Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML023330459 + ((Bfn), Administration of BFN 2002 Initial Senior Reactor Operator (SRO) & Reactor Operator (RO) Examinations)
- ML081010576 + ((Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Insurance Status)
- ML070930689 + ((Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Insurance Status)
- ML060950246 + ((Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Insurance Status)
- ML050460200 + ((Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Insurance Status)
- ML040550496 + ((Bfn), TVA Revision to Implementation Plan Described in Units 2 & 3, Technical Specifications (TS) Change No. 441 Revision 1, Pressure Temperature (P-T) Curve Update)
- ML052280327 + ((Bfn), Unit 1 - Response to NRC Request for Additional Information Regarding the Restart Testing Program)
- L-80-017, (Bfn), Unit 1 - Technical Specifications (TS) Change 437 - Scram Discharge Volume Water Level Setpoint + ((Bfn), Unit 1 - Technical Specifications (TS) Change 437 - Scram Discharge Volume Water Level Setpoint)
- ML091320183 + ((Bfn), Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Response to Round 23 Request for Additional Information (RAI) EMCB.207)
- 05000259/LER-2011-009-02, (Bfn), Unit 1 Regarding Acceptance Criteria During Several Surveillance + ((Bfn), Unit 1 Regarding Acceptance Criteria During Several Surveillance)
- 05000259/LER-2013-008, (Bfn), Unit 1, Fire Damage to Cables in Fire Areas Could Cause Residual Heat Removal Pumps to Spuriously Start + ((Bfn), Unit 1, Fire Damage to Cables in Fire Areas Could Cause Residual Heat Removal Pumps to Spuriously Start)
- ML023600026 + ((Bfn), Unit 1, Regulatory Framework for Restart of Unit 1)
- ML023020209 + ((Bfn), Unit 2, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Request for Relief 2-ISI-13, Examination & Testing of Snubbers)
- ML031350088 + ((Bfn), Unit 3, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Requests for Relief 3-ISI-13, 3-ISI-14 & 3-ISI-15)
- CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485) + ((Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485))
- ML090270451 + ((Bfn), Units 1, 2 and 3 - Technical Specifications (TS) Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 23 Request for Additional Information (RAI) EMCB.203/164 Regarding Steam Dryer Signal)
- ML043370173 + ((Bfn), Units 1, 2 and 3 License Renewal Application, Electrical and Instrument and Control System (I&C) Systems Section 2.5 - Request for Additional Information (RAI))
- ML12143A318 + ((Bfn), Units 1, 2 and 3, Consent and Hearing Waiver Form for Confirmatory Order, EA-12-071)
- ML022200382 + ((Bfn), Units 1, 2, & 3, License Amendment Request, Alternative Source Term)
- CNL-14-089, (Bfn), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN-TS-492) + ((Bfn), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN-TS-492))
- ML090650605 + ((Bfn), Units 1, 2, and 3 - Withdrawal of Proposed Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2. Fire Protection of Safe Shutdown Capability)
- ML030650600 + ((Bfn), Units 2 - Technical Specifications (TS) Change 420 - Safety Limit Minimum Critical Power Ratio (SLMCPR) - Cycle 13 Operation - Response to NRC Request for Additional Information (RAI))
- ML031080140 + ((Brn) - Units 1, 2 & 3 - Technical Specifications (TS) Change 409 - Adoption of TS Task Force (TSTF) Traveler - 287, Revision 5 - Control Room Ventilation System Envelope - Allowed Outage Time)
- BSEP 03-0119, (Bsep), Revisions to Plant Emergency Procedures + ((Bsep), Revisions to Plant Emergency Procedures)
- 05000324/LER-2020-005, (Bsep), Unit 1 Re Condition Prohibited by Technical Specifications Due to Ventilation Charcoal Sample Lab Results + ((Bsep), Unit 1 Re Condition Prohibited by Technical Specifications Due to Ventilation Charcoal Sample Lab Results)
- 05000324/LER-2012-003, (Bsep), Unit 1 Regarding Valid Emergency Diesel Generator Actuation + ((Bsep), Unit 1 Regarding Valid Emergency Diesel Generator Actuation)
- 05000324/LER-2009-002, (Bsep), Unit 1 Regarding Valid System Actuations Due to Loss of Power to Emergency Bus E2 + ((Bsep), Unit 1 Regarding Valid System Actuations Due to Loss of Power to Emergency Bus E2)
- 05000324/LER-2012-007, (Bsep), Unit 1, Loss of Control Room Emergency Ventilation + ((Bsep), Unit 1, Loss of Control Room Emergency Ventilation)
- 05000325/LER-2012-006, (Bsep), Unit 1, Operation Prohibited by Technical Specifications Due to Operation with a Potential for Draining the Reactor Vessel (OPDRV) + ((Bsep), Unit 1, Operation Prohibited by Technical Specifications Due to Operation with a Potential for Draining the Reactor Vessel (OPDRV))
- 05000325/LER-2015-001, (Bsep), Unit 1, Regarding High Pressure Coolant Injection (HPCI) System Inoperable Due to Auxiliary Oil Pump Failure + ((Bsep), Unit 1, Regarding High Pressure Coolant Injection (HPCI) System Inoperable Due to Auxiliary Oil Pump Failure)
- 05000325/LER-2020-004, (Bsep), Unit 1, Setpoint Drift in Main Steam Line Safety Relief Valves Results in Three Valves Inoperable + ((Bsep), Unit 1, Setpoint Drift in Main Steam Line Safety Relief Valves Results in Three Valves Inoperable)
- 05000324/LER-2011-001-01, (Bsep), Unit 2, Regarding Condition Prohibited by Technical Specifications Due to RWCU Instrumentation Inoperable + ((Bsep), Unit 2, Regarding Condition Prohibited by Technical Specifications Due to RWCU Instrumentation Inoperable)
- RA-18-0017, (Bsep), Unit No. 1, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + ((Bsep), Unit No. 1, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- BSEP 16-0111, (Bsep), Unit Nos. 1 & 2, Fifth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident . + ((Bsep), Unit Nos. 1 & 2, Fifth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident .)
- RA-18-0041, (Bsep), Unit Nos. 1 and 2 - Eighth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident. + ((Bsep), Unit Nos. 1 and 2 - Eighth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.)
- BSEP 16-0112, (Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding . + ((Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding .)
- RA-18-0258, (Bsep), Unit Nos. 1 and 2 - Ninth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident. + ((Bsep), Unit Nos. 1 and 2 - Ninth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.)
- RA-18-0234, (Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves + ((Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves)
- RA-18-0052, (Bsep), Unit Nos. 1 and 2, Registration for Use of General License Spent Fuel Casks + ((Bsep), Unit Nos. 1 and 2, Registration for Use of General License Spent Fuel Casks)
- ML13276A021 + ((Bvps), PAR 000 040 485, Notice of RCRA Status)
- L-03-174, (Bvps), Unit 1 & 2, Risk-Information Inservice Inspection Program Relief Request + ((Bvps), Unit 1 & 2, Risk-Information Inservice Inspection Program Relief Request)
- L-04-160, (Bvps), Unit No. 1 BV-1, NRC Bulletin 2004-01 Inspection 60-Day Report for 1R16 + ((Bvps), Unit No. 1 BV-1, NRC Bulletin 2004-01 Inspection 60-Day Report for 1R16)
- ML050040210 + ((Bvps), Unit No. 1 BV-1, NRC Bulletin 2004-01 Inspection 60-Day Report for 1R16)
- L-04-135, (Bvps), Unit No. 1 and No. 2 - Revised Pages for Draft BVPS Physical Security Plan + ((Bvps), Unit No. 1 and No. 2 - Revised Pages for Draft BVPS Physical Security Plan)
- L-04-123, (Bvps), Unit No. 1 and No. 2, Revision to Draft BVPS Physical Security Plan Submitted April 28, 2004 + ((Bvps), Unit No. 1 and No. 2, Revision to Draft BVPS Physical Security Plan Submitted April 28, 2004)
- L-04-043, (Bvps), Unit No. 1 and No. 2, Supplemental Response to the April 29, 2003 Orders to BVPS + ((Bvps), Unit No. 1 and No. 2, Supplemental Response to the April 29, 2003 Orders to BVPS)
- L-07-083, (Bvps): Pipe Rupture Follow-Up Report + ((Bvps): Pipe Rupture Follow-Up Report)
- ML061220553 + ((Bwrog), (Rai), Topical Report (TR) SIR-05-044, Pressure Temperature Limits Report Methodology for Boiling Water Reactors, Revision 0)
- ML060240094 + ((Bwrog), Summary of 12/13/05 Closed Meeting. TAC MC8714)
- ML22124A148 + ((CCNPP) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public))
- ML22124A149 + ((CCNPP) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public))