Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2023-LLL-0016 + (Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals)
- 10 CFR 81.53, Review by the Board + (Review by the Board)
- 10 CFR 13.5, Review by the Reviewing Official + (Review by the reviewing official)
- IP 60857, Review of 10 CFR 72.48 Evaluations + (Review of 10 CFR 72.48 Evaluations)
- NRC Generic Letter 83-09, Review of Combustion Engineering Owners' Group Emergency Procedures Guideline Program + (Review of Combustion Engineering Owners' Group Emergency Procedures Guideline Program)
- EPID:L-2022-LLA-0140 + (Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure)
- 10 CFR 2.913, Review of Restricted Data Or Other National Security Information Received In Evidence + (Review of Restricted Data or other National Security Information received in evidence)
- 10 CFR 2.341, Review of Decisions and Actions of a Presiding Officer + (Review of decisions and actions of a presiding officer)
- 10 CFR 63.16, Review of Site Characterization Activities. + (Review of site characterization activities.<sup><a href="#N_2_6316">2</a></sup>)
- 10 CFR 60.18, Review of Site Characterization Activities. + (Review of site characterization activities.<sup><a href="#N_1_6018">2</a></sup>)
- 10 CFR 26.413, Review Process + (Review process)
- 10 CFR 26.39, Review Process for Fitness-For-Duty Policy Violations + (Review process for fitness-for-duty policy violations)
- TSTF-329 + (Revise 3.4.17 Bases to Match Specification)
- TSTF-195 + (Revise 3.4.6 Action A.1 to Be Consistent with the Specification)
- TSTF-318 + (Revise 3.5.1 for One Lcpi Pump Inoperable in Each of Two ECCS Divisions)
- CAC:MF5026 + (TSTF-37)
- TSTF-346 + (Revise 3.8.1 Actions to Allow Time to Cooldown Under Natural Circulation)
- TSTF-546 + (Revise APRM Channel Adjustment Surveillance Requirement)
- TAC:MF7622 + (Revise APRM Channel Adjustment Surveillance Requirement)
- TSTF-277 + (Revise Accumulator Boron Concentration Verification SR)
- TSTF-117 + (Revise Accumulator Pressure Reference from Pressurizer to RCS)
- TSTF-305 + (Revise Actions for Exiting Physics Tests)
- TSTF-566 + (Revise Actions for Inoperable RHR Shutdown Cooling Subsystems)
- TSTF-571 + (Revise Actions for Inoperable Source Range Neutron Flux Monitor)
- TSTF-220 + (Revise Actions for Inoperable, Misaligned Apsr)
- TSTF-592 + (Revise Automatic Depressurization System (ADS) Instrumentation Requirements)
- TSTF-514 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6017 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME5978 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6514 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME5963 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME5993 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6120 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6698 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6034 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6048 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6036 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6015 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME5989 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6008 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TSTF-114 + (Revise Bases for 3.4.7 to Address DHR Via Natural Circulation)
- TSTF-350 + (Revise Bases for Rspt SR 3.1.5.4)
- TAC:MD8213 + (DC Electrical Rewrite)
- TSTF-111 + (Revise Bases for SRS 3.3.1.16 and 3.3.2.10 to Eliminate Pressure Sensor Response Time Testing)
- TSTF-559 + (Revise Bases to Reflect Revised SL Pressure Limit)
- TSTF-202 + (Revise Battery Surveillance Weekly Frequencies)
- TAC:M97546 + (TSTF-2)
- TSTF-193 + (Revise CE Analog CEA Position Indication Verification)
- TSTF-436 + (Revise Channel Calibration Definition to Address NON-ADJUSTABLE Sensors)
- TSTF-095 + (Revise Completion Time for Reducing Power Range High Trip Setpoint from 8 to 72 Hours)