Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2023-TOP-0055 + (Submittal of Approved Terrapower, LLC, Topical Report: Principal Design Criteria for the Natrium Advanced Reactor)
- EPID:L-2018-LRO-0105 + (Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report)
- EPID:L-2021-LRO-0054 + (Submittal of Browns Ferry Unit 2 Reactor Pressure Vessel Vertical Weld Flaw Evaluation)
- NRC Generic Letter 82-19, Submittal of Copies of Documentation to NRC-Copy Requirements for Emergency Plans and Physical Security Plans + (Submittal of Copies of Documentation to NRC-Copy Requirements for Emergency Plans and Physical Security Plans)
- NRC Generic Letter 79-31, Submittal of Copies of Response to 6/29/79 NRC Request + (Submittal of Copies of Response to 6/29/79 NRC Request)
- NRC Generic Letter 82-14, Submittal of Documents to the NRC + (Submittal of Documents to the NRC)
- EPID:L-2023-LRO-0085 + (Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5)
- EPID:L-2020-LLA-0057 + (Submittal of Emergency Plan)
- EPID:L-2019-LLA-0098 + (Submittal of Emergency Plan Revision)
- EPID:L-2023-LLR-0011 + (Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208))
- EPID:L-2017-LLA-0416 + (Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers)
- EPID:L-2018-LLA-0299 + (Submittal of License Amendment Request 18-002 for Revision of the Emergency Plan)
- EPID:L-2019-LLA-0212 + (Submittal of License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage.)
- EPID:L-2018-LRO-0019 + (Submittal of Nineteenth Refueling Outage (1RF19) Steam Generator 180 Day Report)
- EPID:L-2024-LLL-0025 + (Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan)
- EPID:L-2019-LLR-0039 + (Submittal of Pump Relief Requests for the Inservice Testing Program Fourth 10-Year Interval)
- EPID:L-2024-LLR-0018 + (Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval)
- EPID:L-2022-LLR-0070 + (Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval)
- EPID:L-2019-LLR-0028 + (Submittal of Relief Request (19-ON-001) to Utilize Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress)
- EPID:L-2021-LLR-0085 + (Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations)
- EPID:L-2022-LLR-0066 + (Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations)
- EPID:L-2020-LLR-0135 + (Submittal of Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
- EPID:L-2020-LLR-0099 + (Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
- EPID:L-2018-LLR-0053 + (Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval)
- EPID:L-2018-LLA-0571 + (Submittal of Relief Request RR-18-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
- EPID:L-2023-LLR-0042 + (Submittal of Relief Request RR-A25 for Extended License Period)
- EPID:L-2020-LLR-0072 + (Submittal of Relief Request RR-A42 for Inservice Inspection Impracticality During the Third Ten-Year Inservi?E Inspection Interval)
- EPID:L-2024-LLR-0037 + (Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements)
- EPID:L-2020-LLR-0000 + (Submittal of Relief Request for Revision to RV-03 Associated with Fifth Inservice Testing Interval)
- EPID:L-2022-LLR-0017 + (Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval)
- EPID:L-2018-LLR-0391 + (Submittal of Relief Requests Associated with the Fifth Inservice Inspection (ISI) Interval)
- EPID:L-2018-LLR-0088 + (Submittal of Relief Requests Associated with the Fifth and Fourth Lnservice Inspection Intervals)
- EPID:L-2020-RNW-0009 + (Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021)
- EPID:L-2023-LLE-0048 + (Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55)
- EPID:L-2023-LLE-0022 + (Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements)
- EPID:L-2018-JLD-0153 + (Submittal of Request for Extension of Seismic Probabilistic Risk Assessment)
- EPID:L-2017-LLA-0397 + (Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material)
- EPID:L-2017-LLR-0155 + (Submittal of Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces: Attachment 1, Relief Request)
- EPID:L-2017-LLR-0131 + (Submittal of Revised October 2016 Discharge Monitoring Report)
- EPID:L-2017-LLR-0137 + (Submittal of Revised October 2016 Discharge Monitoring Report)
- EPID:L-2020-LLR-0161 + (Submittal of Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval)
- EPID:L-2019-LLR-0098 + (Submittal of Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval)
- EPID:L-2022-SPR-0009 + (Submittal of Revision 2 to the Standard Practice and Procedures Plan (Sppp) for Global Laser Enrichment LLC (Gle) Approval Requested)
- EPID:L-2018-LLA-0110 + (Submittal of Revision 26 to the Updated Final Safety Analysis Report)
- EPID:L-2022-LLR-0059 + (Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements)
- EPID:L-2017-LRM-0044 + (Submittal of Slides for SNC Non-Public Meeting on November 14, 2017)
- EPID:L-2019-LLE-0009 + (Submittal of Spent Fuel Management Plan)
- EPID:L-2018-LRO-0033 + (Submittal of Steam Generator Tube Inspection Report)
- EPID:L-2019-LLA-0238 + (Submittal of Supplement to Nac'S Request for a Revision to Certificate of Compliance No. 9356 for the NAC Magnatran Transportation Package)
- EPID:L-2022-LLR-0056 + (Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10)
- EPID:L-2022-LLR-0042 + (Submittal of Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual)