Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19092A081 + (2 to Updated Safety Analysis Report, Chapter 8, Electric Power)
- ML22111A207 + (2 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems)
- ML19092A083 + (2 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems)
- ML22111A224 + (2 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm))
- ML21307A184 + (2 to Updated Safety Analysis Report, Figure List for All Chapters)
- ML21307A215 + (2 to Updated Safety Analysis Report, List of Effective Pages)
- ML19092A094 + (2 to Updated Safety Analysis Report, List of Effective Pages)
- ML21307A204 + (2 to Updated Safety Analysis Report, Master Table of Contents)
- ML19092A061 + (2 to Updated Safety Analysis Report, Public)
- ML21307A207 + (2 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases)
- ML21307A200 + (2 to Updated Safety Analysis Report, Section 10, Figures 10.1-1 to 10.4-3)
- ML21307A180 + (2 to Updated Safety Analysis Report, Section 3, Figures 3.2-1 to 3B1-1 (Redacted))
- ML21307A178 + (2 to Updated Safety Analysis Report, Section 9, Figures 9A-1 to 9A-34 (Redacted))
- ML21307A209 + (2 to Updated Safety Analysis Report, Section 12, Figures 12.2-1 to 12.6-9 (Redacted))
- ML21307A210 + (2 to Updated Safety Analysis Report, Section 2, Figures 2.5-50 to 2.5-215)
- ML21307A177 + (2 to Updated Safety Analysis Report, Section 9, Figures 9.1-1 to 9.4-29 (Redacted))
- ML21307A218 + (2 to Updated Safety Analysis Report, Section 11, Figures 11.1-1 to 11.5-1)
- ML21307A190 + (2 to Updated Safety Analysis Report, Section 14, Figures 14.2-2 to 14.2-7)
- ML21307A217 + (2 to Updated Safety Analysis Report, Section 15, Figures 15.0-1 to 15F.3-3)
- ML21307A214 + (2 to Updated Safety Analysis Report, Section 8, Figures 8.1-1 to 8.3-23 (Redacted))
- ML21307A211 + (2 to Updated Safety Analysis Report, Section 13, Figures 13.1-2 to 13.5-1)
- ML21307A195 + (2 to Updated Safety Analysis Report, Section 1 - Plant Layout (Redacted))
- ML21307A183 + (2 to Updated Safety Analysis Report, Section 2, Figures 2.1-1 to 2.5-46)
- ML21307A197 + (2 to Updated Safety Analysis Report, Section 2, Figures 2.5-47 to 2.5-49)
- ML21307A181 + (2 to Updated Safety Analysis Report, Section 2, Figures 2D-1 to 2D-2)
- ML21307A188 + (2 to Updated Safety Analysis Report, Section 2, Figures 2D-3 to 2E-1)
- L-21-018, 2 to Updated Safety Analysis Report, Section 4, Figures 4.2-1 to 4.6-9 + (2 to Updated Safety Analysis Report, Section 4, Figures 4.2-1 to 4.6-9)
- EPID:L-2021-DFA-0006 + (2 to Updated Safety Analysis Report, Section 4, Figures 4.2-1 to 4.6-9)
- ML21307A201 + (2 to Updated Safety Analysis Report, Section 5, Figures 5.1-1 to 5.4-21)
- ML21307A213 + (2 to Updated Safety Analysis Report, Section 6, Figures 6.2-1 to 6.9.1)
- ML21307A205 + (2 to Updated Safety Analysis Report, Section 7, Figures 7.2-1 to 7.7-8)
- ML21307A193 + (2 to Updated Safety Analysis Report, Section 9, Figures 9.5-1 to 9.5-26)
- ML22111A191 + (2 to Updated Safety Analysis Report, USAR Cover and List of Effective Pages (Loep))
- ML19092A093 + (2 to Updated Safety Analysis Report. Responses to NRC Questions 005.1 Through 031.20)
- HBL-18-001, 2 to the Defueled Safety Analysis Report, Revision 2 of the License Termination Plan, and Revisions 34, 35, and 36 to the Humboldt Bay Quality Assurance Plan + (2 to the Defueled Safety Analysis Report, Revision 2 of the License Termination Plan, and Revisions 34, 35, and 36 to the Humboldt Bay Quality Assurance Plan)
- ML032250682 + (2 to the Seabrook Station Physical Security Plan)
- PLA-7379, 2 to the Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program + (2 to the Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program)
- ML033100070 + (2 to the Table of Contents and Revision 21 to EP-IP-100, Emergency Classification and Notification)
- ML20064J139 + (2 to the Vendor Inspection Program Plan)
- ML18228A542 + (2 to the Wolf Creek Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan)
- ML030380540 + (2 to the Yankee Nuclear Power Station Security Plan)
- ML030360426 + (2 to the Yankee Nuclear Power Station Security Plan)
- ML25120A374 + (2) Enclosure 1 - Environmental Requests for Additional Information)
- ML25199A185 + (2) Enclosure 1 - HI-STORM FW A10 RAI (Non-Proprietary) Second Batch)
- ML25085A096 + (2) NRC Response on Orano Enrichment USA, LLC Request for Exemption from 10 CFR 51.60(a) - Enclosure Safety Evaluation Report)
- ML24305A157 + (2) Supplement to Integrated Schedule - October 2024)
- ML25125A205 + (2) Supplement to the Integrated Schedule)
- ML21313A119 + (2) VLSSIR Background Presentation Slides)
- ML023650200 + (2, RAI, Boration, Emergency Core Cooling, Containment Spray and Cooling, and Auxiliary Feedwater Systems, Millstone Power Station, Unit No. 2)
- ML063250187 + (2, and 3, Response to Bulletin (Bl) 2005-02)
- ML17331B134 + (2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding)
- ML031920538 + (2, to EP-PS-221, Nearsite Emergency Monitoring Team: Emergency Plan-Position Specific Procedure)