-2012-248, Evaluation of Proposed Change (Redacted)". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20043C781  + (Attachment 1 to Annual Environ Operating Rept,Radiological Environ Monitoring Program Sample Analysis Results,Davis- Besse Nuclear Power Station for 1986)
  • ML20073H065  + (Attachment 1 to Annual Environ Operating Rept:Radiological Environ Monitoring Program Analysis Results for Davis-Besse Nuclear Power Station for 1990)
  • ML18239A451  + (Attachment 1 to Applicants Answer Opposing Southern Alliance for Clean Energys Request for Hearing and Petition to Intervene)
  • ML19319B519  + (Attachment 1 to Application to Amend OL for Removal of Burnable Poison Rod & Orifice Rod Assemblies)
  • ML19319B966  + (Attachment 1 to Application to Amend OL for Removal of Burnable Poison Rod Assemblies)
  • ML061220456  + (Attachment 1 to Comanche Peak Conference Call)
  • ML13267A130  + (Attachment 1 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3598)
  • DCL-13-016, Attachment 1 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3598  + (Attachment 1 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3598)
  • ML16336A730  + (Attachment 1 to DTE Answer Opposing Craft Motion to Reopen - Excerpt from Winmaccs User Guide)
  • ML22118B012  + (Attachment 1 to Email Dated 4/14/22 from Sburns (Nwp) to Ngarcia Santos (NRC) Courtesy Review - Combined Comments from Nwp on Draft Certificate of Compliance No. 9279, Revision 10)
  • ML11187A277  + (Attachment 1 to Enclosure - Pilgrim Scram Report 2000 - Present)
  • ML22242A125  + (Attachment 1 to Enclosure 1 - Marked-Up Existing Technical Specifications)
  • ML14336A244  + (Attachment 1 to Enclosure 1 of PLA-7169 Facility Operating License No. NPF-14, PPL Susquehanna Unit 1 Mark-Up)
  • ML22285A118  + (Attachment 1 to Enclosure 1: Marked-Up Existing Technical Specifications)
  • ML15163A303  + (Attachment 1 to Entergy Answer Opposing NYS Petition to Intervene)
  • ML15319A006  + (Attachment 1 to Entergy Corrected Answer W Cover Ltr and Cos)
  • ML19198A330  + (Attachment 1 to Environmental Law & Policy Center Petition to Intervene and Hearing Request -Expert Report of Peter A. Bradford)
  • ML060730479  + (Attachment 1 to Exelon Letter Dated February 13, 2006)
  • RS-06-009, Attachment 1 to Exelon Letter Dated January 26, 2006  + (Attachment 1 to Exelon Letter Dated January 26, 2006)
  • ML13323A550  + (Attachment 1 to GNRO-2013/00088 JC-Q1P81-90024 Rev. 3 Division III Degraded Bus Voltage Setpoint)
  • ML20153A779  + (Attachment 1 to Holtec Letter 5025053 HI-STORE RAI Part 5 Responses June 2020)
  • ML20126E108  + (Attachment 1 to IE Info Notice 84-33)
  • ML19274E211  + (Attachment 1 to ISP Answer to Sierra Club Amended Contention 13)
  • ML18361A939  + (Attachment 1 to Interim Storage Partners LLCs Motion to Strike Portions of the Reply Filed by Dont Waste Michigan Et Al)
  • ML18361A922  + (Attachment 1 to Interim Storage Partners LLCs Motion to Strike Portions of the Reply Filed by Sierra Club)
  • LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)  + (Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version))
  • ML110050375  + (Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version))
  • ML12129A389  + (Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02)
  • ML020320188  + (Attachment 1 to Ltr Dated 01/29/02 Re Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Request for Regional Enforcement Discretion)
  • ML11327A046  + (Attachment 1 to NL-11-118 - Response to Request for Additional Information (Non-Proprietary))
  • NL-14-030, Attachment 1 to NL-14-030: Akrf Report - Update of Aquatic Impact Analyses Presented in NRCs FSEIS (December 2010) Regarding Potential Impacts of Operation of Indian Point Units 2 and 3  + (Attachment 1 to NL-14-030: Akrf Report - Update of Aquatic Impact Analyses Presented in NRCs FSEIS (December 2010) Regarding Potential Impacts of Operation of Indian Point Units 2 and 3)
  • ML15261A528  + (Attachment 1 to NL-15-089, Response to Request for Additional Information Netco Report NET-300067-01, Revision 1, (Non-Proprietary))
  • ML18103A030  + (Attachment 1 to NL-18-021, LTR-SDA-18-035-NP, Revision 0, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability)
  • ML14344A546  + (Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive Summary)
  • ML24127A234  + (Attachment 1 to NRC Staff Answer in Opposition to Petition for Leave to Intervene Filed by Beyond Nuclear Inc., and Sierra Club, Inc)
  • ML13275A002  + (Attachment 1 to NRC Staffs Answer to Riverkeeper, Inc. Consolidated Motion for Leave to File Amended Contention RK-EC-8A, and Amended Contention RK-EC-8A)
  • ML18247A519  + (Attachment 1 to NRC Staffs Response to Albert Gomez Petition)
  • ML12331A350  + (Attachment 1 to NRDCs Response to Exelons Motion for Order Establishing Deadline for Response to NRDCs Request for Waiver Regarding Limerick, Units 1 and 2)
  • ML20272A275  + (Attachment 1 to NextEras Answer Opposing C-10s Motion for Leave to File a Reply and Motion for Leave to File INT053 (Curran E-mail))
  • ML091200616  + (Attachment 1 to PLA-6501, Calculation EC-037-001)
  • ML14126A454  + (Attachment 1 to PLA-7163: Radioactive Effluent Release Report for Susquehanna, Units 1 & 2, Report Period: 01/01/13 - 12/31/13)
  • ML24047A141  + (Attachment 1 to RCP 901.1 Reciprocity Applicant Inspection Evaluation Checklist 02-01-2024)
  • ML24047A140  + (Attachment 1 to RCP 901.1 Reciprocity Applicant Inspection Evaluation Checklist 02-01-2024)
  • SBK-L-10185, Attachment 1 to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report  + (Attachment 1 to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report)
  • ML20080J321  + (Attachment 1 to Stress Analysis of Failed Steam Generator Manway Studs from Oconee Unit 3,Duke Power Co)
  • ML021900498  + (Attachment 1 to Supplement Dated 02/15/2002 to License Amendment Request Dated 12/11/2000 Conversion to Improved Technical Specification, NRC RAIs Section 3.4, Reactor Coolant System & NMC Responses)
  • ML062050012  + (Attachment 1 to TXX-0612 Response to Requests for Additional Information for the Replacement Steam Generator Supplement to Txu Powers Large and Small Break Loss of Coolant Accident Analysis Methodologies, Pages 1 Through 74)
  • ML062050015  + (Attachment 1 to TXX-0612 Response to Requests for Additional Information for the Replacement Steam Generator Supplement to Txu Powers Large and Small Break Loss of Coolant Accident Analysis Methodologies, Pages 169 -End & Attachment 2)
  • ML062050014  + (Attachment 1 to TXX-0612 Response to Requests for Additional Information for the Replacement Steam Generator Supplement to Txu Powers Large and Small Break Loss of Coolant Accident Analysis Methodologies, Pages 125 Through 168)
  • ML062050013  + (Attachment 1 to TXX-0612 Response to Requests for Additional Information for the Replacement Steam Generator Supplement to Txu Powers Large and Small Break Loss of Coolant Accident Analysis Methodologies, Pages 75 Through 216)