Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20105A247 + (1 to Updated Safety Analysis Report, Chapter 2, Figure 2.1-2, Part 1 of 2)
- ML20105A251 + (1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 2 of 5)
- ML20105A258 + (1 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Control Systems)
- ML18093A963 + (1 to Updated Safety Analysis Report, Chapter 12, Form APF-05-003-01, Rev 0. Redacted)
- ML20105A262 + (1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management)
- ML18093A903 + (1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management)
- ML20105A252 + (1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 3 of 5)
- ML20105A245 + (1 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant)
- ML18093A878 + (1 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant)
- ML18093A895 + (1 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls)
- ML20105A248 + (1 to Updated Safety Analysis Report, Chapter 2, Figure 2.5-1, Part 2 of 2)
- ML18093A945 + (1 to Updated Safety Analysis Report, Chapter 1, Drawings. Redacted)
- ML18093A959 + (1 to Updated Safety Analysis Report, Chapter 10, Drawings)
- ML18093A961 + (1 to Updated Safety Analysis Report, Chapter 11, Drawings)
- ML20105A263 + (1 to Updated Safety Analysis Report, Chapter 12, Radiation Protection)
- ML18093A905 + (1 to Updated Safety Analysis Report, Chapter 12, Radiation Protection)
- ML20105A264 + (1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations)
- ML18093A907 + (1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations)
- ML20105A265 + (1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program)
- ML18093A909 + (1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program)
- ML18093A911 + (1 to Updated Safety Analysis Report, Chapter 15, Accident Analysis)
- ML20105A268 + (1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance)
- ML18093A917 + (1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance)
- ML18093A965 + (1 to Updated Safety Analysis Report, Chapter 18, Drawings)
- ML18093A947 + (1 to Updated Safety Analysis Report, Chapter 2, Drawings)
- ML20105A246 + (1 to Updated Safety Analysis Report, Chapter 2, Site Characteristics)
- ML20105A255 + (1 to Updated Safety Analysis Report, Chapter 4, Reactor)
- ML18093A890 + (1 to Updated Safety Analysis Report, Chapter 4, Reactor)
- ML18093A949 + (1 to Updated Safety Analysis Report, Chapter 5, Drawings)
- ML18093A951 + (1 to Updated Safety Analysis Report, Chapter 6, Drawings)
- ML18093A953 + (1 to Updated Safety Analysis Report, Chapter 7, Drawings)
- ML18093A956 + (1 to Updated Safety Analysis Report, Chapter 8, Drawings)
- ML20105A259 + (1 to Updated Safety Analysis Report, Chapter 8, Electric Power)
- EPID:L-2020-LLA-0006 + (1 to Updated Safety Analysis Report, Chapter 8, Electric Power)
- ML18093A897 + (1 to Updated Safety Analysis Report, Chapter 8, Electric Power)
- ML20105A260 + (1 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems)
- ML18093A899 + (1 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems)
- ML18093A958 + (1 to Updated Safety Analysis Report, Chapter 9, Drawings. Redacted)
- ML20105A244 + (1 to Updated Safety Analysis Report, Cover Sheet and List of Effective Pages)
- ML18093A876 + (1 to Updated Safety Analysis Report, Cover Sheet)
- ML23129A466 + (1 to Updated Safety Analysis Report, Drawing 730E197BB, Rev. 7, Sheet 6b, Reactor Recirculation Controller Configuration)
- ML23129A336 + (1 to Updated Safety Analysis Report, Drawing 2037, Flow Diagram H & V Standby Gas Treatment & Off Gas Filters)
- ML23129A483 + (1 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3)
- ML23129A348 + (1 to Updated Safety Analysis Report, Drawing 117C3349, Installation Penetration Seal - Indication and Control)
- ML23129A443 + (1 to Updated Safety Analysis Report, Drawing 729E589BB, Functional Control Diagram High Pressure Coolant Injection System, Sheet 1)
- ML23129A387 + (1 to Updated Safety Analysis Report, Drawing 2017, Flow Diagram Turb. & Radwaste Bldg. Contaminated Fl. Drain & Radwaste Roof Drain Sys)
- ML23129A410 + (1 to Updated Safety Analysis Report, Drawing 2010, Sheet 3, Flow Diagram Service Air)
- ML23129A367 + (1 to Updated Safety Analysis Report, Drawing 2056 General Arrangement, Intake Structure Plan and Sections)
- ML23129A488 + (1 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch))
- ML23129A374 + (1 to Updated Safety Analysis Report, Drawing 2019, Flow Diagram Main Control Rm. Cable Rm. & Computer RM Heating, Ventilating & Air Condition, Sheet 1)
- ML23129A449 + (1 to Updated Safety Analysis Report, Drawing 791E257, Revision N16, Sheet 3, Elementary Diagram Feedwater Control System)
- ML23129A345 + (1 to Updated Safety Analysis Report, Drawing 2036, Flow Diagram Reactor Building Service Water System, Sheet 1)