Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000296/LER-1983-035-03, /03L-0:on 830620,while Performing Primary Containment Isolation Valve Operability Test,Valve FCV-69-2 Would Not Fully Close.Caused by Valve Operator Motor Breaker Tripping Due to Armature Winding Failure + (/03L-0:on 830620,while Performing Primary Containment Isolation Valve Operability Test,Valve FCV-69-2 Would Not Fully Close.Caused by Valve Operator Motor Breaker Tripping Due to Armature Winding Failure)