Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML073450097 + (6 to Core Operating Limits Report)
- ML21201A148 + (6 to Defueled Safety Analysis Report, Chapter 1, Introduction and General Description of Plant; Chapter 2, Site Characteristics; Chapter 3, Facility Design and Operation; Chapter 4, Radioactive Waste)
- ML21201A154 + (6 to Defueled Safety Analysis Report, Drawings Incorporated by Reference - Redacted)
- ML21201A152 + (6 to Defueled Safety Analysis Report, Technical Requirements Manual)
- ML032670641 + (6 to Duke Energy Corporation Physical Security Plan and Request for Exemption from Certain Regulatory Requirements in 10 CFR 11 and 73 to Support MOX Fuel Use)
- ML033000212 + (6 to EAP-14.6, Habitability of the Emergency Facilities and Revision 23 to EAP-19, Emergency Use of Potassium Iodine (Ki))
- ML24114A056 + (6 to EIP-ZZ-C0010 Addendum E, Logistics Support Coordinator Checklist)
- ML021700217 + (6 to EIP-ZZ-C0010, Emergency Operations Facility Operations)
- W3F1-2003-0079, 6 to EP-002-050, Offsite Dose Assessment (Manual) + (6 to EP-002-050, Offsite Dose Assessment (Manual))
- ML022460402 + (6 to EP-PS-100, Emergency Director/Control Room: Emergency Plan - Position Specific Procedure)
- ML031140466 + (6 to EP-PS-104, Radiation Protection Coordinator (Rpc): Emergency Plan-Position Specific Procedure)
- ML031950098 + (6 to EP-PS-105, TSC Dose Calculator Emergency Plan-Position Specific Procedure)
- ML031990297 + (6 to EP-PS-105, TSC Dose Calculator: Emergency Plan-Position Specific Procedure)
- ML032671112 + (6 to EP-PS-127, Emergency Plan Position Specific Instruction: TSC Emergency Plan Coordinator)
- ML031920067 + (6 to EP-PS-127, TSC Emergency Plan Communicator Emergency Plan-Position Specific Instruction)
- ML032730573 + (6 to EP-PS-127, Technical Support Center (TSC) Communicator: Emergency Plan-Position Specific Procedure)
- ML031140389 + (6 to EP-PS-130, HP II Dose Calculator: Emergency Plan-Position Specific Procedure)
- ML033110406 + (6 to EP-PS-200, Recovery Manager (Rm): Emergency Plan-Position Specific Procedure)
- ML031950093 + (6 to EP-PS-200, Recovery Manager: Emergency Plan-Position Specific Instruction)
- ML031920247 + (6 to EP-PS-210, Nep Duty Planner: Emergency Plan-Position Specific Procedure)
- GNRO-2003/00066, 6 to EPIP-01-S-10-6 + (6 to EPIP-01-S-10-6)
- ML032550049 + (6 to EPIP-6, Activation & Operation of the Technical Support Center, and Revision 17 to EPIP-10, Medical Emergency Response)
- ML021130468 + (6 to EPIP-TMI-.03, Emergency Notifications and Call Outs)
- ML022100507 + (6 to EPMP-EPP-0102, Nine Mile Point, Unit 2 Emergency Classification Technical Bases)
- ML24114A053 + (6 to Emergency Implementing Procedure EIP-ZZ-00201, Revision 56, Notifications)
- JAFP-17-0122, 6 to Emergency Plan Implementing Procedure EAP-1.1 + (6 to Emergency Plan Implementing Procedure EAP-1.1)
- ML040420214 + (6 to Emergency Plan Implementing Procedures OEP-ADM-1319.01)
- ML18102A533 + (6 to Emergency Plan, MP-26-EPI-EPMP)
- ML20154Q077 + (6 to Fermi 2, Technical Requirements Manual, Vol I)
- ML18247A259 + (6 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant)
- ML18247A231 + (6 to Final Safety Analysis Report, Chapter 7, Instrumentation and Control)
- ML18247A263 + (6 to Final Safety Analysis Report, Chapter 2, Table - Monthly and Annual Wind Direction and Speed Distributions)
- ML18247A222 + (6 to Final Safety Analysis Report, Chapter 1, Introduction and Summary.(Redacted))
- ML18247A227 + (6 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems)
- ML18247A248 + (6 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System)
- ML18247A234 + (6 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System)
- ML18247A238 + (6 to Final Safety Analysis Report, Chapter 13, Initial Tests and Operation)
- ML18247A237 + (6 to Final Safety Analysis Report, Chapter 12, Conduct of Operations)
- ML18247A251 + (6 to Final Safety Analysis Report, Chapter 13, Conduct of Operations)
- ML18247A252 + (6 to Final Safety Analysis Report, Chapter 14, Initial Test Program)
- ML18247A239 + (6 to Final Safety Analysis Report, Chapter 14, Safety Analysis)
- ML18247A253 + (6 to Final Safety Analysis Report, Chapter 15, Accident Analyses)
- ML18247A240 + (6 to Final Safety Analysis Report, Chapter 15, License Renewal)
- ML18247A254 + (6 to Final Safety Analysis Report, Chapter 16, Technical Specifications)
- ML18247A255 + (6 to Final Safety Analysis Report, Chapter 17, Quality Assurance)
- ML18247A256 + (6 to Final Safety Analysis Report, Chapter 18, Human Factors Engineering)
- ML18247A272 + (6 to Final Safety Analysis Report, Chapter 19, License Renewal)
- ML18247A261 + (6 to Final Safety Analysis Report, Chapter 2, Site Characteristics)
- ML18247A262 + (6 to Final Safety Analysis Report, Chapter 2, Site Characteristics)
- ML18247A260 + (6 to Final Safety Analysis Report, Chapter 2, Site Characteristics)
- ML18247A223 + (6 to Final Safety Analysis Report, Chapter 2, Site and Environment)