Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20170B043 + ((6-16-20 FEMA Hq Letter) COVID-19 Preparedness Assessments for FEMA Region IV Commercial NPPs)
- ML20175A569 + ((6-22-20 FEMA Hq Email) Cooper EP Biennial Exercise Exemption Request)
- ML023040649 + ((7 Pm) Notice of Public Meeting to Present to Local Public, Status of NRCs Oversight Panel Activities for Davis-Besse Nuclear Power Station)
- ML030440294 + ((7 Pm) Transcript of Public Meeting Davis-Besse Oversight Panel Activities)
- ML16124B059 + ((7) Robinson 2016-301 Final Administrative Documents)
- ML21194A408 + ((7-13-2021) E-mail NRR Review Hour Estimate Change Supporting the Hi-Lift Crane Proposed License Amendment Request Review)
- ML023240388 + ((7:00 - 9:30) Notice of Public Meeting Status of the Oversight Panel Activities for the Davis-Besse Nuclear Power Station)
- ML022760553 + ((7:00-9:30 P.M.) Notice of Public Meeting to Present to the Public the Status of the NRCs Oversight Panel Activities for Davis-Besse)
- ML20239B045 + ((8-24-2020 FEMA Letter) Results of the Preliminary Capabilities Assessment for the Duane Arnold Energy Center)
- ML021430017 + ((9) TS Pages -SONGS Issuance of Amd 188/179 Tacs. mb4508/mb4509)
- ML021430010 + ((9) TS Pages-SONGS Issuance of Amd 188/179 Tacs. mb4508/4509)
- ML033170419 + ((9:00 A.M. CST) Regulatory Conference, Palisades Preliminary Safety Significance of a 3/25/03, Loss of Offsite Power Event Which Occurre When a Signpost Was Driven Into a Conduit and Damaged a Cable in the Plant Parking Lot)
- ML15159A299 + ((ACHP-Scoping) Notice of Intent to Reinitiate the Environmental Scoping Process for the Review of the Diablo Canyon Power Plant, Units 1 and 2, LRA)
- ML042220226 + ((AH51) Export and Import of Nuclear Material:Nuclear Grade Graphite - Final Rule)
- ML20114E275 + ((ANO) Carbon Fiber Reinforced Polymer (Cfrp) Relief Request Pre-Submittal Meeting with NRC - April 29, 2020)
- ML23285A188 + ((ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3)
- ML23284A371 + ((ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3)
- ML21217A330 + ((ANO) Problem Identification and Resolution (PIR) Request for Information Combined)
- ML22193A026 + ((ANO) RICT License Amendment Request TSTF-505 NRC Pre-Submittal Meeting Presentation - July 13, 2022)
- ML080300245 + ((ANO) Task Interface Agreement (TIA) 2008-001 Closeout Email)
- ML23223A203 + ((ANO) Unit 1 Licensees Slide Presentation for 8/15/23 Public Meeting Pressurizer Heaters)
- ML20211L705 + ((ANO) Units 1 & 2, Pre-Submittal Slide Presentation for August 4, 2020 Public Meeting)
- ML12286A336 + ((ANO) Units 1 and 2, Revision 14 of the ANO Security Plan)
- ML20344A283 + ((Abstract) Applying Single Failure Criteria to Digital I&C Systems)
- ML14288A653 + ((Aka) DG-5038 Public Comment Resolution Table)
- L-05-005, (Amended) Discharge Monitoring Report (NPDES) + ((Amended) Discharge Monitoring Report (NPDES))
- ML23072A089 + ((Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements)
- ML20255A024 + ((Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP))
- EPID:L-2020-LRM-0082 + ((Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP))
- 2CAN010403, (Ano), Unit 2 - Inservice Inspection (ISI) Summary Report + ((Ano), Unit 2 - Inservice Inspection (ISI) Summary Report)
- ML071140024 + ((Ano), Unit 2 - Request for Withholding Information from Public Disclosure)
- 0CAN111203, (Ano), Units 1 & 2, Response to the NRC Request for Notification of Readiness for Inspection of a Safety Culture Theme + ((Ano), Units 1 & 2, Response to the NRC Request for Notification of Readiness for Inspection of a Safety Culture Theme)
- 0CAN042501, (Ano), Units 1 and 2, Emergency Plan On-Shift Staffing Analysis, Revision 4 + ((Ano), Units 1 and 2, Emergency Plan On-Shift Staffing Analysis, Revision 4)
- ML20111A042 + ((April 22, 2020) Slides for Us Nuclear Regulatory Commission Meeting on Regulatory Relief for Medical Licensees During the COVID-19 Public Health Emergency)
- ML020850392 + ((Att 2) Meeting with Federal Emergency Management Agency and Nuclear Energy Institute Exercise Evaluation Methodology and Alert and Notification System-Related Issues)
- ML040930030 + ((Attachment 1): Monitoring the Marine Environment of Long Island Sound at Millstone Power Station, Waterford, Connecticut, Annual Report 2001)
- ML040930039 + ((Attachment 2): Monitoring the Marine Environment of Long Island Sound at Millstone Power Station, Waterford, Connecticut, Annual Report 2002)
- ML040930051 + ((Attachment 3): Report to Millstone Environmental Laboratory, Ecological Advisory Committee, Analysis of Winter Flounder Larvae, by Dr. J. Crivello, University of Connecticut, Storrs, CT, February 12, 2002)
- ML040930052 + ((Attachment 5) Characterization of Winter Flounder (Pseudopleuronectes Americanus) Larval Genetic Stock Structure within Eastern Long Island Sound: Estimation of Larval Entrainment and Recruitment)
- ML071410458 + ((Attachment to Encl 1) Requirements for Fingerprinting and Criminal History Records Checks of Individuals When Licensees Reviewing Official Is Determining Unescorted Access to Spent Fuel Storage Facilities)
- ML102090091 + ((Attachment) Regarding 4th Interval Request for Relief)
- ML023370284 + ((BFN) - Administration of the BFN 2002 Initial Senior Reactor Operator (SRO) and Reactor Operator (RO) Examinations)
- ML071340090 + ((BFN) - Completion of Unit 1 Restart Issues)
- ML031260165 + ((BFN) - No Candidates for Generic Fundamentals Examination Section (Gfes) Examination)
- ML053180451 + ((BFN) - No Comments on NRC Examination)
- ML033430329 + ((BFN) - November 2003 Monthly Operating Report for November 2003)
- ML023220106 + ((BFN) - Preliminary Reactor and Senior Reactor Operator License Applications)
- ML020390403 + ((BFN) - Reduction in Requested Effective Full Power Years (EFPY) for Technical Specifications (TS) Change No. 414 - Pressure - Temperature (P -T) Curve Update)
- ML062500165 + ((BFN) - Reply to NRC Regulatory Issue Summary (RIS) 2006-15, Preparation and Scheduling of Operator Licensing Examinations)
- ML041960182 + ((BFN) - Reply to NRC Regulatory Issue Summary (RIS) 2004-10, Preparation and Scheduling of Operator Licensing Examinations)
- ML022560151 + ((BFN) - Request for Proprietary Meeting - Transition to Framatome Advanced Nuclear Power (Anp) Fuel)