Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TSTF-187 + (Add Condition for Two Inoperable Actuation Channels)
- TSTF-567 + (Add Containment Sump TS to Address GSI-191 Issues)
- TSTF-071 + (Add Example of SFDP to the 3.0.6 Bases)
- TSTF-006 + (Add Exception for LCO 3.0.7 to LCO 3.0.1)
- TSTF-541 + (Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed)
- TSTF-182 + (Add Manual Trip to Condition for Two Channels of RPS Logic and Trip Initiation Inoperable)
- TSTF-284 + (Add Met Vs. Perform to Specification 1.4, Frequency)
- TSTF-174 + (Add Missing Bases for 3.7.6, Actions A.1 and A.2)
- TSTF-085 + (Add Modes Column to Table 3.3.1-1)
- TSTF-230 + (Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling)
- TSTF-345 + (Add New Condition C for 3.2.1 Actions)
- TSTF-134 + (Add Note Crediting CEA Drop Time SR for CEA Trip from 50 Percent Withdrawn SR)
- TSTF-317 + (Add Note to ESFAS Logic That MSIS Function Not Required When Affected Valves Are Closed)
- TSTF-130 + (Add Note to Exclude Neutron Detectors from Channel Calibration)
- TSTF-349 + (Add Note to LCO 3.9.5 Allowing Shutdown Cooling Loops Removal from Operation)
- TSTF-081 + (Add Note to SR 3.3.1.8 and SR 3.3.1.9 Excluding Neutron Detectors)
- TSTF-270 + (Add Only Required to Be Performed Example to 1.4)
- TSTF-467 + (Add Restriction for Lowest LOOP Tave During Mode 2 Physics Testing)
- ML19323F318 + (Add Revised Pages for Facility Inservice Insp Program, Incorporating Addl Pipe Weld Insp to Provide Protection Against Pipe Whip)
- TSTF-194 + (Add Shutdown Ceas to the SDM Special Test Exception)
- TSTF-365 + (Add Upper Limits to the Voltage and Time Delay Setpoints of the Loss of Voltage Relays)
- TSTF-133 + (Add a Criteria Discussion to TSP LCO)
- TSTF-090 + (Add a Note to LCO 3.5.3 That Allows RHR to Be Operable as ECCS When Aligned for Decay Heat Removal)
- TSTF-044 + (Add a Note to the Containment Isolation Valve LCO Which Exempts Mssvs, Msivs, Mfiv, Mfrvs, and Advs)
- TSTF-267 + (Add a Section 1.4 Example of Frequency Based on Plant Conditions)
- ML19165A275 + (Add an Additional Other Party to Export - XSNM3768-02)
- TSTF-014 + (Add an LCO Item and SR to Mode 2 Physics Tests Exceptions to Verify That Thermal Power <= 5 Percent Rtp.)
- ML20054F955 + (Added List of Witnesses for cross-examination on Contentions 3 & 4 & on Status of Evacuation Plans.Certificate of Svc Encl)
- TSTF-080 + (Added Shutdown Track Action for Loss of Load and Apd Trips)
- TSTF-061 + (Added Statement Clarifying the Intent of the RCS Water Inventory Balance Surveillance)
- ML20003G670 + (Addenda & Corrigendum to Carolina Environ Study Group 810414 Proposed Findings of Fact & Conclusions of Law)
- ML20211M649 + (Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted)
- ML20091K464 + (Addenda 1,2a,2b & 2c to Rev 5 to WVDP-022, Emergency Plan & Procedures Manual)
- ML19337B464 + (Addenda 6 to LOCA Analysis for Peach Bottom Atomic Power Station Unit 2)
- ML19350B589 + (Addenda Adding Paragraphs 5 C & D to SECY-81-20C)
- ML061380114 + (Addenda Songs, Units 2 & 3 - NPDES Permits)
- U-603858, Addenda to 2005 Annual Radioactive Effluent Release Report + (Addenda to 2005 Annual Radioactive Effluent Release Report)
- U-603962, Addenda to 2009 Annual Radioactive Effluent Release Report + (Addenda to 2009 Annual Radioactive Effluent Release Report)
- ML20010D815 + (Addenda to 810514 Application for Renewal of License SNM-142 Re Storage Area for Spent Fuel Rods)
- ML20150F111 + (Addenda to Annual Rept for 1987,consisting of Secondary Side Water Chemistry Rept)
- ML20071C445 + (Addenda to Inservice Insp Program Rept & Instructions for Updating Rept)
- ML20215C367 + (Addenda to Preoperational Integrated Leak Rate Test Final Rept)
- ML20085G189 + (Addenda to Rev 3 of NPPD Cooper Nuclear Station ISI Program)
- ML20153F049 + (Addenda to Rev 3 to Inservice Insp Program for ASME Class 1 2 & 3 Components)
- ML20137L000 + (Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components)
- ML20034H139 + (Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components)
- ML20247K759 + (Addenda to Rev 3 to, Inservice Insp Program for ASME Class 1,2 & 3 Components)
- ML18177A087 + (Addenda to the NuScale Containment and Ventilation System Audit Plan)
- ML20195C611 + (Addendum 1 & Spec for Structural Acceptance Test. Copyrighted Matl)
- ML19353A173 + (Addendum 1 To:Analyses of Adequacy of Davis-Besse Nuclear Power Station Onsite Electrical Auxiliary Distribution Power Sys Voltages)