Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Name" with value "10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • EPID:L-2020-LLR-0141  + ((VCSNS) Unit 1 - Alternative Requests RR-4-25 for Elimination of Reactor Pressure Vessel Threads in Flange Examination for the Remainder of the Fourth 10-Year ISI Interval)
  • EPID:L-2020-LRO-0084  + ((VCSNS) Unit 1 - Special Report (Spr) 2020002 - Steam Generator Tube Inspection Report)
  • EPID:L-2020-LLR-0077  + ((Vcsns), Unit 1 - Alternative Requests RR-4-19 and RR-4-21, Use of a Performance Based Testing Frequency for Check Valves as Alternatives to the Requirements of the American Society of Mechanical Engineers)
  • EPID:L-2017-LLA-0348  + ((Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change)
  • EPID:L-2018-LLA-0267  + ((Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2)
  • EPID:L-2023-LLA-0157  + ((Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension)
  • EPID:L-2021-LLA-0094  + ((Vcsns), Unit 1 - Proposed Amendment to Relocate Unit Staff Qualification from Technical Specifications to Quality Assurance Program Description (QAPD))
  • EPID:L-2022-LLR-0033  + ((Vcsns), Unit 1, Potential Condition Prohibited by Technical Specification 3.8.1.1)
  • EPID:L-2024-LLE-0003  + ((Vnc) Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
  • EPID:L-2019-LLA-0230  + ((Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements)
  • EPID:L-2019-LLA-0203  + ((Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual)
  • 10 CFR 50.76, . Licensee'S Change of Status; Financial Qualifications  + (. Licensee's change of status; financial qualifications)
  • EPID:L-2023-LLL-0013  + (0 to Updated Final Safety Analysis Report)
  • EPID:L-2018-LRM-0021  + (04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump)
  • EPID:L-2022-SPR-0003  + (09-14-2021 Ltr: Exemption Request for NFS NRC-Observed Force-on-Force Exercise)
  • EPID:L-2021-EPR-0003  + (09-17-2021 Ltr: Exemption Request for NFS Biennial Emergency Preparedness Exercise)
  • EPID:L-2017-PMP-0010  + (1 OF 3, LER 16-004-01 for Columbia Generating Station Regarding Automatic Scram Due to Off-site Load Reject)
  • EPID:L-2018-LLL-0008  + (1 OF 4, LER 17-002-00 for Beaver Valley Power Station, Unit No. 1 Regarding Inadequate Emergency Diesel Generator (EOG) Tornado Missile Protection Identified Due to Non-conforming Design Conditions)
  • EPID:L-2020-LRO-0062  + (1 RE22 Inspection Summary Report for Steam Generator Tubing)
  • EPID:L-2020-LLA-0006  + (1 to Updated Safety Analysis Report, Chapter 8, Electric Power)
  • EPID:L-2020-LLA-0198  + (1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan)
  • EPID:L-2021-RNW-0010  + (1. Spec Application for Renewal of CoC 9036)
  • EPID:L-2017-LLA-0103  + (1/18/2018 Summary of Public Meeting with Southern Nuclear Operating Company Issues Associated with the Safety Review of Licensing Actions for Vogtle Electric Generating Plant Units 3 and 4)
  • NRC Generic Letter 84-22, 10 CFR 20.408 Termination Reports - Format  + (10 CFR 20.408 Termination Reports - Format)
  • NRC Generic Letter 85-08, 10 CFR 20.408 Termination Reports - Format  + (10 CFR 20.408 Termination Reports - Format)
  • NRC Generic Letter 95-08, 10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval  + (10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval)
  • EPID:L-2023-LLR-0035  + (10 CFR 50.55a Relief Request RC3-02)
  • EPID:L-2021-LLR-0046  + (10 CFR 50.55a Relief Request RI5-02, Revision 3, and RRS-01, Revision 1)
  • EPID:L-2021-LLR-0044  + (10 CFR 50.55a Relief Request RS-01, Revision 0)
  • EPID:L-2023-LLR-0021  + (10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations)
  • EPID:L-2021-LLR-0081  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-02 (LMT-21-049))
  • EPID:L-2021-LLR-0060  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval PR-04 (L-MT-21-013))
  • EPID:L-2023-LLR-0036  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002 (L-MT-23-024))
  • EPID:L-2021-LLR-0063  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041))
  • EPID:L-2021-LLR-0020  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051))
  • EPID:L-2021-LLR-0021  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051))
  • EPID:L-2020-LLR-0151  + (10 CFR 50.55a Request No. RR-018, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
  • EPID:L-2020-LLR-0050  + (10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections)
  • EPID:L-2023-LLR-0010  + (10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened)
  • EPID:L-2021-LLR-0005  + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension)
  • EPID:L-2022-LLR-0005  + (10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements)
  • EPID:L-2021-LLR-0010  + (10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension)
  • EPID:L-2021-LLR-0009  + (10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension)
  • EPID:L-2021-LLR-0007  + (10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension)
  • EPID:L-2024-LLR-0014  + (10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval)
  • EPID:L-2017-LLR-0130  + (10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2))
  • EPID:L-2020-LLR-0002  + (10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval)
  • EPID:L-2020-LLR-0022  + (10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval)
  • EPID:L-2019-LLR-0055  + (10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2)
  • EPID:L-2021-LLR-0096  + (10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing)