Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2015-048, St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report + (10:44:24, 9 July 2018)
- NL-15-0520, Edwin I. Hatch, Unit 2 - VSP-SNC-HV1-15-013, Cycle 24 Core Operating Limits Report, Version 1, Enclosure 9 + (10:52:43, 9 July 2018)
- NL-15-0520, Edwin I. Hatch, Unit 2 - VSP-SNC-GEN-15-002, Cycle 23 Core Operating Limits Report, Version 2, Non-Proprietary, Enclosure 6 + (10:52:49, 9 July 2018)
- NL-15-0520, Edwin I. Hatch, Unit 1 - VSP-SNC-GEN-15-002, Cycle 27 Core Operating Limits Report, Version 2, Non-Proprietary, Enclosure 3 + (10:52:55, 9 July 2018)
- NL-15-0520, Edwin I. Hatch, Units 1 and 2 - Core Operating Limits Reports (Colrs) and Information Letter of Nfs Lead Test Assemblies + (10:52:59, 9 July 2018)
- RA-15-000, Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data + (10:59:55, 9 July 2018)
- L-2015-052, St. Lucie, Units 1 and 2 - Annual Radioactive Effluent Release Report, January 1, 2014 Through December 31, 2014 + (11:00:24, 9 July 2018)
- L-2015-052, St. Lucie, Units 1 and 2 - Submission of 2014 Annual Radioactive Effluent Release Report, Revision 43 to Offsite Dose Calculation Manual and Revision 14 to Process Control Program + (11:00:28, 9 July 2018)
- RA-15-019, Attachment 9 - EP-AA-1007, Revised Radiological Emergency Plan Annex Information for Peach Bottom Atomic Power Station + (11:02:58, 9 July 2018)
- RA-15-019, Attachment 7 - EP-AA-1008, Revised Radiological Emergency Plan Annex Information for Limerick Generating Station + (11:03:13, 9 July 2018)
- ONS-2015-031, Oconee, Unit 1 - End of Cycle 28 (11EOC28) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval + (11:05:37, 9 July 2018)
- RS-15-069, Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 2 + (11:07:45, 9 July 2018)
- RA-15-019, Attachment 6 - EP-AA-1005, Revised Radiological Emergency Plan Annex Information for LaSalle County Station + (11:09:04, 9 July 2018)
- RA-15-019, Attachment 5 - EP-AA-1004, Revised Radiological Emergency Plan Annex Information for Dresden Station + (11:09:19, 9 July 2018)
- RA-15-019, Attachment 4 - EP-AA-1003, Revised Radiological Emergency Plan Annex Information for Clinton Power Station + (11:09:38, 9 July 2018)
- RA-15-019, Attachment 3 - EP-AA-1002, Revised Radiological Emergency Plan Annex Information for Byron Station + (11:09:53, 9 July 2018)
- RA-15-019, Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors + (11:10:09, 9 July 2018)
- RA-15-019, Exelon - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors + (11:10:13, 9 July 2018)
- ONS-2014-059, Oconee, Units 1, 2 and 3 - Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 7 + (11:20:40, 9 July 2018)
- RA-15-000, Brunswick, Units 1 & 2 and Shearon Harris, Unit 1 - Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 + (11:23:29, 9 July 2018)
- DCL-15-027, Diablo Canyon Power Plant Er Changes Reflected in the Environmental Report Update Amendment 2. Part 8 of 9 + (11:40:46, 9 July 2018)
- DCL-15-027, Diablo Canyon Power Plant Er Changes Reflected in the Environmental Report Update Amendment 2. Part 7 of 9 + (11:40:51, 9 July 2018)
- DCL-15-027, Diablo Canyon Power Plant Er Changes Reflected in the Environmental Report Update Amendment 2. Part 6 of 9 + (11:40:57, 9 July 2018)
- DCL-15-027, Diablo Canyon Power Plant Er Changes Reflected in the Environmental Report Update Amendment 2. Part 5 of 9 + (11:41:03, 9 July 2018)
- DCL-15-027, Diablo Canyon Power Plant Er Changes Reflected in the Environmental Report Update Amendment 2. Part 2 of 9 + (11:41:19, 9 July 2018)
- DCL-15-027, Diablo Canyon Power Plant Environmental Report Changes Reflected in the Environmental Report Update Amendment 2. Part 1 of 9 + (11:41:24, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2.0 Figures - Braidwood - Part 2 of 2 + (11:43:55, 9 July 2018)
- RS-14-338, Braidwood, Units 1 and 2, Byron, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26. (Redacted Version) + (11:45:36, 9 July 2018)
- L-2015-036, St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report - Final Evaluation of Total Residual Oxidant Attenuation + (12:11:35, 9 July 2018)
- BVY 14-033, Attachment a to Petition for Leave to Intervene - Comments & Declarations of Vermont Dept of Public Service Regarding Vermont Yankee Permanently Defueled Emergency Plan and Emergency Action Level Scheme License Amendment Request Bvy 14-03 + (12:14:57, 9 July 2018)
- BVY 14-033, Attachment B to Petition for Leave to Intervene - Comments & Declarations of Vermont Division of Emergency Management & Homeland Security on Bvy 14-033 Vermont Yankee Permanently Defueled Emergency Plan and Emergency Action Level Scheme + (12:15:02, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Appendix C - Turbine Missile Study + (13:25:35, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Appendix B - Construction Material Standards and Quality Control Procedures + (13:25:41, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Appendix D - Computer Programs + (13:25:49, 9 July 2018)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 16 - Technical Specifications + (13:25:55, 9 July 2018)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 15 - Accident Analyses + (13:26:00, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Appendix a - Application of NRC Regulatory Guides + (13:26:13, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 17.0, Quality Assurance + (13:26:18, 9 July 2018)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 11 - Radioactive Waste Mangement + (13:26:39, 9 July 2018)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 10 - Steam and Power Conversion System + (13:26:50, 9 July 2018)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 9 - Auxiliary Systems + (13:27:19, 9 July 2018)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 14 - Initial Test Program + (13:27:28, 9 July 2018)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 13 - Conduct of Operations + (13:27:34, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 4 Reactor + (13:27:52, 9 July 2018)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 7 - Instrumentation and Controls + (13:28:14, 9 July 2018)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Revision 15, Chapter 6 - Engineered Safety Features + (13:28:48, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 5 Reactor Coolant System and Connected Systems + (13:29:05, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2.0 Site Characteristics - Byron + (13:29:46, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2 Figures - Byron - Part 2 of 2 + (13:30:30, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 2.0 Site Characteristics - Braidwood + (13:31:05, 9 July 2018)
- RS-14-338, Byron/Braidwood Nuclear Stations, Updated Final Safety Analysis Report (Ufsar), Revision 15, Chapter 1.0 Intro General Plant Description + (13:31:15, 9 July 2018)