Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212A824 + (20:49:46, 8 January 2025)
- L-81-392, Ack Receipt of IE Insp Rept 50-335/81-15,on 810622-0702. No Proprietary Info.Also Forwards Response to NRC Re Violation Noted in IE Insp Rept.Steps Taken to Store Records in Accordance W/Applicable Requirements + (20:49:47, 8 January 2025)
- ML17212A821 + (20:49:49, 8 January 2025)
- ML17212A817 + (20:49:50, 8 January 2025)
- ML17212A815 + (20:49:51, 8 January 2025)
- ML17212A814 + (20:49:52, 8 January 2025)
- L-81-393, Requests That Info Re Identity of Employees & Positions in IE Investigation Rept 50-335/81-06 Be Withheld Per 10CFR2.790.Info Should Be Deleted as Shown in Encl marked-up Rept + (20:49:53, 8 January 2025)
- L-81-406, Responds to NRC Re Violations Noted in IE Investigation Rept 50-335/81-06.Corrective Actions: Procedure Revised to Require Verification of Actions in Util Responses to Nrc.Procedure Will Be Issued by 811001 + (20:49:55, 8 January 2025)
- ML17212A810 + (20:49:57, 8 January 2025)
- L-81-414, Notifies That Util Will Continue to Use Previously Submitted Proposed Inservice Insp Program Until 910201,subj to Restrictions in NRC + (20:49:58, 8 January 2025)
- L-81-416, Informs of Progress Towards Implementing NUREG-0737 Item II.E.1.2 Safety-grade Equipment Associated W/Automatic Initiation of Auxiliary Feedwater Flow Will Be Installed During Current Refueling Outage + (20:50:00, 8 January 2025)
- ML17212A806 + (20:50:03, 8 January 2025)
- ML17212A792 + (20:50:04, 8 January 2025)
- L-81-410, Forwards Response to NRC Requesting Addl Info Re Core Thermal Hydraulics + (20:50:05, 8 January 2025)
- IR 05000335/1981019 + (20:50:07, 8 January 2025)
- L-81-411, Forwards Response to Generic Ltr 81-14 Re Auxiliary Feedwater Sys Seismic Qualification,Per NRC 810210 Request. Plant & Sys Will Function as Designed & Would Enable Plant to Be Brought to Cold Shutdown Condition Safely + (20:50:09, 8 January 2025)
- ML17212A788 + (20:50:09, 8 January 2025)
- ML17212A784 + (20:50:12, 8 January 2025)
- L-81-407, Forwards Response to NRC 810903 Request for Addl Info Re FSAR Open Items.Ser Can Be Issued + (20:50:13, 8 January 2025)
- ML17212A782 + (20:50:13, 8 January 2025)
- L-81-401, Forwards Monthly Status Rept Re Const/Startup Progress for Aug 1981 + (20:50:15, 8 January 2025)
- ML17212A773 + (20:50:17, 8 January 2025)
- ML17212A772 + (20:50:17, 8 January 2025)
- ML17212A770 + (20:50:18, 8 January 2025)
- ML17212A769 + (20:50:19, 8 January 2025)
- ML17212A766 + (20:50:20, 8 January 2025)
- L-81-408, Forwards Responses to Matls Engineering Branch Request for Addl Info Re Loose Parts Monitoring Sys & Concrete Expansion Anchor Design.Responses Will Be Incorporated Into FSAR in Future Amend + (20:50:21, 8 January 2025)
- ML17212A762 + (20:50:21, 8 January 2025)
- ML17212A759 + (20:50:23, 8 January 2025)
- ML17212A758 + (20:50:24, 8 January 2025)
- ML17212A747 + (20:50:25, 8 January 2025)
- ML17212A745 + (20:50:26, 8 January 2025)
- L-81-403, Forwards Responses to NRC Requests for Addl Info Re FSAR + (20:50:27, 8 January 2025)
- ML17212A742 + (20:50:29, 8 January 2025)
- ML17212A741 + (20:50:33, 8 January 2025)
- ML17212A740 + (20:50:34, 8 January 2025)
- ML17212A738 + (20:50:36, 8 January 2025)
- ML17212A735 + (20:50:36, 8 January 2025)
- ML17212A734 + (20:50:38, 8 January 2025)
- ML17212A732 + (20:50:39, 8 January 2025)
- ML17212A730 + (20:50:40, 8 January 2025)
- W3F1-2017-0060, Closure of Commitment Associated with Control Element Assembly Drop Times + (20:50:40, 8 January 2025)
- L-81-397, Forwards Responses to NRC 810828 Telcon Request for Addl Info Re Main Steam Line Break Reanalysis + (20:50:41, 8 January 2025)
- L-81-395, Responds to NRC Re Low Pressure Turbine Disc Cracking Insps.Util Will Continue Insps Until Satisfactory Solution Eliminating Need for Insps Is Found + (20:50:43, 8 January 2025)
- L-81-398, Advises of Commitment to Reg Guide 1.33,Revision 2,Reg Guide 1.64,Revision 2,Reg Guide 1.144,Revision 1 & Reg Guide 1.38, Revision 2.FSAR Will Be Revised to Reflect Commitments + (20:50:44, 8 January 2025)
- L-81-387, Submits Revisions to FSAR Questions 260.1 & 260.4,per NRC 810902 Telcon Request for Addl Info.Changes Will Be Included in Future FSAR Amend + (20:50:47, 8 January 2025)
- L-81-390, Informs That Response to NRC Safety Evaluation for Environ Qualification of safety-related Electrical Equipment Will Be Submitted by 811001 + (20:50:48, 8 January 2025)
- L-81-386, Informs That All Generic Ltrs Sent to Util Reviewed Per V Nerses Request.Util Has Either Submitted Formal Response or Discussed Subj Matter W/Nrc + (20:50:50, 8 January 2025)
- ML17212A711 + (20:50:51, 8 January 2025)
- L-81-388, Application for Amend to License DPR-67 Submitted as Response to NRC 810728 Info Request & Proposed Amends to Tech Specs Re Boration Control,Moderator Temp Coefficient, Reactor Coolant Pumps & Boron Dilution & Addition + (20:50:52, 8 January 2025)
- ML17212A708 + (20:50:55, 8 January 2025)
- ML17212A707 + (20:50:56, 8 January 2025)